Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.6 LAdmitted-Fee/PreQual/Technical/Finance | -33.29% | ₹2.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹3.1 L+₹50,779.68 (19.4%)Admitted-Fee/PreQual/Technical/Finance | -20.33% | ₹3.1 L+₹50,779.68 (19.4%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.9 L
EMD Value
₹7,840
Closing Date
2 Sept 2026, 4:00 pmClosed
Executive Engineer ID Ompora
Executive Engineer ID Ompora
Restoration of Majdih khul m/o KANIR canal b/w/o construction of concrete channel/Jacketting at Hanjura(at spots).
2026_IFC_320620_6
enit No 7 of 08 2026
Open Tender
Civil Works
Percentage
25 days
Budgam
Please refer Tender documents.
5 documents required · 5 mandatory
₹200
Chief Engineer Kmr I and FC Deptt.
₹7,840
17 Sept 2026
12 Aug 2026
3 Sept 2026
12 Aug 2026
2 Sept 2026
12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 29.01 | cum | 592.9 | ₹17,200.03 |
| 2 | Dumping of stones. in Horizontal on level available at site . | 11.83 | cum | 237.9 | ₹2,814.36 |
| 3 | Supply of Stones (nallah) nominal size 225 mm | 11.83 | cum | 700 | ₹8,281 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 24.18 | cum | 5,733.6 | ₹1,38,638.45 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level; 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 16.32 | cum | 7,104.35 | ₹1,15,942.99 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 107.1 | sqm | 286.35 | ₹30,668.09 |
| 7 | 12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand) | 138.6 | sqm | 283.8 | ₹39,334.68 |
| 8 | Carriage of Materials from source upto road site by Mechnical transport including cost of loading unloading and stacking
Soling Stone from Shaliganga avg. lead 4 km | 11.83 | cum | 215.98 | ₹2,555.04 |
| 8.1 | Stone aggregate avg lead 4 km | 36.04 | cum | 183.58 | ₹6,616.22 |
| 8.2 | Sand from Marvel avg. lead of 25 kms . | 20.03 | Cum | 465.14 | ₹9,316.75 |
stage.html
html • 0.02 MB
finance_1066459.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.96 MB
BOQ_1066459.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .