Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹15.7 L
EMD Value
₹15,700
Closing Date
27 Mar 2024, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EUDC-I, LESA
Office of the SE EUDC-I, LESA
146/EUDC(I)/LESA/2023-24
2024_MVVNL_919758_1
146/EUDC(I)/LESA/2023-24
Open Tender
Electrical Works
Fixed-rate
90 days
in the area under EUDD Rajbhawan
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
Central ban of India
₹15,700
16 Apr 2024
22 Mar 2024
27 Mar 2024
22 Mar 2024
27 Mar 2024
22 Mar 2024
Amount
Safe carriage, loading-unloading with proper stacking of following material from ESC-Daliganj to Work Site/JE -Dump Store –
ST POLE 11/9 MT LONG
PCC POLE 8.5 Mtr Long
LT ABC Cable 3x120+1x95+1x16 Sqmm
LT ABC Cable 3x95+1x70+1x16 Sqmm
LT ABC Cable 3x50+1x35+1x16 Sqmm
11 KV CROSS ARM
ACSR RABIT CONDUCTOR
11/0.4 KV 250 KVA T/F
11/0.4 KV 100 KVA T/F
11/0.4 KV 25/63 KVA T/F
11 KV DISC INSULATOR
11 KV DISC FITTING
STAY SET COMPLETE 1800X16 MM
STAY WIRE 7/10 SWG
MS EARTHING ROD COMPLETE
G.I Wire 4MM 8 SWG
Polymeric 11KV PIN INSULATOR
Safe carriage loading unloading with proper stacking of following material from JE dump store to work site.
ST POLE 11/9 MT LONG
PCC POLE 8.5 Mtr Long
LT ABC Cable 3x120+1x95+1x16 Sqmm
LT ABC Cable 3x95+1x70+1x16 Sqmm
LT ABC Cable 3x50+1x35+1x16 Sqmm
11 KV CROSS ARM
ACSR RABIT CONDUCTOR
11/0.4 KV 250 KVA T/F
11/0.4 KV 100 KVA T/F
11/0.4 KV 25/63 KVA T/F
11 KV DISC INSULATOR
11 KV DISC FITTING
STAY SET COMPLETE 1800X16 MM
STAY WIRE 7/10 SWG
MS EARTHING ROD COMPLETE
G.I Wire 4MM 8 SWG
Polymeric 11KV PIN INSULATOR
Fabrication & erection of single pole for HT/LT line on 11/09 M long ST pole with fixing of necessary clamps & other acessories.(all material arranged by contractor except steel & pole if required).
Fabrication & erection of single pole for LT line on 8.5 Mtr Long PCC pole with fixing of necessary clamps & other acessories.(all material arranged by contractor except steel & pole if required).
Stringing,Sagging,winding and jumpering of LT line with AB Cable (3x120+1x95+1x16) conductor as per RESSPO Norms.(AB Cable provided by deptt and balance material like holding clamp,eye hook,suspension clamp and dead end clamp arranged by contractor .)
Stringing,Sagging,winding and jumpering of LT line with AB Cable (3x95+1x70+1x16) conductor as per RESSPO Norms.(AB Cable provided by deptt and balance material like holding clamp,eye hook,suspension clamp and dead end clamp arranged by contractor .)
Stringing,Sagging,winding and jumpering of LT line with AB Cable (3x50+1x35+1x16) conductor as per RESSPO Norms.(AB Cable provided by deptt and balance material like holding clamp,eye hook,suspension clamp and dead end clamp arranged by contractor .)
Chemical Earthing system with outer pipe diameter 50mm, inner Strip 40x6, length 3000 mm. galvanization up to 200 micro, earthing pipe with crystalline conductive mixture filled inside the pipe with anti-corrosion & high conductive along with 50 Kg(As per required) of BFC which should be capable to reducing the soil resistively with good moisture retaining capacity. (Specification of chemical earthing and drawing is hereby enclosed). All material shall by supply by the contractor.
Sagging of ACSR RABIT Conductor.
Construction of T/F plinth of size 1.5x1.5x1 M on a padding 0.25M deep in ground 1:5:10 cemend sand and brick ballast on the top of padding brick work Ist class brick of 0.95 mtr hight & 0.35 mtr wall will be constructed.Rest wall should be 0.23 mtr thick.brick work in ratio 1:4 cement & cores Sand in the hollow portion the sand should be fiilled from the ground level up to 15 centimeter below from the top of wall,Cement,sand & brick Ballasts should be filled up to 15 centimeter.Two no. of channel 100x50 in length 1500mm will be grouded.0.35 CM.RCC will be done with cores sand,cement and stone ballast in the ratio of 1:2:4.The t/fs plinth should be plastered on all sides 12mm thick in ratio 1:6 by cement and cores sand. (All the material will be arranged by the contractor .)
Providing earthing strip size 50x6mm and connecting from earthing pipe/m.s.earting rod to fuse unit/tronsformer body/ neutral earthing(Earthing rod & earthing strip arranged by contractor).
Construction of retaining wall, fabrication & erection of Wire mesh fencing around Transformer and Distribution Pillar Box with retaining wall & 1 no. gate with locking arrangement made of MS Angle iron of size 50x50x6 mm jointed with nuts and bolts. The panel must be supported with MS Flat of size 50x6 mm. Wiremesh of size 10 SWG rectangle type, its painting as per norms of RESSPO. (All the material will be arranged by the contractor at his own cost).
Grouting of pole in depth of 1/6 the length of pole in ratio 1:4:8 in cement sand and brick balast as per RESPO norms.
Construction of pole plinth 300mm x 450 mm above ground level in 1:2:4 in cement, coarse sand and stone gritt as per RESPO norms.
Painting of new erected ST pole with two coat of red oxide paint,PO red paint at top of pole 2 M & balance by two coats of best quality aluminium paint ISI of Burger/Nerolac/Asian mark as per norms.
Construction of massonary type Distribution Pillar box with first class brick ballast cement, coarse sand, local sand, brick ballast and MS Round bar of 10 mm dia including Straight MS Angle 50X50X6X750 mm- (All the material will be arranged by the contractor).
Suppy & fixing of henless fuse unit 500 amp 650 volts
Supply & Fixing of CU L-Piece for 250 KVA T/F
Supply of copper stripe of size 50x50x6 mm
Installation of 11/0.4 KV 25/63/100/250 KVA T/F (by crane)
Removal of connections from the system, safe Loading- carriageunloading of damaged T/F from site to Store Centre Daliganj/ Transformer repair workshop, Aliganj
100/63/25/16/10 KVA Transformer by tractor trolley/Crane)
All txess as applicable shall be paid time to time extra
P.S. ENTERPRISES
S.M.ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .