| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 CrAdmitted-Finance 7 145 MALLIKUNDAM PO MECHARI VIA MALLIKUNDAM VIA METTUR TK SALEM DT | ₹3.7 Cr | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M s Kumaresan and co L1 |
|---|---|---|---|---|
| 1.00 | Clearing of light Jungle with Uprooting with initial lead of 100 m including labour charges, etc, complete. | 23,500 | M2 | 2 ₹47,000 Lowest |
| 2.00 | Check surveying and pit marking for tower including hire charges for T & P all labour charges, lead, lift, etc., complete. | 16 | Loc | 1,500 ₹24,000 Lowest |
| 3.00 | Earth work excavation for tower foundation depositing on bank of foundation, filling in the low lying / other area of yard and consolidation of 10 meters with initial all lead, lift , in all classes of soil etc., complete.(In Hard gravelly soil) | 878 | cum | 125 ₹1,09,750 Lowest |
| 4.00 | Earth work excavation for tower foundation depositing on bank of foundation, filling in the low lying / other area of yard and consolidation of 10 meters with initial all lead, lift , in all classes of soil etc., complete.(Soft disintegrated rock not requiring blasting) | 293 | cum | 150 ₹43,950 Lowest |
| 5.00 | Earth work excavation for tower foundation depositing on bank of foundation, filling in the low lying / other area of yard and consolidation of 10 meters with initial all lead, lift , in all classes of soil etc., complete (MR and DMR requiring blasting) | 146 | cum | 250 ₹36,500 Lowest |
| 6.00 | Earth work excavation for tower foundation depositing on bank of foundation, filling in the low lying / other area of yard and consolidation of 10 meters with initial all lead, lift , in all classes of soil etc., complete.(Hard rock requiring and blasting) | 73 | cum | 400 ₹29,200 Lowest |
| 7.00 | Earth work excavation for tower foundation depositing on bank of foundation, filling in the low lying / other area of yard and consolidation of 10 meters with initial all lead, lift , in all classes of soil etc., complete ( Hard rock wedging and chiselling ) | 73 | cum | 600 ₹43,800 Lowest |
| 8.00 | Dewatering charges during excavation and concreting with 5HP diesel engine including all charges for fuel, engine oil, pump operator etc., complete | 46 | hrs. | 10 ₹460 Lowest |
| 9.00 | Providing shoring and shuttering during excavation and concreting works using country wood planks and scantlings including cost of all materials and all albour charges, lead and lift etc., complete as directed by the Engineer incharge at site. | 1,181 | Sqm. | 10 ₹11,810 Lowest |
| 10.00 | Fixing of templates, stub and cleat with supply of templates to site and assembling at site and shifting the template from loc to loc including cost of all materials,fabrication charges, labour, lead, lift etc., complete. For GCR type tower | 6 | Loc | 20,000 ₹1,20,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹2.0 L
Closing Date
7 Jul 2022, 2:30 pmClosed
CE/TP-I/CHN
O/o the Chief Engineer/Transmission Projects I / Chennai, 3rd Floor , 230 KV GIS Substation building A-10, Guindy Industrial Estate, Guindy, Chennai -32.
EWE, stub setting, concreting, Supply, Transport and Erection of 110 KV DC line on DC towers, Supply transport ,stringing of 6 Nos. of panther conductor, 1 No. Ew for making LILO of existing 110KV Unjanai- Elanagar- Rasipuramfeeder at the Elur
2022_EB_237294_1
TP1-042/2022-23
Open Tender
Civil Works
Works
120 days
ELUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2.0 L
Yes
12 Aug 2022
24 Jun 2022
8 Jul 2022
24 Jun 2022
7 Jul 2022
24 Jun 2022
Amount
Clearing of light Jungle with Uprooting with initial lead of 100 m including labour charges, etc, complete.
Check surveying and pit marking for tower including hire charges for T & P all labour charges, lead, lift, etc., complete.
Earth work excavation for tower foundation depositing on bank of foundation, filling in the low lying / other area of yard and consolidation of 10 meters with initial all lead, lift , in all classes of soil etc., complete.(In Hard gravelly soil)
Earth work excavation for tower foundation depositing on bank of foundation, filling in the low lying / other area of yard and consolidation of 10 meters with initial all lead, lift , in all classes of soil etc., complete.(Soft disintegrated rock not requiring blasting)
Earth work excavation for tower foundation depositing on bank of foundation, filling in the low lying / other area of yard and consolidation of 10 meters with initial all lead, lift , in all classes of soil etc., complete (MR and DMR requiring blasting)
Earth work excavation for tower foundation depositing on bank of foundation, filling in the low lying / other area of yard and consolidation of 10 meters with initial all lead, lift , in all classes of soil etc., complete.(Hard rock requiring and blasting)
Earth work excavation for tower foundation depositing on bank of foundation, filling in the low lying / other area of yard and consolidation of 10 meters with initial all lead, lift , in all classes of soil etc., complete ( Hard rock wedging and chiselling )
Dewatering charges during excavation and concreting with 5HP diesel engine including all charges for fuel, engine oil, pump operator etc., complete
Providing shoring and shuttering during excavation and concreting works using country wood planks and scantlings including cost of all materials and all albour charges, lead and lift etc., complete as directed by the Engineer incharge at site.
Fixing of templates, stub and cleat with supply of templates to site and assembling at site and shifting the template from loc to loc including cost of all materials,fabrication charges, labour, lead, lift etc., complete. For GCR type tower
Fixing of templates, stub and cleat with supply of templates to site and assembling at site and shifting the template from loc to loc including cost of all materials,fabrication charges, labour, lead, lift etc., complete. For HCR type tower
Fixing of templates, stub and cleat with supply of templates to site and assembling at site and shifting the template from loc to loc including cost of all materials,fabrication charges, labour, lead, lift etc., complete. For KCR type tower
PCC 1:3:6, using 20mm HBG metal for tower foundation without formwork but including cost of cement, all materials labour, lead, lift, consalidation using vibrators etc., complete.
PCC 1:2:4, using 12-20mm HBG metal for tower foundation, chimney and revetment with form work including cost of cement all materials, labour, lead, lift, etc., complete.
RCC 1:1.5:3 using 12 to 20mm HB Stone for tower foundation raft, revetment raft with form work but including cost of cement, all materials labour, lead, lift, consalidation using vibrators etc., complete. (Excluding RTS steel)
Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift,labour, cost of binding wire, etc., complete.As directed by the Engineer at site.
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete. For GCR (Wet)
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete. For HCR (Dry)
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete. For HCR (Wet)
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete. For KCR (Dry)
Refilling with the excavated earth other than sand including watering consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete. For KCR (Wet)
Supply and labour charges for providing pipe type earthing of tower with G.I earth pipe 40mm dia and earth strips lead, lift, etc, complete.
Providing earthing arrangements for Teriminal tower including necessary excavation for fixing 3m long 100mm dia CI class pipe, 60cm dia with 5cm shell thick of RCC collar and refilling with excavated earth mixed with soft charcoal and connect with the leg of the stub with 50x10mm MS flat and providing GI barbed wire as per the instruction of site engineer including all cost of materials lead lift etc complete.
Removal of excess excavated earth from the tower location including cost of all materials, lead, lift, labour and Transporting charges etc., complete.
Labour charges for Erection of various tower including sorting out of tower parts at Site,unloading at site, erection of towers, tightening and punching of bolts &nuts if neccessary for final checking, including all lead, lift, labour etc. Complete including charges & rectification of tower parts if any including Tools & Plants all labour lead, lift, adhering to all safety norms, etc complete.
PCC 1:2:4 using 20mm metal for muffing coping concrete with form work including cost of all materials, labour, lead, lift, etc complete .
Plastering with CM 1:3, 12 mm thick including cost of cement, all materials, labour etc., complete.
Cutting and felling of Big size various type of trees and handing over of felled trees to the land owner at felling place including cost of T&P 's, Lead & lift, etc., complete
Cutting and felling of Small size various type of trees and handing over of felled trees to the land owner at felling place including cost of T&P 's, Lead & lift, etc., complete
Providing full welding of all bolts and nuts in the erected towers from ground level to the cross arm bottom level in the tower including painting of bolts and nuts with two coats of best quality of cold galvanised paint having atleast 90% zinc content and approved by the Engineer at site including cost of paint and all other materials, hire charges for diesel generator and welding transformer, all labour, transport charges etc complete.
Labour charges for transporting and hoisting of 7 units of 90 KN insulators for Panther and fixing of SS fittings for Panther with all allied hardwares including all cost of labour,lead, lift, T & P etc complete. Without PA rod for Panther (insulators will be supplied by board)
Labour charges for transporting and hoisting of 8 units of 120 KN insulators for Panther and fixing of SS fittings for Panther with all allied hardwares including all cost of labour,lead, lift, T & P etc complete. Without PA rod for Panther
Labour charges for transport of 6 Nos of Panther conductor from department store, paying out, jointing, rough sagging, tensioning, clipping, providing vibration dambers at tension locations including jumber connections, providing trussals at various intervals for avoiding damages of conductor including transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete. For Kms
Labour charges for transport of 6 Nos of Panther conductor from department store, paying out, jointing, rough sagging, tensioning, clipping, providing vibration dambers at tension locations including jumber connections, providing trussals at various intervals for avoiding damages of conductor including transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete. For Span
Labour charges for transport of 7/3.55mm GI earthwire from Department store and fixing of GI earthwire hardwares (ie ST fittings,SS fittings, D shackle, U bolt etc) wherever required, paving out, jointing, rough sagging, tensioning, including jumber connection transport charges, loading, unloading ,lead, lift, cost of T&P, etc complete. For Kms
Labour charges for transport of 7/3.55mm GI earthwire from Department store and fixing of GI earthwire hardwares (ie ST fittings,SS fittings, D shackle, U bolt etc) wherever required, paving out, jointing, rough sagging, tensioning, including jumber connection transport charges, loading, unloading ,lead, lift, cost of T&P, etc complete. For Span
Supply, fabrication and fixing of name board with 18 gauge plate including cost of materials, labour for writing name of the line etc complete
Painting with two coats of anticorrosive paint over tower leg at a height of 45cm including all cost of materials, labour, lead lift etc complete
Providing temporary guys wherever necessary including excavation, buryingout of anchor for staywire, tightening, dismantling the same after completion of works including cost of all materials, lead, lift, labour etc complete.
Arranging and availing line clear in HT/LT lines during stringing and dismantling works including cost of labour for lowering and retensioning and jumber connections of HT/ LT, lines earthing lead, lift, T&P etc., complete.
Providing special trussels for Road crossing including cost of all materials, labour, lead lift etc. Complete.
Providing Loop jumpers and removal of the same after commissioning of the 110 line including cost of all materials, labour lead llift T&P etc complete
Releasing, lowering of existing 7 Nos. suspension insulator with fittings and Rehoisting after completion of new line stringing including all labour,transport lead, lifts, T&P, etc complete.
Releasing, lowering of existing 8 Nos. tension insulator with fittings and Rehoisting after completion of new line stringing including all labour,transport lead, lifts, T&P, etc complete.
Releasing lowering and restringing of exsiting 3 Nos of Panther conductor and vibration dambers at tension locations including jumber connections, including transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete. Under LC Condition,
Labour charges for releasing, Lowering and restringing of existing 1 No of7/3.55mm GI earthwire including lead, lift, labour and cost of T&P etc complete. Under LC Condition
Supply,Transport and fixing of Single tension fittings for panther
Supply, Transport and fixing of SB Vibration Damper for panther
Supply,Transport and fixing of Single Suspension fittings for panther
Supply, Transport and fixing of PA rod for panther conductor
Supply, Transport and fixing of Aluminium earth bond for earthwire
Supply, Transport and fixing of single tension fittings for earth wire 7/3.55
Supply, Transport and fixing of MID span joint for panther
Supply, Transport and fixing of MID span joint for Earthwire
Supply, Transport and fixing of Repair sleeve for panther
Supply, Transport and fixing of number plate as directed by the Engineer in charge of the work including all labour etc., complete
Supply, Transport and fixing of Phase plates as directed by the Engineer in charge of the work including all labour etc., complete
Supply, Transport and fixing of Danger boards as directed by the Engineer in charge of the work including all labour etc., complete
Supply, Transport and fixing of PG clamp
Supply, Transport and fixing of 16mm dia U bolt and nuts/Hanger/eye bolts for panther
Supply, Transport and fixing of D Shackle for panther
Labour charges for dismantling of GI tower angles including cost of materials,T & P,labour, lead, lift etc complete. as per approved drawing and specification. Under LC Condition
Supplying, Transportation, fabrication, galvanising of standard MS towers parts as per department approved drawing including of tower parts to site, all taxes and duties, freight charges etc., the raw material standard should be as per IS 2633 and 6745 and as per specification as per IS code directed by department engineer.
Supplying, Transportation, fabrication, galvanising of standard Bolts and nuts as per department approved drawing including of tower parts to site, all taxes and duties, freight charges etc., the raw material standard should be as per IS 2633 and 6745 and as per specification as per IS code directed by department engineer
Supply of ACSR Panther conductor as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, by the engineer incharge at site.
Supply of 7/3.55mm GI earthwire as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, by the engineer incharge at site.
Supply of 90 KN Insulator as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, by the engineer incharge at site.
Supply of 120 KN Insulator as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, by the engineer incharge at site.
Dismantling the towers etc, in AS IS WHERE IS condition consisting of various type of Towers and clearing from the site on cost to paid to TANTRANSCO,including the cost of loading,unloading with necessary tools and plants with safety norms (The quoted rate should not be less than Rs.25000)
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .