Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.3 LAccepted-AOC BHAGIRATHIPUR DOMKAL MSD | DOMKAL | MURSHIDABAD | WEST BENGAL | 742101 | ₹22.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹22.3 L+₹1,500 (0.07%)Rejected-Finance ALAMPUR NODAKHALI | ₹22.3 L+₹1,500 (0.07%) | L2 | Rejected-Finance Higher than L1 |
| 3 | L3₹22.3 L+₹4,260 (0.19%)Rejected-Finance 17 1 ABHOY HALDER LANE KOLKATA | KOLKATA | ₹22.3 L+₹4,260 (0.19%) | L3 | Rejected-Finance Higher than L1 |
| Sl No | Description | Qty | Unit | M/S.S.S.ENTERPRISE L1 | ORIENTAL ENGINEERING CO. L3 | S. P. CONSTRUCTION L2 |
|---|---|---|---|---|---|---|
| 1.00 | Operation and guarding of 4 nos centrifugal pumping machinery (125 Kw- high lift pump) and L.T. Control panel and distribution panel, MCC/ panel / Starter. Electrical gadgets and lighting arrangement of the pumping station by engaging skilled and semi-skilled personnels for as and when required as per direction on the site condition demand including operation of 250mm dia and 300 mm dia. Butterfly valve (4+1) at individual delivery and common header of high lift pumping machinery for maintaining water supply towards Budge-I block from 01-08-2026 to 31-07-2027 | 12 | Months | 1,66,887 ₹20,02,644 Lowest | 1,66,980 ₹20,03,760 | 1,66,900 ₹20,02,800 |
| 2.00 | Periodical inspection by licensed electrician & supervisor along with pump technician, helper, for checking 2 nos PDB panel, 1 No MCC panel for 125 KW motor 4 nos Butterfly valves on individual delivery and 1 no Butterfly valve on common manifold along with illumination system & all other mechanical installation e.g. flow meter (clear water) to keep the system in healthy condition. | 12 | Months | 10,500 ₹1,26,000 Lowest | 10,700 ₹1,28,400 | 10,600 ₹1,27,200 |
| 3.00 | Day to day maintenance for upkeepment of all electrical & mechanical installation as and when required by providing all necessary incidental charges required to execute maintenance as well as guarding work. | 12 | Months | 8,438 ₹1,01,256 Lowest | 8,500 ₹1,02,000 | 8,450 ₹1,01,400 |
| 3.01N.B:- 1. Quoted rate should be inclusive of ESI, PF as per latest amendment and also comply with the Notification no.- 06/STAT/12RW/03/2023/LCS, dt. 02/04/2025 of the office the Labour Commissioner, Govt of W.B. & Reference Memo No- PHE/1095/O-5/16 (Pt) Dated- 22-05-2025 of the Deputy Secretary to the Govt. of West Bengal 2. GST exempted related to Article 243G/243W of the Constitution of India and CGST Rate Notification No. 12/2017-Central Tax (Rate) and corresponding WBGST Rate Notification No. 1136-FT, both dated 28.06.2017, as amended from time to time. | ||||||
Tender Value
Refer Docs
EMD Value
₹46,000
Closing Date
22 Jul 2026, 2:00 pmClosed
Executive Engineer SMD PHE Dte
Chetla
Operation and maintenance of pumping machineries under coverage of Budge Budge-I Block Rural from the Mega Surface Based water supply Project of Falta Mathurapur in South 24pgs district under South 24pgs Mechanical Division, PHE Dte.
2026_PHED_1030312_26
WBPHE/EE/SMD/NIeT-06 of 2026-27
Open Tender
Electrical Work/ Equipment
Item Rate
365 days
Budge Budge
Please refer Tender documents.
6 documents required · 6 mandatory
₹46,000
18 Aug 2026
3 Jul 2026
24 Jul 2026
3 Jul 2026
22 Jul 2026
3 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Operation and guarding of 4 nos centrifugal pumping machinery (125 Kw- high lift pump) and L.T. Control panel and distribution panel, MCC/ panel / Starter. Electrical gadgets and lighting arrangement of the pumping station by engaging skilled and semi-skilled personnels for as and when required as per direction on the site condition demand including operation of 250mm dia and 300 mm dia. Butterfly valve (4+1) at individual delivery and common header of high lift pumping machinery for maintaining water supply towards Budge-I block from 01-08-2026 to 31-07-2027 | |||||
| 2Periodical inspection by licensed electrician & supervisor along with pump technician, helper, for checking 2 nos PDB panel, 1 No MCC panel for 125 KW motor 4 nos Butterfly valves on individual delivery and 1 no Butterfly valve on common manifold along with illumination system & all other mechanical installation e.g. flow meter (clear water) to keep the system in healthy condition. | |||||
| 3Day to day maintenance for upkeepment of all electrical & mechanical installation as and when required by providing all necessary incidental charges required to execute maintenance as well as guarding work. | |||||
| 3.01 | N.B:-
1. Quoted rate should be inclusive of ESI, PF as per latest amendment and also comply with the Notification no.- 06/STAT/12RW/03/2023/LCS, dt. 02/04/2025 of the office the Labour Commissioner, Govt of W.B. & Reference Memo No- PHE/1095/O-5/16 (Pt) Dated- 22-05-2025 of the Deputy Secretary to the Govt. of West Bengal
2. GST exempted related to Article 243G/243W of the Constitution of India and CGST Rate Notification No. 12/2017-Central Tax (Rate) and corresponding WBGST Rate Notification No. 1136-FT, both dated 28.06.2017, as amended from time to time. | - | - | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
Tendernotice_2.pdf
PDF • 0.25 MB
TCElec.pdf
Tender Documents • 0.21 MB
BOQ_2531302.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .