Loading…
Loading…
Tender Value
₹25.0 L
EMD Value
₹49,940
Closing Date
16 Oct 2026, 6:00 pm
HQ CWE SRI GANGANAGAR
HQ CWE POST BOX 48 SRI GANGANAGAR-335001 (Rajasthan)
REPAIR/MAINT TO TRANSFORMER AND ALLIED WORKS AT SGNR MIL STN
2026_MES_791177_1
CA NO CWE SGNR/TOKEN-53 OF 2026-27
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
GE SRI GANGANAGAR
Class E and above and Category b(ii)
8 documents required · 8 mandatory
₹500
GE SRI GANGANAGAR
₹49,940
Yes
25 Sept 2026
25 Sept 2026
17 Oct 2026
25 Sept 2026
16 Oct 2026
9 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Disconnecting 25 KVA to 100 KVA HT & LT side cables of indoor/ outdoor transformer and earth strip from body and neutral of transformer mounted on two pole/four pole structure /staging and taking down the transformer manually/using mechanical means and lifting, loading and tranportation transformer from MES store yard/sub station/site to workshop for repairs and opening of covers, draining out existing transformer oil, lifting of core, cleaning of oil tank, using chemicals, cleaning of core after removing HT/LT windings, re-assembling of new HT/LT windings with core varnishing heating and bringing back the same after repairs to the same point complete all as specified and directed by Engr-in-Charge.
Note : Rewinding of HT/LT coil any type/material, dehydration of transformer oil re-connecting after repair etc will be measured & paid separately under relevant items of this schedule. | 8 | Each Job | - | - |
| 2 | Disconnecting 160 KVA to 315 KVA HT & LT side cables of indoor/ outdoor transformer and earth strip from body and neutral of transformer mounted on two pole/four pole structure /staging and taking down the transformer manually/using mechanical means and lifting, loading and tranportation transformer from MES store yard/sub station/site to workshop for repairs and opening of covers, draining out existing transformer oil, lifting of core, cleaning of oil tank, using chemicals, cleaning of core after removing HT/LT windings, re-assembling of new HT/LT windings with core varnishing heating and bringing back the same after repairs to the same point complete all as specified and directed by Engr-in-Charge.
Note : Rewinding of HT/LT coil any type/material, dehydration of transformer oil re-connecting after repair etc will be measured & paid separately under relevant items of this schedule. | 6 | Each Job | - | - |
| 3 | Disconnecting 400 KVA to 630 KVA HT & LT side cables of indoor/ outdoor transformer and earth strip from body and neutral of transformer mounted on two pole/four pole structure /staging and taking down the transformer manually/using mechanical means and lifting, loading and tranportation transformer from MES store yard/sub station/site to workshop for repairs and opening of covers, draining out existing transformer oil, lifting of core, cleaning of oil tank, using chemicals, cleaning of core after removing HT/LT windings, re-assembling of new HT/LT windings with core varnishing heating and bringing back the same after repairs to the same point complete all as specified and directed by Engr-in-Charge.
Note : Rewinding of HT/LT coil any type/material, dehydration of transformer oil re-connecting after repair etc will be measured & paid separately under relevant items of this schedule. | 4 | Each Job | - | - |
| 4 | M&L for replacement of insulation material such as gasket(cork sheet for top cover), LT terminal box, LV & HV bushing washer, paper insulation for coil for 25 KVA to 100 KVA transformer complete all as specified and directed by Engr-in-Charge. | 8 | Each Job | - | - |
| 5 | M&L for replacement of insulation material such as gasket(cork sheet for top cover), LT terminal box, LV & HV bushing washer, paper insulation for coil for 160 KVA to 315 KVA transformer complete all as specified and directed by Engr-in-Charge. | 6 | Each Job | - | - |
| 6 | M&L for replacement of insulation material such as gasket(cork sheet for top cover), LT terminal box, LV & HV bushing washer, paper insulation for coil for 400 KVA to 630 KVA transformer complete all as specified and directed by Engr-in-Charge. | 4 | Each Job | - | - |
| 7 | M&L for reconnecting 25 KVA to 100 KVA transformer after complete repairs including installation & testing the transformer as per relevant IS provisions incl connecting and showing to executive and signature in Job sheeet by Engr in charge complete all as specified and directed by Engr-in-Charge. | 8 | Each Job | - | - |
| 8 | M&L for reconnecting 160 KVA to 315 KVA transformer after complete repairs including installation & testing the transformer as per relevant IS provisions incl connecting and showing to executive and signature in Job sheeet by Engr in charge complete all as specified and directed by Engr-in-Charge. | 4 | Each Job | - | - |
| 9 | M&L for reconnecting 400 KVA to 630 KVA transformer after complete repairs including installation & testing the transformer as per relevant IS provisions incl connecting and showing to executive and signature in Job sheeet by Engr in charge complete all as specified and directed by Engr-in-Charge. | 5 | Each Job | - | - |
| 10 | Supply and filling in replacement of fresh transformer oil confirming to IS 335 having di electric strength not less than 30 KV in existing transformers installed at different locations complete all as specified and directed by Engr-in-Charge.
Make : Sheetal N-68/Power oil/Castrol with test certificate. | 2,000 | Ltr | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
Tender_53.pdf
Tender Documents • 0.93 MB
BOQ_886985.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .