| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹63.7 LAccepted-AOC SHUKIA MORE MORWA DISTT SINGRAULI MP | MORWA | SINGRAULI | MP | L1 | Accepted-AOC AWARD OF WORK TO SINGLE QUALIFIED BIDDER | |
| 2 | Rejected-Technical DHOTI VINDHYANAGAR WAIDHAN DIST SINGRAULI M P 486885 | WAIDHAN | SINGRAULI | MADHYA PRADESH | 486885 | - | Rejected-Technical Experience is not same as similar nature of work i.e. repairing of swing system OR its components of Dragline OR refurbishment of Dragline OR erection and commissioning of / Dragline / Shovel of capacity 10 Cum and aboveas per NIT clause 8A |
Tender Value
₹71.9 L
EMD Value
₹89,900
Closing Date
9 Aug 2023, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GENERAL MANAGER EXCAVATION
NCL KHADIA PROJECT, SHAKTINAGAR, SONEBHADRA, U.P.
Replacement of old worn out rack gear and 04 nos. swing pinions with the serviceable assemblies in ESH 20/90 Baidyanath Dragline of Khadia Project
2023_NCL_284005_1
KHD/G.M. (Excv)/E-Tender/23-24/388
Open Tender
Excavation Department Work
Item Rate
92 days
NCL KHADIA PROJECT, SHAKTINAGAR
Please refer Tender documents.
6 documents required · 6 mandatory
₹89,900
29 Sept 2023
21 Jul 2023
11 Aug 2023
21 Jul 2023
9 Aug 2023
22 Jul 2023
21 Jul 2023 - 26 Jul 2023
Amount
• Scope of Work/Technical Specifications etc: 1. Cleaning of cardium/grease/oil/waste foreign materials around working area, swing rack segment, deck and under revolving frame. 2. Removal of old worn out bush of center pintle and re-fitment of new bush. 3. Removal of Hoist & Drag ropes, 02 nos. rope tray, 04 nos. swing gear box, 04 nos. swing pinion shaft assy. & refitting. 4. Fabrication of support, stand, packing for resting and lifting of machine for fitment of center pintle bush and Rack segments/Rack Gear. 5. Fitment and removal of support under the counter weight for balancing the machine structure. 6. Removal of old and fitment of new rack gear (12 segments) and torqueing of bolts.
Labour charges for Cleaning of cardium/grease/oil/waste foreign materials around working area, swing rack segment, deck and under revolving frame. Note:- It includes a group of 04 Nos. Semi Skilled & 08 Nos. Un-Skilled manpower in 02 shifts for 15 days.
Labour charges for Removal of old worn out bush of center pintle and re-fitment of new bush. Note:- It includes a group of 04 Nos. Skilled Fitter , 01 No. Skilled Welder & 06 Nos. Semi-Skilled manpower in 02 shifts for 05 days.
Labour charges for Removal of Hoist & Drag ropes, 02 Nos. rope tray, 04 nos. swing gear box, 04 Nos. swing pinion shaft assy. & refitting. Note:- It includes a group of 04 Nos. Skilled Fitter , 03 Nos. Skilled Welder & 08 Nos. Semi-Skilled manpower in 02 shifts for 30 days.
Labour charges for Fabrication of support , stand, packing for resting and lifting of machine for fitment of center pintle bush and Rack segmenta/Rack Gear. Note:-It includes a group of 04 Nos. Skilled Welder , 04 Nos. Skilled Fitter, 02 Nos. Skilled Cutter, 02 Nos. Skilled Rigger & 06 Nos. Semi-Skilled manpower in 02 shifts for 08 days.
Labour charges for Fitment and removal of support under the counter weight for balancing the machine structure. Note:-It includes a group of 02 Nos. Skilled Fitter , 01 No. Skilled Electrician, 02 Nos. Skilled Rigger & 08 Nos. Semi-Skilled manpower in 02 shifts for 04 days.
Labour charges for Removal of old and fitment of new rack gear (12 segments) and torqueing of bolts. Note:-It includes a group of 03 Nos. Skilled Welder/Cutter , 04 Nos. Skilled Fitter, 04 Nos. Skilled Rigger & 08 Nos. Semi-Skilled manpower in 02 shifts for 30 days.
Supervision Charges Note:- It includes 01 No. Skilled Supervisor manpower in 02 shifts for 92 days.
Hiring Charges for above Job
Grinding Machines - 02 Nos. per day
Welding Machines - 02 Nos. per day
Gas Cutting With Accessories - 02 Nos. per day
Hydraulic Jack 400T - 02 Nos. per day
Hydraulic Jack 200T - 02 Nos. per day
Crane 14T - 01 No. per day
Misc. tools and tackles like hammers, spanners, crow bars, D-shackles, jigs & fixtures, hand gloves, inspection lamps, manila rope, cleaning materials, chain blocks.
Special Alignment tools and tackles.
Transportation Charges for manpower to and fro per day
Cost of Grinding Wheel 100mm*25mm.
Cost of Bolt Size: M 68 X 570
Cost of Bolt Size: M 68 X 360
Cost of Nut Size: M 68
Cost of Washer Size: M 68
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
technical_294046.pdf
PDF • 0.10 MB
techsummary_294046.pdf
PDF • 0.19 MB
finance_294046.pdf
PDF • 0.10 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_294046.pdf
PDF • 0.10 MB
scan0629.pdf
PDF • 1.52 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .