Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.8 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹10.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹10.8 LAdmitted-Fee/PreQual/Technical/Finance W NO 03 FOREST COLONY BARIPADA PO PS BARIPADA DIST MAYURBHANJ | +0.00% | ₹10.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L1₹10.8 LAdmitted-Fee/PreQual/Technical/Finance AT GARADHI PO KALAKAD PS BERHAMPUR DIST BALASORE | KENDUJHAR | ODISHA | 756121 | +0.00% | ₹10.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L1₹10.8 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹10.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L1₹10.8 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹10.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹10.8 L
EMD Value
₹10,797
Closing Date
28 Jul 2026, 5:00 pmClosed
PA, ITDA, Nilagiri
O/O- PA, ITDA, Nilagiri, Baleshwar
Const. of Toilet-cum-Bathroom of campus (Boys) at Saldahar EMRS, Nilagiri Block
2026_STSCD_135722_6
ITDANGR-02/2026-27
National Competitive Bid
Civil Works - Buildings
Percentage
60 days
ITDA, Nilagiri
D and C
2 documents required · 2 mandatory
₹6,000
₹10,797
Yes
31 Aug 2026
14 Jul 2026
29 Jul 2026
14 Jul 2026
28 Jul 2026
14 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Providing 250mm dia 6.0m long double U/R Pile foundation with C.C. M-20 excluding cost of rod including binding, bending, placing rod as directed. | |||||
| 2 | Earth work in excavation of foundation in hard soil within 50m initial lead & 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth & levelling the bed as per direction. | - | cum | 1 | - |
| 3Supplying, filling in foundation and plinth with sand, watered and rammed including cost, conveyance & royalty and all taxes. | |||||
| 4Cement concrete in (1:3:6) proportion by using 4cm size H.G. metal including cost, conveyance & royalty etc. complete. | |||||
| 5Fly Ash Brick work in cement mortar (1:6) in F & P of size 10"x5"x3" having crushing strength not less than 75 kg/cm² with dimensional tolerance 8% including splays cutting, circular moulding, chamfering and corbelling. | |||||
| 6RCC M-20 work with 20mm down grade H.G. C.B. chips including cost, conveyance & royalty etc. complete: | |||||
| 6.1 | Pile Cap | - | cum | 1 | - |
| 6.2 | G.Beam | - | cum | - | - |
| 6.3 | Col. Beam | - | cum | - | - |
| 6.4 | Lintel | 1 | cum | - | - |
stage.html
html • 0.06 MB
finance_601382.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.67 MB
6.pdf
Tender Documents • 0.44 MB
BOQ_601382.xls
BOQ • 0.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .