Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.8 LAccepted-Finance | ₹5.8 L | 1 | Accepted-Finance Accept |
| 2 | 2₹6.6 LAccepted-Finance | ₹6.6 L | 2 | Accepted-Finance Accept |
| 3 | 3₹6.8 LAccepted-Finance | ₹6.8 L | 3 | Accepted-Finance Accept |
Tender Value
₹7.0 L
EMD Value
₹13,918
Closing Date
13 Apr 2026, 6:00 pmClosed
Udyog Vihar, Sriganganagar
OFFICE OF THE REGIONAL MANAGER RIICO, UDYOG VIHAR, SRIGANGANAGAR
Construction of Road Side wall at Industrial Estate, Sriganganagar
2026_RIICO_550112_1
01/2026-27/(A)
Open Tender
Civil Works
45 days
UDYOG VIHAR
Please refer Tender documents.
4 documents required · 4 mandatory
₹590
RIICO LTD.,
₹13,918
Yes
15 Apr 2026
6 Apr 2026
15 Apr 2026
6 Apr 2026
13 Apr 2026
6 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils | 66.15 | Cum. | 178 | ₹11,774.7 |
| 2 | Brick masonry with F.P.S. bricks of class designation 75 in foundation and plinth with bricks, Cement mortar 1 : 6 (1 cement : 6 coarse sand) | 126.49 | Cum. | 4,263 | ₹5,39,226.87 |
| 3 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level., M15 grade Nominal Mix 1: 2: 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40mm nominal size). | 30.85 | Cum. | 4,544 | ₹1,40,182.4 |
| 4 | Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc. | 30.02 | Sqm. | 157 | ₹4,713.14 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.32 MB
TformA.pdf
Tender Documents • 0.19 MB
BOQ_980698.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid