| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹3.3 L+₹768 (0.23%)Rejected-AOC | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | SRI SIVASAKTHI ENGINEERS BUILDERS L1 | LAKSHMI NARAYANAN & CO L2 |
|---|---|---|---|---|---|
| 1.00 | Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications. | 48 | m3 | 2,578 ₹1,23,744 Lowest | 2,579 ₹1,23,792 |
| 2.00 | Providing and laying Prime coat over the WMM surface using 7.0 kgs of bitumen emulsion (Slow Setting 1) per 10 Sq.m area including cost of bitumen emulsion at the site, including labour charges for preparing the surface, and applying the required quantity of bitumen emulsion as Tack Coat using bitumen sprayer etc., complete as per Clause 503 of MoRT&H Specifications Rev.5 | 480 | m2 | 89 ₹42,720 Lowest | 90 ₹43,200 |
| 3.00 | Providing and laying Tack coat over the WMM surface treated with emulsion using 2.50 kgs of bitumen emulsion (Rapid Setting 1) per 10 Sq.m area including cost of bitumen emulsion at the site, including labour charges for preparing the surface, and applying the required quantity of bitumen emulsion as Tack Coat using bitumen sprayer etc., complete as per Clause 503 of MoRT&H Specifications Rev.5 | 480 | m2 | 19.5 ₹9,360 Lowest | 20 ₹9,600 |
| 4.00 | Providing and laying Bituminous Concrete 30mm thick using 19 – 9.50 mm metal, 9.5-2.36 mm Metal, 2.36 mm and below Metal of specified grading aggregates and Quarry Dust with 37.73 kg of VG30 (60/70grade) bitumen ( Procured from State/ Central Public sector undertakings only) for premixing per 10sq.m including cost and conveyance of all materials to work site and stacking them on road side to standard departmental metric gauge for pre-measurement, heating the bitumen in bitumen boiler heating the aggregates and mixing them with bitumen in mini hot mix plant, spreading the mix in the required temperature for uniform thick of 30mm over a previously prepared surface to specified grade and cross section and compaction by power roller, including labour charges, spreading etc., including Hire charges for machineries etc., complete as per clause 509 of MORTH Specifications to achieve the desired compaction. | 14.5 | m3 | 10,700 ₹1,55,150 Lowest | 10,700 ₹1,55,150 Lowest |
| 5.00Add :- GST @ 18% | |||||
Tender Value
₹4 L
EMD Value
₹4,000
Closing Date
8 Jan 2026, 3:00 pmClosed
The Assistant Commissioner,
North Zone, Coimbatore Corporation, Balasundaram Road,Oppsite Womens Polytechnic
Formation of BT Surface to Arumuga Nagar in Ward No - 15, North Zone
2026_MAWS_638844_22
E7/NorthZone/2025-26
Open Tender
Civil Works
Works
90 days
North Zone, Coimbatore Corporation
As per the tender condition attached
4 documents required · 4 mandatory
₹0
₹4,000
23 Sept 2026
5 Jan 2026
9 Jan 2026
5 Jan 2026
8 Jan 2026
5 Jan 2026
Providing and laying, spreading and compacting graded stone aggregate to Wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications.
Providing and laying Prime coat over the WMM surface using 7.0 kgs of bitumen emulsion (Slow Setting 1) per 10 Sq.m area including cost of bitumen emulsion at the site, including labour charges for preparing the surface, and applying the required quantity of bitumen emulsion as Tack Coat using bitumen sprayer etc., complete as per Clause 503 of MoRT&H Specifications Rev.5
Providing and laying Tack coat over the WMM surface treated with emulsion using 2.50 kgs of bitumen emulsion (Rapid Setting 1) per 10 Sq.m area including cost of bitumen emulsion at the site, including labour charges for preparing the surface, and applying the required quantity of bitumen emulsion as Tack Coat using bitumen sprayer etc., complete as per Clause 503 of MoRT&H Specifications Rev.5
Providing and laying Bituminous Concrete 30mm thick using 19 – 9.50 mm metal, 9.5-2.36 mm Metal, 2.36 mm and below Metal of specified grading aggregates and Quarry Dust with 37.73 kg of VG30 (60/70grade) bitumen ( Procured from State/ Central Public sector undertakings only) for premixing per 10sq.m including cost and conveyance of all materials to work site and stacking them on road side to standard departmental metric gauge for pre-measurement, heating the bitumen in bitumen boiler heating the aggregates and mixing them with bitumen in mini hot mix plant, spreading the mix in the required temperature for uniform thick of 30mm over a previously prepared surface to specified grade and cross section and compaction by power roller, including labour charges, spreading etc., including Hire charges for machineries etc., complete as per clause 509 of MORTH Specifications to achieve the desired compaction.
Add :- GST @ 18%
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
ITBE7.pdf
Additional Documents • 0.05 MB
NITE7-Road.pdf
Tender Documents • 0.40 MB
BOQ_765283.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .