Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.3 CrAccepted-AOC MANSA | ₹1.3 Cr | 1 | Accepted-AOC lowest |
| 2 | 2₹1.4 Cr+₹10.7 L (8.42%)Rejected-Finance AKS COLONY MC ZIRAKPUR | ZIRAKPUR | SAS NAGAR | PUNJAB | ₹1.4 Cr+₹10.7 L (8.42%) | 2 | Rejected-Finance Highest |
| Sl No | Description | Qty | Unit | ROHIT GARG CONTRACTOR L1 | M/S H & G ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. Depth upto 0 to 1.5 mtr. | 1 | Cum | 2,000 ₹2,000 Lowest | 2,100 ₹2,100 |
| 2.00 | Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. Depth upto 1.5 to 2.25mtr. | 1 | Cum | 2,000 ₹2,000 Lowest | 2,100 ₹2,100 |
| 3.00 | Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. Depth upto 2.25 to 3 mtr | 1 | Cum | 2,000 ₹2,000 Lowest | 2,100 ₹2,100 |
| 4.00 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. | 1 | Cum | 2,000 ₹2,000 Lowest | 2,200 ₹2,200 |
| 5.00 | Cement Conc.1:2:4 including supply, carriage & with stone ballast or shingle | 1 | Cum | 2,000 ₹2,000 Lowest | 2,200 ₹2,200 |
| 6.00 | Cement concrete 1:4:8 with brick ballast 40mm gauge | 1 | Cum | 2,000 ₹2,000 Lowest | 2,200 ₹2,200 |
| 7.00 | Lowering, jointing and cutting of RCC pipes 500 mm dia into trenches & laying same to correct alignment complete | 1 | Metre | 2,000 ₹2,000 Lowest | 2,200 ₹2,200 |
| 8.00 | Lowering, jointing and cutting of RCC pipes 150 mm dia for vent pipe into Trenches and laying same to correct alignment ( @2.50 metre / No) | 1 | Metre | 2,000 ₹2,000 Lowest | 2,200 ₹2,200 |
| 9.00 | Wrought Iron and mild steel ladders, framed grills, grating etc. complete fixed in position in D-tank.(CSR 2020 Item No.18.4) | 1 | qnt | 2,000 ₹2,000 Lowest | 2,200 ₹2,200 |
| 10.00 | Providing & fixing M.S. foot rests made of 23x25 mm square bar including fixing in Haudis complete with cement concrete 1:2:4 (CSR 2020 Item No.29.35 ) | 1 | Nos | 2,000 ₹2,000 Lowest | 2,200 ₹2,200 |
Tender Value
₹98 L
EMD Value
₹2.0 L
Closing Date
4 May 2026, 9:00 amClosed
DivisionalEngineer SangurBarnalaPWRMDC Divi
DivisionalEngineer SangurBarnalaPWRMDC Division Barnala
Estimate for Relining Lining of WC by laying BM of OL RD 79870 L of Sehna Disty Village Maur Nabha Maur Patiala Distt. Barnala
2026_WR_167078_3
NIT09/2026
Open Tender
Civil Works
Item Rate
180 days
Barnala
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
₹2.0 L
DivisionalEngineer SangurBarnalaPWRMDC Divi
23 Jun 2026
27 Apr 2026
4 May 2026
27 Apr 2026
4 May 2026
27 Apr 2026
30 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. Depth upto 0 to 1.5 mtr. | - | Cum | - | - |
| 2 | Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. Depth upto 1.5 to 2.25mtr. | - | Cum | - | - |
| 3 | Earth work Excavation for pipe line in trenches and pits up to 1.5 meters depth in open area where disposal of surplus earth is done alongwith alignment, including trimming and dressing sides, levelling of beds of trenches to correct grade, cutting joint holes, refilling; consolidation and watering of refill in 15cm layers and Restoration of unmetalled or unpaved surface to its original condition excluding cost of shoring and timbering but including the cost of dewatering of rain water, diversion for traffic, night signals, providing & fixing caution boards, watching, fencing etc. Depth upto 2.25 to 3 mtr | - | Cum | - | - |
| 4 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. | - | Cum | - | - |
| 5 | Cement Conc.1:2:4 including supply, carriage & with stone ballast or shingle | - | Cum | - | - |
| 6 | Cement concrete 1:4:8 with brick ballast 40mm gauge | - | Cum | - | - |
| 7 | Lowering, jointing and cutting of RCC pipes 500 mm dia into trenches & laying same to correct alignment complete | - | Metre | - | - |
| 8 | Lowering, jointing and cutting of RCC pipes 150 mm dia for vent pipe into Trenches and laying same to correct alignment ( @2.50 metre / No) | - | Metre | - | - |
| 9 | Wrought Iron and mild steel ladders, framed grills, grating etc. complete fixed in position in D-tank.(CSR 2020 Item No.18.4) | - | qnt | - | - |
| 10 | Providing & fixing M.S. foot rests made of 23x25 mm square bar including fixing in Haudis complete with cement concrete 1:2:4 (CSR 2020 Item No.29.35 ) | - | Nos | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
Tendernotice_2.pdf
PDF • 0.16 MB
PKG3RD79870L.xls
Tender Documents • 0.04 MB
BOQ_339215.xls
BOQ • 0.30 MB
Corrigendum05of092026.pdf
PDF • 0.03 MB
Corrigendum04of092026.pdf
PDF • 0.03 MB
Corrigendum03of092026.pdf
PDF • 0.03 MB
Corrigendum02of092026.pdf
PDF • 0.03 MB
Corrigendum01of092026.pdf
PDF • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .