Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-Finance | ₹1.9 L | L1 | Accepted-Finance 1st Lowest Bidder |
| 2 | L2₹2.0 L+₹4,130 (2.13%)Rejected-Finance 58 KAILASHPURAM GOVINDPURAM GAZIABAD | GHAZIABAD | UTTAR PRADESH | ₹2.0 L+₹4,130 (2.13%) | L2 | Rejected-Finance 2nd Lowest Bidder |
| 3 | L3₹2.1 L+₹16,944.80 (8.73%)Rejected-Finance | ₹2.1 L+₹16,944.80 (8.73%) | L3 | Rejected-Finance 3rd Lowest Bidder |
| 4 | L4₹3.0 L+₹1.0 L (52.0%)Rejected-Finance | ₹3.0 L+₹1.0 L (52.0%) | L4 | Rejected-Finance 4th Lowest Bidder |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Firm has not fulfilled Technical experience criteria as per PQR of above Tender. |
Tender Value
₹2.1 L
EMD Value
₹2,100
Closing Date
22 Dec 2025, 5:00 pmClosed
Superintending Engineer
Electricity Transmission Circle, UPPTCL, Pareshan Bhawan , Mohaddipur , Gorakhpur
WORK OF SURVEY OF EXISTING 132 KV MOTIRAM-KAPTANGANJ TSS LINE FOR UPGRADATION OF LINE FROM 2 PHASE S.C. LINE ON D.C. TOWER TO 3 PHASE ON D.C. TOWER AND SURVEY OF PROPOSED ROUTE LENGTH UP TO 220 KV S/S HATA AND SURVEY ROUTE LENGTH OF PROPOSED SARDARNA
2025_UPTCL_1091420_1
Short Term E-Tender No. 58-ETC(G)/2025-26
Open Tender
Electrical Works
Item Rate
45 days
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
SE, ETC, Gorakhpur
₹2,100
2 Jan 2026
17 Nov 2025
23 Dec 2025
17 Nov 2025
22 Dec 2025
17 Nov 2025
Details survey including preparation of profile & schedule of materials , making of locations (Route length) GPS Survey of Line with co-ordinate each tower (The length of line shall be authenticated by GPS Survey) of existing 132 KV Motiram -Kaptanganj TSS on 220 KV S/s Hata, Kushinagar (Submission of drawing in triplicate of tower schedule , tower profile , making drawing in A1 format, GPS route map coloured showing B line and two alternate route map if required.
Details survey including preparation of profile & schedule of materials , making of locations (Route length) GPS Survey of Line with co-ordinate each tower (The length of line shall be authenticated by GPS Survey) of existing 132 KV Motiram -Kaptanganj TSS to proposed Sardarnagar TSS (Submission of drawing in triplicate of tower schedule , tower profile , making drawing in A1 format, GPS route map coloured showing B line and two alternate route map if required.
Details survey including preparation of profile & distance between proposed work regarding the erection of third bottom conductor to ensure safe ground clearance at any road crossing location , making of locations (Route length) GPS Survey of Line with co-ordinate each tower (The length of line shall be authenticated by GPS Survey) from proposed LILO Point of 132 KV Kaptanganj TSS - Hata line to proposed LILO point of 132 KV Motiram -Sardarnagar TSS ( Total line length 15.5 Km) (Submission of drawing in triplicate of tower schedule , making drawing in A1 format, GPS route map coloured showing B line ).
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.48 MB
Technical58.pdf
Tender Documents • 0.61 MB
BOQ_2004882.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .