Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 CrAccepted-Finance | ₹3.4 Cr | L1 | Accepted-Finance Accepted being L1 |
| 2 | L2₹3.5 Cr+₹7.4 L (2.17%)Rejected-Finance | ₹3.5 Cr+₹7.4 L (2.17%) | L2 | Rejected-Finance Rejected being L2 |
| 3 | L3₹36.0 Cr+₹32.6 Cr (953.1%)Rejected-Finance | ₹36.0 Cr+₹32.6 Cr (953.1%) | L3 | Rejected-Finance Rejected being L3 |
| 4 | L4₹4.0 Cr+₹54.5 L (16.0%)Rejected-Finance | ₹4.0 Cr+₹54.5 L (16.0%) | L4 | Rejected-Finance Rejected being L4 |
| 5 | Rejected-Technical | - | - | Rejected-Technical Technically non responsive |
Tender Value
₹3.2 Cr
Closing Date
5 Jul 2021, 12:00 pmClosed
Chief Engineer Project Sampark
HQ CE Project Sampark near kunjwani chowk Jammu
CONSTRUCTION OF PMT SINGLE ACCOMMODATION AT HQ 69 RCC COMPLEX (SAMBA) UNDER 13 BRTF PROJECT SAMPARK IN J K UT UNDER JOB NO. 20 A 270 CORRIGENDUM 2ND CALL
2021_BRO_633178_1
CE(P) SPK/03/2021-22
Open Tender
Civil Works - Buildings
Lump-sum
365 days
AT HQ 69 RCC COMPLEX (SAMBA) UNDER 13 BRTF
As per tender documants
17 documents required · 17 mandatory
₹0
Exempted
HQ CE Project Sampark
23 Aug 2021
10 Jun 2021
6 Jul 2021
10 Jun 2021
5 Jul 2021
21 Jun 2021
11 Jun 2021 - 16 Jun 2021
18 Jun 2021
Amount
Soil investigation, preparation of architectural and structural design of RCC double storied framed structure, drawing, proof check and construction of 02 Nos JCO’s single living accommodations(24 Nos room set in 02 floors of 02 Nos of building i.e. 06 rooms per floor as key plan attached) complete in all respect as shown in drawings and as specified in special condition and particular specifications including water supply system, sanitary/plumbing works, electrifications, sewage disposal and area drainage system.
SSoil investigation, preparation of architectural and structural design of RCC double storied framed structure, drawing, proof check and construction of NCO’s single living accommodations(12 Nos room set in 02 floors i.e. 06 No rooms per floor as key plan attached) complete in all respect as shown in drawings and as specified in special condition and particular specifications including water supply system, sanitary/plumbing works, electrifications, sewage disposal and area drainage system.
Soil investigation, preparation of architectural and structural design of RCC double storied framed structure, drawing, proof check and construction of OR’s single living accommodations(20 Nos room set in 02 floors i.e. 10 rooms per floor as key plan attached) complete in all respect as shown in drawings and as specified in special condition and particular specifications including water supply system, sanitary/plumbing works, electrifications, sewage disposal and area drainage system.
Continental Enterprises
SHIV SHAKTI ENTERPRISES
KANHAIYA CONSTRUCTIONS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .