Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
2 Feb 2022, 3:00 pmClosed
EXECUTIVE ENGINEER REW KUPWARA
EXECUTIVE ENGINEER REW KUPWARA
Construction of 10 No. Culverts on Punzwa Vilgaam khull at panchayat Punzwa C
2022_RDPR_158397_5
NIT No 140 of 2021-22 Gen
Open Tender
Civil Works
Item Rate
30 days
EXECUTIVE ENGINEER REW KUPWARA
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Yes
EXECUTIVE ENGINEER REW KUPWARA
Yes
2 Feb 2022
28 Jan 2022
2 Feb 2022
28 Jan 2022
2 Feb 2022
28 Jan 2022
28 Jan 2022 - 28 Jan 2022
Amount
Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix)
Earth work in excavation by mannual mean in trenchs for foundation , drains, pipes , cables etc ( not exceeeding 1.5 mtr in width and for shafts wells , cesspits and the like not exceeding 10sqm on plan , depth upto 1.5 mtr including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be leveled and neatly dressed in . All kind of soil.
Providing and laying of stone soling (hand packed tightly ) incliuding all carriages of Material upto site of work complete Job by MT aas well as HL
P/L in position specified grade e including curing but excluding the cost of centering and shuttering, finishig and reinforcement All work upto plinth level with 1:4:8(1cement:4coarse sand : 8graded stone agg. 40 mm size ) including all carriages by MT as well as HL of material up to site of Work Complete job.
P/L in position cement concrete. of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with 1:3:6(1cement:3 coarse sand : 6 graded stone agg 20 mm size including all carriages by MT as well as HL of material up to site of work complete job.
Providing and laying in position specified grade (M20)of reinforced cement concrete includingcuring but excluding the cost of centering, shuttering, finishing and reinforcement. Allworks upto plinth level ,1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Centering and shuttering incl. strutting propping etc and removal off form work for:- Foundation footings ,bases of columns, spended floors, roofs, landing etc with all carriages of material by MT as well as HL up to site of work Complete job
Steel Reinforcement for R.C.C work, including straightening, cutting, bending, placing in position and binding all complete up to plint level with Hot rolled deformed bars, including all carriages by MT as well as HL up to site of work complete.
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
Providing and fixing of Community Inforamtion board (CIB)
SHEIKH TAHIRUL ISLAM
M/S MOHD IQBAL RATHER
GHULAM QADIR MALIK
ABDUL AHAD MALLA
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .