Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.9 LAccepted-AOC | L1 | Accepted-AOC Found lowest one bidder | |
| 2 | L2₹23.5 L+₹62,594 (2.74%)Rejected-AOC 0 TRESPONE KARGIL JAMMU KASHMIR 194105 | KARGIL | LADAKH | 194105 | L2 | Rejected-AOC Quoted high rate as compared to L1 |
Tender Value
₹19.4 L
Closing Date
11 Mar 2022, 2:00 pmClosed
Executive Engineer
Rural Engineering Wing Leh
Construction of link road from Kakpa Chenmo to Martse Tsaldung Mohalla at Nimoo
2022_RDD_5916_5
NIT 135 - UTL REWL OF 2021-22
Open Tender
Civil Works - Others
Item Rate
60 days
Leh
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
Payable To Executive Engineer
Exempted
23 May 2022
2 Mar 2022
14 Mar 2022
2 Mar 2022
11 Mar 2022
2 Mar 2022
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) over areas (Exceeding 30cm in depth, 1.5mtr in width as well as 10sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.50 m, disposed earth to be levelled and neatly dressed All kind of soil
Random Rubble masonry with hard stone from nallah in foundation and plinth including levelling up with cement concrete 1 :6:12 ( 1 Cement: 6 coarse sand : 12 graded stone aggregate 20mm nominal size) at plinth level with cement mortar 1:6 (1 Cement: 6 coarse sand)
Dry random rubble masonry with hard stone in foundation and plinth:Using nallah stone without bond stone
Carriage of cement and Steel 35 km by M.T
Carriage of sand and Aggregate 10 km by M.T
Carriage of stone 10 km by M.T
Preparation of subgrade by excavating earth to an average of 22.5 em depth, dressing to camber and consolidation with road roller including making good the undulation etc.and disposal of surplus earth upto 50 m~tres.
Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge. With material conforming to Grade-l (size range 75 mm to 0.075 mm) having CBR Value-30
Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the ,. material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base I base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-inCharge.
Providing and applying tack coat using hot straight run bitumen of grade 80/100 including heating the bitumen,spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications. On W.B.M.@ 0.75 Kg/sqm.
2.5 cm premix carpet surfacing with 2.25cu.m. and 1.12 cu.m of stone chippings of 13.2 mm and 11.2 size respectively per 100 sq.m. and 52kg. and 56 kg. of hot bitumen per cu.m. of stone chippings of 13.2 mm and 11.2 mm size respectively including a tack coat with hot straight run bitumen including consolidation with road roller of 6 to 9 tonne capacity etc. complete (tack coat to be paid for separately). 17.47.1 With paving Asphalt 80/100 heated and then mixed with solvent at the rate of 70 sqm 174.55 grams per kg of asphalt.
Providing and laying seal coat of premixed fine aggregate (passing 2.36 mm and retained on 180 micron sieve) with bitumen using 128 kg of bitumen of grade 80/100 bitumen 'per cum of fine aggregate and 0.60 cum of fine aggregate per 100 sqm of road surface including rolling and finishing with road all complete.
M/S ZAKIR HUSSAIN
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .