Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.2 LAccepted-AOC | L1 | Accepted-AOC ACCEPTED | |
| 2 | L2₹6.2 L+₹330.33 (0.05%)Rejected-Finance 01 BALIA BALIA SAGARDIGHI MURSHIDABAD WEST BENGAL 742237 | MURSHIDABAD | WEST BENGAL | 742237 | L2 | Rejected-Finance QUOTA 2ND LOWEST | |
| 3 | L3₹6.2 L+₹617.14 (0.10%)Rejected-Finance | L3 | Rejected-Finance QUOTA 3RD LOWEST |
| Sl No | Description | Qty | Unit | M/S SHYAMSUNDAR PAL L1 | M/S ANUPAM SAHOO L3 | DAS ENTERPRISE L2 |
|---|---|---|---|---|---|---|
| 1.00 | Fine Sand | 45.9 | cum | 380 ₹17,442 Lowest | 381 ₹17,487.9 | 381 ₹17,487.9 |
| 2.00 | Polythene sheet (150 gm per sqm) | 105.19 | kg | 109 ₹11,465.49 Lowest | 110 ₹11,570.68 | 110 ₹11,570.68 |
| 3.00 | Hire charges of Shuttering plank (25mm-30mm thick) with Prop including all fittings | 89.25 | sqm | 219 ₹19,545.75 Lowest | 220 ₹19,635 | 220 ₹19,635 |
| 4.00 | Nail | 10 | kg | 79 ₹790 Lowest | 80 ₹800 | 80 ₹800 |
| 5.00 | Stone Aggregate(single size): 10 mm nominal size | 29.99 | cum | 1,632 ₹48,940.42 Lowest | 1,633 ₹48,970.4 | 1,633 ₹48,970.4 |
| 6.00 | Stone Aggregate(single size):20 mm nominal size | 61.05 | cum | 1,799 ₹1,09,823.55 Lowest | 1,800 ₹1,09,884.6 | 1,799 ₹1,09,823.55 Lowest |
| 7.00 | Portland Cement | 43.7 | tonne | 5,716 ₹2,49,770.91 Lowest | 5,717 ₹2,49,814.61 | 5,716 ₹2,49,770.91 Lowest |
| 8.00 | Carriage of Stone aggregate below 40 mm nominal size | 91.03 | cum | 563 ₹51,252.71 Lowest | 564 ₹51,343.74 | 563 ₹51,252.71 Lowest |
| 9.00 | Loading unloading & stacking Sand/ stone aggregate (less than 40mm nominal size) | 91.03 | cum | 76 ₹6,918.66 Lowest | 77 ₹7,009.7 | 76 ₹6,918.66 Lowest |
| 10.00 | Coarse Sand | 45.52 | cum | 713 ₹32,453.98 Lowest | 713 ₹32,453.98 Lowest | 713 ₹32,453.98 Lowest |
Tender Value
₹6.2 L
EMD Value
₹12,300
Closing Date
3 Oct 2026, 5:30 pmClosed
BLOCK DEVELOPMENT OFFICE
OFFICE OF THE BLOCK DEVELOPMENT OFFICE, MOHANPUR
01 SUPPLYING OF MATERIALS FOR CONSTRUCTION OF CEMENT CONCRETE ROAD FROM NATH PARA PUKUR TO RAMESHWAR MAITY SHOP AT MOHANPUR GP UNDER MOHANPUR DEV. BLOCK FUND- VBGRAMG
2026_ZPHD_5023623_1
E-01(01)/VBG RAMG/BDO/MNP OF 2026-27
Open Tender
CIVIL WORKS
Percentage
30 days
MOHANPUR GP
Please refer Tender documents.
3 documents required · 3 mandatory
₹800
₹12,300
Yes
7 Oct 2026
10 Sept 2026
6 Oct 2026
10 Sept 2026
3 Oct 2026
10 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Fine Sand | 45.9 | cum | 381 | ₹17,487.9 |
| 2 | Polythene sheet (150 gm per sqm) | 105.19 | kg | 110 | ₹11,570.68 |
| 3 | Hire charges of Shuttering plank (25mm-30mm thick) with Prop including all fittings | 89.25 | sqm | 220 | ₹19,635 |
| 4 | Nail | 10 | kg | 80 | ₹800 |
| 5 | Stone Aggregate(single size): 10 mm nominal size | 29.99 | cum | 1,633 | ₹48,970.4 |
| 6 | Stone Aggregate(single size):20 mm nominal size | 61.05 | cum | 1,800 | ₹1,09,884.6 |
| 7 | Portland Cement | 43.7 | tonne | 5,717 | ₹2,49,814.61 |
| 8 | Carriage of Stone aggregate below 40 mm nominal size | 91.04 | cum | 564.5 | ₹51,389.26 |
| 9 | Loading unloading & stacking Sand/ stone aggregate (less than 40mm nominal size) | 91.04 | cum | 77 | ₹7,009.7 |
| 10 | Coarse Sand | 45.52 | cum | 714 | ₹32,499.5 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.05 MB
BIDDERS1.pdf
Tender Documents • 0.00 MB
SOQ.pdf
Tender Documents • 1.22 MB
BOQ_5107852.xls
BOQ • 0.33 MB
BIDDERS1.pdf
PDF • 0.00 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .