| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | SINGLE₹6.5 LAccepted-AOC MORWA SHUKLA MODE WARD NO 2 P O SINGRAULI DISTT SINGRAULI M P PIN 486889 | SINGRAULI | SINGRAULI | MADHYA PRADESH | 486889 | SINGLE | Accepted-AOC AWARD OF WORK TO SINGLE BIDDER |
Tender Value
₹6.5 L
EMD Value
₹8,200
Closing Date
21 Aug 2023, 11:00 amClosed
GENERAL MANAGER EXCAVATION
NCL KHADIA PROJECT, SHAKTINAGAR, SONBHADRA, U.P.
Dismantling of Hoist Machinery of BE Shovel of Jayant Project and assembling it in BE-195 Vikash Shovel after dismantling of its existing Hoist Machinery at Khadia Project on Turn Key Basis.
2023_NCL_285289_1
KHD/G.M. (Excv)/E-Tender/23-24/457
Open Tender
Excavation Department Work
Item Rate
31 days
NCL KHADIA PROJECT, SHAKTINAGAR
Please refer Tender documents.
5 documents required · 5 mandatory
₹8,200
30 Sept 2023
5 Aug 2023
22 Aug 2023
5 Aug 2023
21 Aug 2023
7 Aug 2023
5 Aug 2023 - 10 Aug 2023
Amount
Scope of Work/Technical Specification: 1) Cleaning of the working area of both the shovels i.e. surveyed –off shovel of Jayant Project & BE-195B Vikash shovel of Khadia Project. 2) Dismantling of Hoist machinery from the surveyed off shovel of Jayant Project. 3) Dismantling of Hoist machinery of BE-195 Vikash shovel of Khadia Project. 4) Fitment of dismantled hoist machinery of Surveyed off Shovel of Jayant Project in BE-195B Vikash shovel of Khadia Project. 5) Alignment of Hoist machinery in BE-195B Vikash shovel and final testing. 6) The Said job will be done on TURN KEY BASIS.
Dismanting of Holst machinery of Surveted off BE Shovel at Jayant Project
Labour charges for cleaning of worklng area. Note : It includes a group of 4 No. un-skilled manpower in 2 shift per day for 2 days.
Labour charges for Dismantling of Holst machinery from Surveted off BE Shovel at Jayant Project. Note : It includes a group of 3 No.Fitter, 1 No. Welder & 5 Nos. semiskilled manpower along with 1 No. Supervisor in 2 shift per day for 8 days.
Dismantling of Hoist machinery of Vikash Shovel of Khadia Project:
Labour charges for cleaning of worklng area Note : It includes a group of 4 No. un-skilled manpower in 2 shift per day for 2 days.
Labour charges for Dismantling of Holst machinery of Vikash Shovel of Khadia project. Note : It includes a group of 3 No.Fitter, 1 No. Welder & 5 Nos. semiskilled manpower along with 1 No. Supervisor in 2 shift per day for 8 days.
Hoist Machinery fitting, alignment and final testing in Vikash Shovel
Labour charges for Hoist Machinery fitting, alignment and final testing in Vikash Shovel. Note : It includes a group of 3 No.Fitter, 1 No. Welder & 5 Nos. semiskilled manpower along with 1 No. Supervisor in 2 shift per day for 11 days.
Hiring Charges for above job
Welding machine - 01 No.
Grinding machine - 02 No. per day
Gas cutting sets with accessories - 1 No.
Hydraulic Jack (200T Capacity) - 02 No. per day
Charges for Transportation - 1 No. vehicle
Charges for Special Tools for alignment of hoist machinery
Charges for Misc. tools & tackles like spanners, hammers, crow bars, heavy duty sockets, extensions, torque wrench etc
Total impact of GST for the purpose of CTC
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_295380.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .