Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹29.0 LAdmitted-Fee/PreQual/Technical/Finance VILL BANDU PO LAWALONG DISTT CHATRA | CHATRA | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹29.9 L+₹84,411.99 (2.91%)Admitted-Fee/PreQual/Technical/Finance AT LINE MUHALLA CHATRA | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹30.6 L+₹1.6 L (5.36%)Admitted-Fee/PreQual/Technical/Finance DMFT MADHARGAT TATICHHARIYA PRAHAND ANTARGAT KASTURBA GANDHI BALIKA AWASIYA VIDYALAYA TATICHHARIYA | PASHCHIM CHAMPARAN | BIHAR | 845101 | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹33.0 L+₹3.9 L (13.5%)Admitted-Fee/PreQual/Technical/Finance 001 00 BANK COLONY SHIVPURI SHIVPURI MADHYA PRADESH 473551 | SHIVPURI | MADHYA PRADESH | 473551 | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹33.2 L+₹4.2 L (14.5%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹33.2 L
EMD Value
₹66,500
Closing Date
30 Oct 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
E.E. CHATRA
RDSD CHATRA
CONSTRUCTION OF ONE SPAN R.C.C BRIDGE (1X7. 4X6.0) ON SIDHABARI NALA IN VILLAGE-SIDHABARI, G.P.-SIKIDAG, BLOCK-KUNDA, DIST-CHATRA.
2026_RDSPL_120128_1
RDD/SD/CHATRA/36/2026-27/GR_2
Open Tender
Civil Works
Percentage
120 days
CHATRA
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹66,500
2 Nov 2026
23 Oct 2026
2 Nov 2026
23 Oct 2026
30 Oct 2026
23 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Bridge Part- Earthwork in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material) Mechanical means. Depth upto 3m (not requiring blasting) in ordinary soil | 220.29 | m³ | 57.4 | ₹12,644.53 |
| 2 | Ordinary Rock | 55.07 | m³ | 318.8 | ₹17,556.95 |
| 3 | P.C.C.M15 (1:2:4) in foundation (Plain Cement Concrete 1:2:4 nominal mix in sub structure complete as per drawings and technical specifications | 24.88 | m³ | 3,541.9 | ₹88,115.39 |
| 4 | Providing and laying of dry rubble flooring complete as per drawings and technical specifications Clause 1303.3 | 47.54 | m³ | - | - |
| 5 | P.C.C. M15 (1:2:4) grade levelling course below approach slab complete as per design and specification below Approach Slab | 5.4 | m³ | 3,610.04 | ₹19,494.22 |
| 6 | Plain/Reinforced Cement Concrete in open foundation complete as per drawing and technical specification. (R.C.C. Grade M 25 using batching plant,transit mixer & manual placing) | 67.2 | m³ | 4,604.6 | ₹3,09,429.12 |
| 7 | Plain/Reinforced Cement Concrete in Sub structure complete as per drawing and technical specification. (R.C.C. Grade M 25 using batching plant,transit mixer & concrete pump) Height upto 5 M | 42.69 | m³ | 4,630.9 | ₹1,97,693.12 |
| 8 | Construction of railing of M 30 grade in – situ with 20 mm nominal size aggregate, true to line and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawing and technical specification. | 26.8 | m | 1,987.6 | ₹53,267.68 |
| 9 | Furnishing and placing Reinforcement/Pre stressed cement concrete in Super-Structure as per drawing and technical specification, RCC Grade M 30 Solid Slab (Height upto 5 M) | 29.74 | m³ | 5,073.1 | ₹1,50,868.92 |
| 10 | Providing and laying Cement Concrete Wearing Coat M-30 grade including reinforcement complete as per drawing and technical specification. | 5.53 | m³ | 10,876.5 | ₹60,125.29 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.08 MB
SBD02.pdf
Tender Documents • 0.61 MB
BOQ_162540.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .