Tender Value
₹9.9 L
EMD Value
₹10,000
Closing Date
10 May 2021, 12:00 pmClosed
SE ETC ALIGARH
LAL DIGGI ALIGARH
Annual Maintenance of various 220KV 132KV newly constructed transmission lines under ETD Mainpuri
2021_UPTCL_579757_2
ETC-143/2020-21
Open Tender
Electrical Works
Item Wise
365 days
ALIGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SE ETC ALIGARH
₹10,000
13 May 2021
3 May 2021
10 May 2021
3 May 2021
10 May 2021
3 May 2021
Regular Tower to Tower ground quarterly patrolling of following lines of 220/132 KV detection of defects like missing/theft tower members, hot point, puncture insulator disc, dislocation of vibration dampers/damaged conductor/earthwire, checking of foundation & position of tree in the corridor of the line, patrolling shall be done on quarterly basis i.e. 04 times in a year.
LILO of 220KV Sikandara Rao (220)-Jawaharpur TPS at Kasganj (44 Km x 4 Times )
LILO of 220kV D/C Mainpuri (220) – Kasganj at Jawaharpur TPS transmission line (11.073 Km x 4 Times )
LILO of 132KV Kasganj -Ganjdudwara at Kasganj(220) (14.18 Km x 4 Times )
Thermal Scanning of 220/132 KV Lines. (01 times in year) and submit reports of two sets.
Tower top patrolling of line of faulty section to ascertain the faults like polluted insulators, defective insulators & fitting & red hot jumpers.
LILO of 220KV Sikandara Rao (220)-Jawaharpur TPS at Kasganj (44 Km )
LILO of 220kV D/C Mainpuri (220) – Kasganj at Jawaharpur TPS transmission line (11.073 Km )
LILO of 132KV Kasganj -Ganjdudwara at Kasganj(220) (14.18 Km )
Submission of separate patrolling report for each line on prescribed computerised performa In triplicate (1 Set) after each patrolling dully signed by contractor with In 15 days after completion of patrolling. (3x4 Times)
Lopping, chopping and cutting of trees branches above 0.5 meter grith in the corridor (35 meter for 220 KV lines) line and stacking of above cuttings at proper place far from the line.
Lopping, chopping and cutting of trees branches above 0.5 meter grith in the corridor (27 meter for 132 KV lines) line and stacking of above cuttings at proper place far from the line.
Clearing of bird nest, kites their string and all other related things from the tower of 220/132 KV Lines.
Emergency patrolling of above line during tripping to detect the exact fault location & type of fault or as per direction of engineer in charge of 220/132 KV Lines.
Fabrication & fixing of tower members including cartage of steel angles from S/S store, punching holes for proper placement, tightening of nuts & bolts punching & chamfering at different towerlocation of above Transmission Line.
Tack welding of new nuts & bolts
Back filling of earth across the tower foundation wherever required including cost of material, labour, T&P etc and its transportation up to the site.
Strengthening/replacement of damaged jumpers at tension tower or connecting back jumper in case of jumper faliure
Replacement of damaged/punctured insulators string/disc and fixing new string/disc where required at different tower location of 220/132 KV Lines including cartage of material from store to work site of the above line. All the manpower and T&P shall be provided by contractor.
Suspension String of 220 KV Lines
Suspension String of 132 KV Lines
Tension String of 220 KV Lines
Tension String of 132 KV Lines
Tightening/fixing of missing/displaced vibration dampers /arcing horn
Tightening of jumper at tenstion tower of 220 KV Lines.
Tightening of jumper at tenstion tower of 132 KV Lines.
Replacement of tension fittings/Mid Span joint at varoius locations of 132 KV lines
Carriage and loading/unloading of hardware accessories and material from 220/132 KV various Substations to work site
De-hoisting of conductor from tension / suspension towers with all hardware accessories including lowering the LT lines with proper safely
Replacement of damage tension fitting/dead end between towers jointing new tension fitting with help of compressor Machine .
Hoisting of conductor from towers with all hardware accessories proper safely.
Replacement of tension fittings/Mid Span joint at varoius locations of 220 KV lines
Carriage and loading/unloading of hardware accessories and material from 220/132 KV various Substations to work site
De-hoisting of conductor from tension / suspension towers with all hardware accessories including lowering the LT lines with proper safely
Replacement of damage tension fitting/dead end/Mid span joint between towers jointing new tension fitting with help of compressor Machine .
Hoisting of conductor from towers with all hardware accessories proper safely.
M/S A.K. ENTERPRISES
S.S. TRANSMISSION AND CONSTRUCTION COMPANY
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .