Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.0 LAccepted-AOC | ₹15.0 L | L1 | Accepted-AOC Quoted Lower Amount than other 02 Firms |
| 2 | L2₹15.0 LRejected-Finance | ₹15.0 L | L2 | Rejected-Finance Quoted higher amount than L1 |
| 3 | L3₹15.1 LRejected-Finance | ₹15.1 L | L3 | Rejected-Finance Quoted higher amount than L1 and L2 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not submitted all required documents as per Tender Enquiry |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not submitted all required documents as per Tender Enquiry |
Tender Value
₹15.0 L
EMD Value
₹30,000
Closing Date
8 Apr 2020, 11:00 amClosed
Commandant-160 Bn CRPF
HQ-160 Bn CRPF Chatha Jammu-180009
Construction of Boundary Wall from nearby MT Park to ORs Mess (Length 1057 Ft. 8 Ft. height and 1.5 Ft. depth) at Old TC Jammu
2020_CRPF_553883_1
B.V-226(699-1)/2018-19-160-SRE
Open Tender
Construction Works
Works
60 days
Old TC Channi Rama Jammu
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Commandant-160 Bn CRPF
₹30,000
Yes
22 May 2020
20 Mar 2020
9 Apr 2020
20 Mar 2020
8 Apr 2020
20 Mar 2020
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead Upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. 2.6.1 All kinds of soil
Providing and laying in position cement concrete of specified grade Excluding the cost of centering and shuttering- All work up to plinth level:1:3:6(1 Cement :3 coarse sand (zone-III) :6 graded stone aggregate 20 mm nominal size)
Providing laying in position specified grade on reinforced cement Concrete, excluding the cost of centering, shuttering, finishing and reinforcement- All work up to plinth level: 1:1:5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in walls (any thickness), including Attached plasters, butt resses, plinth and string courses, filets, columns, Pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement: 1:1:5:3 (1 cement: 1.5 coarse sand(zone-III): 3 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of from for: 1.Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
2. Columns, Pillars, Piers, Abutments, Posts and Struts
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:6 (1 cement: 6 coarse sand)
CEMENT PLASTER (IN COARSE SAND) 1. 12 mm Cement plaster of mix :1:6(1 cement: 6 coarse sand)
2. 15 mm cement plaster on rough side of single or half brick wall of mix: 1:6(1 cement :6 coarse sand)
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
GURNAM SINGH CONTRACTOR
Saahil Mir
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].