| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-Finance | ₹1.7 L | L1 | Accepted-Finance 1st Lowest Bidder |
| 2 | L2₹1.7 LRejected-Finance | ₹1.7 L | L2 | Rejected-Finance 2nd Lowest Bidder |
| 3 | L3₹1.7 LRejected-Finance | ₹1.7 L | L3 | Rejected-Finance 3rd Lowest Bidder |
| Sl No | Description | Qty | Unit | M/s Meera Enterprises L1 | M/S PRABHATT ENGINEERING WORKS L2 | K. D AND GUPTA ELECT. AND ENGG. WORKS L3 |
|---|---|---|---|---|---|---|
| 1.00Periodic Patrolling and Routine/Preventive/Breakdown Maintenance of 33KV Incoming Line from 132KV S/S Shatrughnpur, 33kV Shatrughnpur- 400KV Motiram Adda, Gorakhpur for Sub Station & Colony Supply alongwith other associated Works for the Period of 12 Months with all Cost of Men, Materials Misc. Consumables T&P's etc. Required for Satisfactory Completion of the Work, as per Technical Specification and Direction of Supervising Engineer. | ||||||
| 1.01 | Monthly Patrolling of 33KV Incoming Lines from 132KV S/S Shatrughnpur, 33kV Shatrughnpur- 400KV Motiram Adda, Gorakhpur for Sub Station & Colony Supply and Providing of Patrolling Report. (9 Km length 12 Months) | 12 | Job. | 2,400 ₹28,800 | 2,400 ₹28,800 | 2,405 ₹28,860 |
| 1.02 | Emergency Patrolling of 33KV Incoming Lines from 132KV S/S Shatrughnpur, 33kV Shatrughnpur- 400KV Motiram Adda, Gorakhpur for Sub Station & Colony Supply at 400KV S/S Motiram adda, Gorakhpur in case of Breakdown.(9 Km Length 6 Times) | 6 | Job. | 2,400 ₹14,400 | 2,400 ₹14,400 | 2,405 ₹14,430 |
| 1.03 | Periodic Lopping & Chuapping of Branches of different types of Trees like Mango, Neem, Sheesham, Peepal, Semal, Eucalyprus, Popular etc. Falling in Curridor of the above 33KV Power Lines to Provide Minimum Clearance of about 8 Meter between the Trees & Conductors on both side of the Line with all due Care of Safety & Precautions to avoid any damage to nearby Buildings, Power Lines Passing Nearby, Crops, other Nearby Trees etc. The Work also includes removing, Eliminating & Cleaning the Line Sites after Lopping & Chopping of the Trees during the Period of 12 Months. | 150 | No. | 98 ₹14,700 | 98 ₹14,700 | 98 ₹14,700 |
| 1.04 | Fixing of Y type cross arm, MS channel of guarding wire and E-clamping of tubular pole with MS clamps of suitable sizes at suitable distance so that proper clearance may be maintained as per direction of supervising engineer. Materials provided by department free of cost as per requirement. Labour and T&P provided by the contractor at his own cost. | 4 | Job. | 1,250 ₹5,000 | 1,250 ₹5,000 | 1,250 ₹5,000 |
| 1.05 | Stringing and re-sagging of Guard wire of Link Road crossing, NHI crossing, 11 kV line crossing and LT line crossing with proper clearance from ground level to conductor and line to line. Work supervising by Assistant/Junior Engineer. | 6 | Job. | 3,000 ₹18,000 | 3,000 ₹18,000 | 3,000 ₹18,000 |
| 1.06 | Providing and fixing of new 33KV Pin Insulator complete with Gl Pin. Nut & Bolts in place of damaged one as per Requirement. | 12 | Job. | 890 ₹10,680 | 890 ₹10,680 | 895 ₹10,740 |
| 1.07 | Providing and fixing of new PG Clamp with (Dog to Dog & weisel to weisel) Nut & Bolt in place of damaged one as per Requirement. | 8 | No. | 590 ₹4,720 | 595 ₹4,760 | 600 ₹4,800 |
| 1.08 | Tightening of Jumper/ Clamp including Replacement of Damaged Nut-Bolts & Washers, if any by new ones to be Provided by the Department Free of Cost as per Requirement. | 6 | Job. | 195 ₹1,170 | 200 ₹1,200 | 200 ₹1,200 |
| 1.09 | Replacement of Damaged Jumper by new One whenever Snapping Occurs. The Location of Snapped Jumper will be Informed by the Supervising Engineer. | 8 | Job. | 735 ₹5,880 | 740 ₹5,920 | 745 ₹5,960 |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
20 Apr 2026, 10:00 amClosed
Executive Engineer
Office of Executive Engineer Electricity 400 KV Sub Station Division Motiram Adda, Gorakhpur
Periodic Patrolling and Routine/Preventive/Breakdown Maintenance of 33 KV Incoming Line from 132KV S/S Shatrughnpur, (Shatrughnpur 400 KV Motiram Adda) for Substation and Colony Supply at 400 KV S/S Motiram Adda, Gkp under Electy. 400KV S/S Div GKP
2026_UPTCL_1115264_1
E-TENDER No. 31/400KV/SSD/GKP/2025-26
Open Tender
Electrical Works
60 days
E400 KV S/S Motiram Adda
Please refer Tender Document
2 documents required · 2 mandatory
₹590
Yes
EE E400 KV S/S Division Gorakhpur
₹2,000
Yes
8 May 2026
20 Mar 2026
20 Apr 2026
20 Mar 2026
20 Apr 2026
20 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Periodic Patrolling and Routine/Preventive/Breakdown Maintenance of 33KV Incoming Line from 132KV S/S Shatrughnpur, 33kV Shatrughnpur- 400KV Motiram Adda, Gorakhpur for Sub Station & Colony Supply alongwith other associated Works for the Period of 12 Months with all Cost of Men, Materials Misc. Consumables T&P's etc. Required for Satisfactory Completion of the Work, as per Technical Specification and Direction of Supervising Engineer. | - | - | - | - | |
Monthly Patrolling of 33KV Incoming Lines from 132KV S/S Shatrughnpur, 33kV Shatrughnpur- 400KV Motiram Adda, Gorakhpur for Sub Station & Colony Supply and Providing of Patrolling Report. (9 Km length 12 Months) | 12 | Job. | - | - | |
Emergency Patrolling of 33KV Incoming Lines from 132KV S/S Shatrughnpur, 33kV Shatrughnpur- 400KV Motiram Adda, Gorakhpur for Sub Station & Colony Supply at 400KV S/S Motiram adda, Gorakhpur in case of Breakdown.(9 Km Length 6 Times) | 6 | Job. | - | - | |
Periodic Lopping & Chuapping of Branches of different types of Trees like Mango, Neem, Sheesham, Peepal, Semal, Eucalyprus, Popular etc. Falling in Curridor of the above 33KV Power Lines to Provide Minimum Clearance of about 8 Meter between the Trees & Conductors on both side of the Line with all due Care of Safety & Precautions to avoid any damage to nearby Buildings, Power Lines Passing Nearby, Crops, other Nearby Trees etc. The Work also includes removing, Eliminating & Cleaning the Line Sites after Lopping & Chopping of the Trees during the Period of 12 Months. | 150 | No. | - | - | |
Fixing of Y type cross arm, MS channel of guarding wire and E-clamping of tubular pole with MS clamps of suitable sizes at suitable distance so that proper clearance may be maintained as per direction of supervising engineer. Materials provided by department free of cost as per requirement. Labour and T&P provided by the contractor at his own cost. | 4 | Job. | - | - | |
Stringing and re-sagging of Guard wire of Link Road crossing, NHI crossing, 11 kV line crossing and LT line crossing with proper clearance from ground level to conductor and line to line. Work supervising by Assistant/Junior Engineer. | 6 | Job. | - | - | |
Providing and fixing of new 33KV Pin Insulator complete with Gl Pin. Nut & Bolts in place of damaged one as per Requirement. | 12 | Job. | - | - | |
Providing and fixing of new PG Clamp with (Dog to Dog & weisel to weisel) Nut & Bolt in place of damaged one as per Requirement. | 8 | No. | - | - | |
Tightening of Jumper/ Clamp including Replacement of Damaged Nut-Bolts & Washers, if any by new ones to be Provided by the Department Free of Cost as per Requirement. | 6 | Job. | - | - | |
Replacement of Damaged Jumper by new One whenever Snapping Occurs. The Location of Snapped Jumper will be Informed by the Supervising Engineer. | 8 | Job. | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
TECHNICAL_31.pdf
Tender Documents • 1.09 MB
BOQ_2069094.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid