Loading…
Loading…
Tender Value
₹1.3 Cr
EMD Value
₹2.7 L
Closing Date
14 Jul 2026, 6:00 pm7d left
Executive Engineer
B.C. Road Jammu
as refer boq
2026_PHE_314780_4
e-NIT No. 15 of 2026-27
Open Tender
Civil Works
60 days
BC Road Jammu
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Executive Engineer
₹2.7 L
B.C. Road Jammu
6 Jul 2026
6 Jul 2026
15 Jul 2026
6 Jul 2026
14 Jul 2026
8 Jul 2026
7 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches forfoundations, drains,pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,wells, cesspitsand the like not exceeding 10 sqm on plan, including dressing of sidesand ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50metres: All kinds of soil: | 347.76 | Cum | 256.85 | ₹89,322.16 |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches forfoundations, drains,pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,wells, cesspitsand the like not exceeding 10 sqm on plan, including dressing of sidesand ramming of bottoms lift upto 1.5 m, including getting out excavated earth anddisposalofsurplusexcavatedearthasdirected,withinaleadof50metres: OrdinaryRock | 148.44 | Cum | 493.5 | ₹73,255.14 |
| 3 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspitsand the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil: | 4,078.7 | Cum | 479.3 | ₹19,54,920.91 |
| 4 | Dismantling G.I. pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/ by mechanical means including stacking of pipes within 50 meters leadas per direction of Engineer-in-charge: Above 40 mm nominal bore (GI & HDPE) | 1,000 | Mtr | 121.65 | ₹1,21,650 |
| 5 | Welding, including transportation of plant at site etc. complete. By electric plant | 21,526.4 | CM | 6.2 | ₹1,33,463.68 |
| 6 | Making connection of G.I. distribution branch with G.I. main of following sizes by providing and fixing Tee, including cutting and threading the pipe etc. complete 50 to 80 mm nominal bore | 25 | No. | 1,387.25 | ₹34,681.25 |
| 7 | Making connection of G.I. distribution branch with G.I. main of following sizes by providing and fixing Tee, including cutting and threading the pipe etc. complete 25 to 40 mm nominal bore | 15 | No. | 730.25 | ₹10,953.75 |
| 8 | Hand-packing stones in wire-crates; excluding cost o fcrates and stones | 1,242 | Cum | 371.15 | ₹4,60,968.3 |
| 9 | Dumping stone excluding cost of stones. In Horizontal on level | 1,251.08 | Cum | 237.9 | ₹2,97,631.93 |
| 10 | Supply of stone boulder (nallah) nominal size 225 mm | 2,119.18 | Cum | 700 | ₹14,83,426 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.86 MB
BOQ_1019578.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid