| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.6 CrAccepted-AOC | ₹1.6 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹1.6 Cr+₹3.2 L (2.03%)Rejected-Finance 1 142 CHINNAPOSALIUR MARAMANGALATHUPATTI SALEM SALEM TAMIL NADU 636030 | SALEM | TAMIL NADU | 636030 | ₹1.6 Cr+₹3.2 L (2.03%) | 2 | Rejected-Finance L2 |
Tender Value
₹1.6 Cr
EMD Value
₹3.3 L
Closing Date
26 Nov 2020, 3:00 pmClosed
ADDITIONAL COLLECTOR DRDA MADURAI -20
DRDA MADURAI -20
MADURAI DISTRICT/MELUR BLOCK/ PMGSY III (2020-21) BATCH I / PACKAGE NO 08 -130
2020_RDTN_101853_1
TN08130
Open Tender
Civil Works - Roads
Piece-work
270 days
Melur
Refer Tender document
4 documents required · 4 mandatory
₹0
₹3.3 L
DRDA MADURAI -20
19 Feb 2021
23 Oct 2020
26 Nov 2020
24 Oct 2020
26 Nov 2020
28 Oct 2020
11 Nov 2020
Amount
Clearing and Grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. (i) (A) - By Manual Means (In Area of Non - Thorny Jungle) Km 0/0-2/725
Scarifying the Existing Bituminous road surface to a depth of 100 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. Km 0/0-2/725
Construction of Embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (Sub Grade)
Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Gravel Shoulder)
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.(WMM) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.(WMM)
Providing and laying Bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504.
Providing and applying Prime Coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502. (i) Low Porosity
Providing, laying and rolling of Open-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509
Providing and laying Seal Coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510. (ii) Bitumen (S-65)
Provision of Rumble strips covered with premix bituminous carpet, 15-20 mm high at centre, 250 mm wide placed at 1 m centre-to-centre at approved locations to control speed, marked with white strips of road marking paint.
Road Marking
Road Studs
Provision for Name Board
Provision for PMGSY Logo Board
Provision for Sign Board
Provision for Chevron Sign Octogan Board (90cm)
Provision for Mandatory Sign Board
Provision for Reflector
Provision for Citizen Board
Provision for MaintanenceBoard
Provision for KM Stone
Provision for HM Stone
Construction of 1.50m RCC Culvert at Ch 1350m
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.
Removal of Pipes
Removal of Body wall
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed . For Footings as 4% Rate for Centering Works
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For STEM as 10% Rate for Centering Works
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Construction of 2 X 5.00m RCC Culvert at Ch 2215m
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.
Removal of Pipes
Removal of Body wall
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed . For Footings as 4% Rate for Centering Works
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For STEM as 10% Rate for Centering Works
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Construction of Side Drain 50m at Ch 2500
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Vibrated Reinforced cement concrete M25 ISS hard granite broken metal including cost and conveyance of all materials to site and cement at site including cost of formwork,lead for soft water, labour charges for mixing, transporting, laying, and curing concrete working in heights and hire charges for tools and plants, and all other incidental charges etc complete as per relevant specification for COVER SLAB
Supply and fabrication of S-415 steel required for all RCC items of works involved in the schedule cost of steel at site fabrication,labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc,complete, S-415 grade
Routine Maintenance after completion of work
Towards the charges for routine maintenance of the road work executed under Bharat Nirman including dressing of bermsby refilling the gully with form berms, desilting of side drains and CD works , Whitewashing guardstones, painting of KM & HM stones,Parapets, cutting of breaches of trees, refixing displaced guard stones , caution boards, speed limit boards etc with the periodiocity for the above actitvities as prescribed in IRC SP 20-2002 and as directed by the departmental officers except for the constructional defects which has to be rectiufied by the contractor at his own cost.
For the second six months from the date of completion of work
For the second year from the date of completion of work
For the third year from the date of completion of work
For the fourth year from the date of completion of work
For the fifth year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
MPS AND CO
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .