| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.9 LAccepted-AOC | L1 | Accepted-AOC Accept | |
| 2 | L2₹13.0 L+₹1.2 L (9.86%)Rejected-AOC | L2 | Rejected-AOC Reject |
| Sl No | Description | Qty | Unit | GURU KADAKSHAM CONSTRUCTION L2 | DURAISWAMI AND CO L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling,Clearing away Pressed tiles and weathering course and carefully stacking materials useful for reuse etc., complete as per the direction of departmental officer. | 56 | m2 | 100 ₹5,600 | 50 ₹2,800 Lowest |
| 2.00 | Dismantling,Clearing away Brick or stone masonry in cement mortar, wall under 3m high upto 70cm tk and carefully stacking materials useful for reuse etc., complete as per the direction of departmental officer. | 3 | m3 | 311 ₹933 Lowest | 311 ₹933 Lowest |
| 3.00 | Earth work excavation for foundation in ordinary soil, light black cotton sandy loam and dry silt including shoring, strutting, baling or pumping out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick and depositing the surplus earth at places as directed by the departmental officers with initial lead and lift etc complete as per the direction of dept officer | 10 | m3 | 181 ₹1,810 Lowest | 181 ₹1,810 Lowest |
| 4.00 | Supplying and filling in basement with M.Sand not more than in layers of 15cm thick including watering and ramming to consolidation etc complete as per the direction of dept officer | 1 | m3 | 2,500 ₹2,500 | 1,685 ₹1,685 Lowest |
| 5.00 | Plain cement concrete 1:4:8 mix (One cement four M.Sand and eight aggregate) using 40mm size ISS gauge HBBG metal including mixing, laying, consolidating,curing, cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification | 6 | m3 | 5,590 ₹33,540 Lowest | 5,590 ₹33,540 Lowest |
| 6.00 | Supplying and erecting for shuttering, including necessary supports for plane surface in
foundation and basement for RCC column footings, Plinth beams, staircase steps, etc., using mild steel sheets of size 90cm x 60cm and 10gauge, stiffened with mild steel angle of size 25mm x 25mm x 3mm for boarding, supported by silver oak joists of size 10 x6.5cm, spaced at about 90cm centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete, complying with standard specifications and as directed etc., complete - 1 m2 | 28 | m2 | 2,500 ₹70,000 | 1,086 ₹30,408 Lowest |
| 7.00 | Supplying and erecting for Centering for Column & Sunshade etc., using mild steel sheets of size 90cm x 60cm and 10gauge, stiffened with mild steel angle of size 25mm x 25mm x 3mm for boarding, supported by silver oak joists of size 10 x6.5cm, spaced at about 90cm centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete, complying with standard specifications and as directed etc., complete - 1 m2 | 35 | m2 | 1,304 ₹45,640 Lowest | 1,304 ₹45,640 Lowest |
| 8.00 | Supplying and erecting for Centering for soffits of RC slab including strutting 3m high etc., using mild steel sheets of size 90cm x 60cm and 10gauge, stiffened with mild steel angle of size 25mm x 25mm x 3mm for boarding, supported by silver oak joists of size 10 x6.5cm, spaced at about 90cm centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete, complying with standard specifications and as directed etc., complete - 1 m2 | 10 | m2 | 978 ₹9,780 Lowest | 978 ₹9,780 Lowest |
| 9.00 | Supplying, fabrication and placing in position of steel reinforcement using mild steel of Ribbed tor
steel rods, for all RCC works as per the design given by the departmental officers including cost of
steel and binding wore and all labour charges for cutting, bending & tying etc., complying with
standard specifications | 6 | Qtl | 9,321 ₹55,926 Lowest | 9,321 ₹55,926 Lowest |
| 10.00 | Reinforced Cement concrete 1:1.5 :3 (one cement, one & half M.sand and three course
aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of
works excluding centering shuttering and cost of reinforcement but including curing
etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever
necessary as directed by departmental officer etc., complete. | 7 | m3 | 10,000 ₹70,000 | 9,373 ₹65,611 Lowest |
Tender Value
₹15 L
EMD Value
₹15,000
Closing Date
19 Sept 2025, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Construction of Additional Classroom with polyurethane foam Roof PUF for ICDS Center Over the Existing Building at Muthucolony in Ward No 86 South Zone Coimbatore corporation.
2025_MAWS_601903_1
e45/2025
Open Tender
Civil Works
Works
150 days
Coimbatore corporation
AS PER THE TENDER DOCUMENT
5 documents required · 5 mandatory
₹0
₹15,000
7 Nov 2025
9 Sept 2025
19 Sept 2025
9 Sept 2025
19 Sept 2025
9 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .