Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I BM Unit II Boiler Pressure parts AOH 2026 Maintenance of boiler drum and all safety valves and allied works
2026_EB_709717_1
CE / MTPS-I / SE / M-I / BM /OT. 100 / 2026-27
Open Tender
Power/Energy Projects/Products
Works
20 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹5,200
Yes
30 Sept 2026
30 Sept 2026
15 Oct 2026
30 Sept 2026
14 Oct 2026
30 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | DRUM OVERHAULING Charges for opening the drum manhole doors, cleaning & inspection of drum internals, flushing of phosphate dosing line by cutting and welding, cleaning and inspection of screen dryers, and providing new gasket for manhole doors | 1 | No | - | - |
| 2 | Checking of weld cracks in separation chamber and welding the cracks with IBR welder | 1 | No | - | - |
| 3 | Dismantling the turbo separator (100 Nos) for cleaning and refixing in position | 100 | Nos. | - | - |
| 4 | Charges for rectification of Boiler drum separators by reconditioning erosion/ crack, alignment of fins and replacing worn out mounting fasteners | 50 | Nos. | - | - |
| 5 | Charges for overhauling of boiler drum and super heater safety valves. | 5 | Nos. | - | - |
| 6 | Charger for overhauling of PRDS, CRH and HRH safety valves. | 7 | Nos. | - | - |
| 7 | Charger for overhauling of soot blower safety valve. | 1 | No | - | - |
| 8 | Charges for cutting of worn out drain lines of Safety valves of Boiler Drum, MSL lines etc., checking, removal chocking if any, renewal of eroded portion, welding, normalizing the lines | 5 | Nos. | - | - |
| 9 | Charges for providing assistance during safety valves floating. | 12 | Nos. | - | - |
| 10 | Charges for insitu seat cutting of SH, Drum, RH & PRDS safety valves | 5 | Nos. | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_852786.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .