Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹41.2 LAdmitted-Finance | -0.60% | ₹41.2 L | L1 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹4.1 L
Closing Date
3 Aug 2026, 12:00 pmClosed
S. E. UNNAO CIRCLE, PWD UNNAO
OFFICE OF S. E. UNNAO CIRCLE, PWD UNNAO
Construction and Dismentling work of Pantoon Pul and approach road on Ramganga River at Ciyasar Ghat in District Hardoi in F.Y. 2025-26
2026_CEUCZ_1172377_1
3174M/1MT/ E-TENDER/U.C. DATE 21.07-2026
Open Tender
Civil Works
Percentage
180 days
HARDOI
Construction and Dismentling work of Pantoon Pul and approach road on Ramganga River at Ciyasar Ghat in District Hardoi in F.Y. 2025-26
2 documents required · 2 mandatory
₹2,714
₹4.1 L
Yes
OFFICE OF S. E. UNNAO CIRCLE, PWD UNNAO
12 Sept 2026
27 Jul 2026
3 Aug 2026
27 Jul 2026
3 Aug 2026
27 Jul 2026
29 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Local shifting of pantoon within 500m. With the help of crain including all Complete ( Including labour Cess Excluding G.S.T) | 60 | Nos | 1,089 | ₹65,340 |
| 2 | Dragging the pantoon from dry bed to the river water and making pair and anchoring them in the down stream sid of pantoon pridge. ( Including labour Cess Excluding G.S.T) | 30 | Pair | 2,514 | ₹75,420 |
| 3 | Carrying of pantoon pair from the place of anchoring (down stream side of bridge) to the alignment of bridge in water and fixing the same with other pantoon pair and reflexing the same in bridge alignment. ( Including labour Cess Excluding G.S.T) | 30 | Paire | 891 | ₹26,730 |
| 4 | Additional Haulage of pantoom in River (per km.) ( Including labour Cess Excluding G.S.T) | 30 | Pair | 816 | ₹24,480 |
| 5 | Sinking of pantoons to obtain the proper gradient as laid in dry bed/shallow water in the alignment of pantoom bridge as per direction of Engieer incharge. ( Including labour Cess Excluding G.S.T) | 60 | Each | 1,004 | ₹60,240 |
| 6 | Supply of wooden anchors (2.40x1.80x3.10)bwith 10&15 cm Equalipitis Balli( Including labour Cess Excluding G.S.T) | 60 | Each | 1,633 | ₹97,980 |
| 7 | Laying of wooden anchors in the river on the up steam/ down stream side of the pantoon bridge site includig their weaving packing the snad filed bags (av-90bags) properly before laying and fixing to pantoonwith coir roe/sisall rope excluding cost. ( Including labour Cess Excluding G.S.T) | 60 | Nos | 678 | ₹40,680 |
| 8 | Supply of M.S. plate including loading umloading cost of all Mateial carriageup to site as per direction of Enginer incharge. ( Including labour Cess Excluding G.S.T) | 23.4 | Qtl | 5,593 | ₹1,30,876.2 |
| 9 | Cartage and lying of chaquered plate including loading umloading cost of carriage from prade ground store and lying at site as per direction of Enginer incharge. ( Including labour Cess Excluding G.S.T) | 1,200 | Nos | 56 | ₹67,200 |
| 10 | Laying of wooden anchors in the river on the up steam/ down stream side of the pantoon bridge site includig their weaving packing the snad filed bags (av-90bags) properly before laying and fixing to pantoonwith coir roe/sisall rope excluding cost.( Including labour Cess Excluding G.S.T) | 120 | Nos | 32 | ₹3,840 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.12 MB
T23174.pdf
Tender Documents • 1.02 MB
BOQ_2201761.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .