| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAdmitted-Fee/PreQual/Technical/Finance | ₹3.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹3.5 L+₹30,818.56 (9.56%)Admitted-Fee/PreQual/Technical/Finance | ₹3.5 L+₹30,818.56 (9.56%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹4.0 L+₹81,535.38 (25.3%)Admitted-Fee/PreQual/Technical/Finance | ₹4.0 L+₹81,535.38 (25.3%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹4.1 L+₹89,480.82 (27.8%)Admitted-Fee/PreQual/Technical/Finance | ₹4.1 L+₹89,480.82 (27.8%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹4.2 L+₹1.0 L (31.0%)Admitted-Fee/PreQual/Technical/Finance | ₹4.2 L+₹1.0 L (31.0%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | Arulkumar L3 | ABITHA CONSTRUCTIONS L1 | Elango L5 | Kannan No Rank | N K MUGILEESHWAR L4 | R ARUNMOZHIDEVAN L6 | P Sampath L2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.01Reconstruction to Weir at Periya Eri in Vadughapoondi Panchayat k | ||||||||||
| 1.02 | Dismantling old brick work with cm 1:5 | 14.67 | Cum | 260 ₹3,814.2 | 192.54 ₹2,824.56 Lowest | 252.28 ₹3,700.91 | 200 - | 245.97 ₹3,608.39 | 255 ₹3,740.85 | 210.94 ₹3,094.48 |
| 1.03 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 6.13 | Cum | 5,080 ₹31,140.4 | 4,043.57 ₹24,787.08 Lowest | 5,298.26 ₹32,478.34 | 4,697 - | 5,165.8 ₹31,666.38 | 5,352 ₹32,807.76 | 4,430.08 ₹27,156.41 |
| 1.04 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 41.1 | Cum | 6,120 ₹2,51,532 | 4,929.59 ₹2,02,606.15 Lowest | 6,459.21 ₹2,65,473.39 | 5,740 - | 6,297.73 ₹2,58,836.55 | 6,524 ₹2,68,136.4 | 5,400.8 ₹2,21,972.7 |
| 1.05 | For Centering without strutting(up to basement) | 97.12 | Cum | 487 ₹47,297.44 | 372.3 ₹36,157.78 Lowest | 487.82 ₹47,377.32 | 432 - | 475.63 ₹46,192.89 | 493 ₹47,880.16 | 407.89 ₹39,614.03 |
| 1.06 | Drilling holes in hard granite 40mm diameter | 15 | Cum | 254 ₹3,810 | 202.33 ₹3,034.95 Lowest | 265.12 ₹3,976.76 | 235 - | 258.49 ₹3,877.34 | 268 ₹4,020 | 221.67 ₹3,325.12 |
| 1.07 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 0.07 | Cum | 78,188.25 ₹5,316.8 | 62,513.83 ₹4,250.94 Lowest | 81,911.5 ₹5,569.98 | 72,617 - | 79,863.71 ₹5,430.73 | 82,739 ₹5,626.25 | 68,489.41 ₹4,657.28 |
| 1.08 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 61,037 ₹61,037 | 48,751 ₹48,751 Lowest | 63,878 ₹63,878 | - | 62,281 ₹62,281 | 64,525 ₹64,525 | 53,411 ₹53,411 |
Tender Value
Refer Docs
EMD Value
₹4,790
Closing Date
21 Sept 2026, 3:00 pmClosed
BDO BP
Melmalayanur
Reconstruction of Weir at Periya Eri in Vadughapoondi Panchayat
2026_RDTN_704850_2
MITank 2026
Open Tender
Civil Works
Works
90 days
Melmalayanur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹4,790
Yes
21 Sept 2026
16 Sept 2026
21 Sept 2026
16 Sept 2026
21 Sept 2026
16 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Reconstruction to Weir at Periya Eri in Vadughapoondi Panchayat k | - | - | - | - |
| 1.02 | Dismantling old brick work with cm 1:5 | 14.67 | Cum | 283.14 | ₹4,153.66 |
| 1.03 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 6.13 | Cum | 5,946.42 | ₹36,451.55 |
| 1.04 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 41.1 | Cum | 7,249.39 | ₹2,97,949.93 |
| 1.05 | For Centering without strutting(up to basement) | 97.12 | Cum | 547.5 | ₹53,173.2 |
| 1.06 | Drilling holes in hard granite 40mm diameter | 15 | Cum | 297.55 | ₹4,463.25 |
| 1.07 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 0.07 | Cum | 91,932.1 | ₹6,251.38 |
| 1.08 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | - | - |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
vadugapoondi.pdf
Tender Documents • 0.31 MB
BOQ_847275.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .