Tender Value
₹36.0 L
EMD Value
₹72,056
Closing Date
22 Jul 2024, 2:00 pmClosed
Superintending Engineer
Superintending Engineer Temp. Maha Kumbh Mela 2024-25 Electricity Circle Allahpur Prayagraj
Refer to Tender Description
2024_PVVNV_938257_1
47/TMKM/EC/2024-25
Open Tender
Electrical Works
Lump-sum
180 days
Prayagraj
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
Account Number- 50200079575664
₹72,056
14 Aug 2024
13 Jul 2024
27 Jul 2024
13 Jul 2024
22 Jul 2024
13 Jul 2024
Amount
Construction of 11 KV line & 100 KVA Sub-Station for giving supply to Jal Nigam Tube well ,VIP Camp and Pandals from Gangeshwar to End of Mela (Ganga East) including maintenance during Electrification work of Kumbh Mela 2024-25, which includes loading, carriage and unloading of materials from Mela store to work site and work site to Mela store, alongwith dismantling of line after Mela.(MS Nuts & Bolts with washer for all related works will be provided by contractor on rental basis.)
Construction of Temporary 11 KV overhead Line on STP 11 Mtr. Long (including painting of pole with post office red on top) after erection of pole by ACSR Dog conductor with proper guarding(min 6 Nos latching per span) and its earthing of every third pole.
Maintenance of 11 KV overhead Line by providing maintenance gang round the clock for complete Mela period or as per instruction of mela administration.(Contractor will provide minimum 6 persons for maintenance)
Dismantling of 11 KV overhead Line after completion of Mela period or as per instruction of mela administration and carriage back complete line material to Mela store.
Construction of section double pole for 11kv line on S.T.P. 11Mtr. long including cutting fabrication and fitting of channels/angles/G.O, painting and earthing etc.
Construction of section four pole for 11kv line on S.T.P. 11Mtr. long including cutting fabrication and fitting of channels/ angles, Plinthing, painting and earthing etc.
Laying of XLPE cable 3x120/3x185 Sq.mm. in mela area and Pantoon bridge in 4'' HDPE pipe including carriage of materials from Mela store to Mela work site and after dismantling return back all the materials from site to Mela store.(HDPE Pipe provided by contractor on rental basis)
Erection of 9/11 M Long STP single pole for hanging 3x120/185 sqmm 11 KV XLPE cable including fixing of necessary clamps, other accessories like 1 no. T-Off channel 125x65x1300 mm/top channel size 100x50x3200 mm etc.
Hanging of XLPE cable 3x120/3x185 Sq.mm along with stay wire 7/10 SWG on erected pole including carriage of materials from Mela store to Mela work site and return back all the materials to Mela store after dismantling and completion of Mela.
Fixing of H.S. type 11 KV 3x185 sq mm S/T cable joints & End Terminations.
Fixing of H.S. type 11 KV 3x185 sq mm O/D cable joints & End Terminations with proper connection to overhead line.
Construction of double pole and installation of 100 kva t/f on S.T.P. 11Mtr. long including cutting fabrication and fitting of channels/with bracing angles, substation base angle ,G.O, D.O.
Earthing of transformer body, neutral and L.T cubical and dismantling after mela.
Laying/hanging of L.T cable 3½x70/150 Sqmm or equivalent size cable from transformer to main switch of tube well in mela area.
Construction of 11/0.4 KV, 2x400 KVA Temporary Sub-Station & Laying of L.T. Cable including connection of RMU Wherever required in Concern area for Electrification work of Kumbh Mela 2024-25 and its maintenance during Mela period. This also include dismantling of the material after Mela including loading, carriage and unloading of material from Kumbh mela Store to site of work and return back to Mela Store after Mela.
Construction of four pole structure on S.T.P. 11Mtr. long including cutting fabrication and fitting of channels/ angles, painting and earthing etc and Installation of G.O. 4 Nos. D.O. 2 Nos. fittings, making of Busbar on the top portion of structure with cutting, fabrication and mounting of channel/Angle on four pole.
Construction of T/f plinth of size 1.5x1.5.x1.25 Mtr. with Ist class bricks of 0.95 meter height and 0.35 meter thick wall will be constructed. Rest wall should be 0.23 meter thickness. brick work will be in ratio of 1:4 Cement and sand. In the hollow portion the sand should be filled from ground level upto 15 cm. below from the top of plinth. The cement, sand and stone ballast should be placed in ratio 1:2:4 and 2 nos. channels be grouted in the concrete. The T/f plinth should be plastered on all sides by 12mm thick in 1:6 Cement, and mortar.
Installation of 400 KVA Transformer on plinth and making all HT/LT connections from transformer to L.T Tailless unit and earthing of transformer.
Installation of Tailless Unit by providing structure of channels with the help of 3/4 meter long M.S. Channel including mounting of 12 to 16 Nos. Tailless Unit 500/300 Amps. Also making of copper bus bar and its tapping, and earthing of structure by earth rod at two Point
Making of foundation plinth for D.G. Set of Size 14x4 ft. with the help of 1st Class Brick and its plastering with cement and Sand in ratio 1:6 which includes fixing of Change Over Switch on Sub Station Angle size 65x65x6 mm and its proper connection.
Bamboo barricading around four pole, Tailless unit and transformer plinth for safety purpose including its painting.(All materials will provided by contractor.)
Brick barricading, singhara with bricks and painting alternatively with Geru and Lime.(All materials will provided by contractor.)
Operation of above 11/0.4 KV, 2x400 KVA substation during Maha kumbh Mela 2024-25 round the clock from the date of energisation with the help of skilled operating staff (Operating Staff will be provided by the contractor). Two no. skilled manpower must be in each shift and minimum 3 shifts must be performed everyday)
Fixing of Fire bucket stand with four nos. buckets including its grouting and two no fire extinguisher at various sub-station in Kumbh Mela 24-25.
Laying of L.T. PVC cable 3.5x400 sq mm or equivalent size which also include maintenance and dismantling of cable after Mela.
Laying of L.T. PVC Cable 3 ½ x240 sq. mm. or equivalent size inside sand, which also includes maintenance and dismantling of cable after Mela.
Laying of L.T. PVC Cable 3 ½ x150 sq. mm. or equivalent size inside sand, which also includes maintenance and dismantling of cable after Mela.
Laying of L.T. PVC cable 3.5x 70 sq mm or equivalent size which also include maintenance and dismantling of cable after Mela including carriage from Mela Store to site of work and back carriage from site of work to Mela Store.
M/S Prakash Enterprises
RAKESH ELECTRIC WORKS,ECID
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .