Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.1 LAccepted-AOC | ₹10.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹10.4 LRejected-Finance | ₹10.4 L | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical As per TCR |
| Sl No | Description | Qty | Unit | SRIDAM KUMAR DAS L1 | A.H. KHAN L2 |
|---|---|---|---|---|---|
| 1.00Construction of 01 (one) no. Ventilation stopping & Cleaning fallen coal and debris at R-III/II Seam of Khottadih Colliery, Pandaveswar Area. (Inclusive of EPF/CMPF) | |||||
| 1.01 | Cleaning at 21L/10X cut-9D | 763.02 | Cubic meter | 655.35 ₹5,00,045.16 | 678.88 ₹5,17,999.02 |
| 1.02 | site cleaning | 13.8 | Cubic meter | 655.35 ₹9,043.83 | 678.88 ₹9,368.54 |
| 1.03 | Recess cutting at floor & roof in stone by hand | 0.35 | Cubic meter | 5,822.49 ₹2,037.87 | 6,031.52 ₹2,111.03 |
| 1.04 | Recess cutting at pillar in coal two side and roof | 1.73 | Cubic meter | 1,621.45 ₹2,805.11 | 1,679.66 ₹2,905.81 |
| 1.05 | PB Work(1:8) by CB bricks | 11.73 | Cubic meter | 6,852.59 ₹80,380.88 | 7,098.6 ₹83,266.58 |
| 1.06 | Plastering on both side | 49.68 | Square Meter | 378.23 ₹18,790.47 | 391.81 ₹19,465.12 |
| 1.07 | Loading and unloading from surface to UG of material Two time PB work | 50 | Tubs | 723.69 ₹36,184.5 | 749.67 ₹37,483.5 |
| 1.08 | Manually pushing (500m-550m) | 25 | Tubs | 1,218.66 ₹30,466.5 | 1,262.41 ₹31,560.25 |
| 1.09 | Mechanical Transport | 25 | Tubs | 913.99 ₹22,849.75 | 946.8 ₹23,670 |
Tender Value
₹10.1 L
EMD Value
₹12,700
Closing Date
3 Feb 2026, 9:00 amClosed
Area Survey Officer
Office of the General Manager Pandaveswar Area , P.O. Pandaveswar, Dist.-Paschim Bardhaman, West Bengal-713346
Construction of 01 (one) no. Ventilation stopping and Cleaning fallen coal and debris at R-III/II Seam of Khottadih Colliery, Pandaveswar Area
2026_ECL_351788_1
GM/PND/Sur/Ten/25-26/165/361 Dated 21.01.2026
Open Tender
Civil Works - Others
30 days
Khottadih Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹12,700
17 Feb 2026
24 Jan 2026
4 Feb 2026
24 Jan 2026
3 Feb 2026
24 Jan 2026
24 Jan 2026 - 27 Jan 2026
Construction of 01 (one) no. Ventilation stopping & Cleaning fallen coal and debris at R-III/II Seam of Khottadih Colliery, Pandaveswar Area. (Inclusive of EPF/CMPF)
Cleaning at 21L/10X cut-9D
site cleaning
Recess cutting at floor & roof in stone by hand
Recess cutting at pillar in coal two side and roof
PB Work(1:8) by CB bricks
Plastering on both side
Loading and unloading from surface to UG of material Two time PB work
Manually pushing (500m-550m)
Mechanical Transport
Lead for carrying materials at a distance(46-60 M)
Lead for cleaning of 23L/9d to 10X cut
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.62 MB
BOQ_364561.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid