Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹7,535
Closing Date
28 Jun 2023, 9:00 amClosed
Block Development Officer,kottur block.
Block Development Office,kottur block.
1.REPAIRS TO PUM SCHOOL BUILDING North Face IN Kunniyur Kunniyur Pt, 2.REPAIRS TO PUM
2023_RDTN_329848_1
Rc.No.973/2023/a date 14.06.2023 SIDS schemeP2
Open Tender
Civil Works - Buildings
Item Rate
180 days
Kottur block
As Per Tender Document
4 documents required · 4 mandatory
₹0
₹7,535
Yes
30 Jun 2023
20 Jun 2023
28 Jun 2023
20 Jun 2023
28 Jun 2023
20 Jun 2023
Amount
1. REPAIRS TO PUM SCHOOL BUILDING North face IN Kunniyur @ Kunniyur Pt
Clean removel of Plastering surface and racking out joints including cost and conveyance of all materials to site and labour charges etc complete.
Brick work in CM 1:5 mix using country bricks including cost and conveyanceof all materials and all labour charges etc.,complete
PLASTERING WITH CM 1:5using 10mm thick including cost and conveyance of materials and all labour charges etc complete
pointing with CM 1:3 using full depth of tiles using 10% by weight of cement including cost and conveyance of materials and all labour charges etc complete
white washing two coat with best shell lime including cost of materials and all labour charegs etc complete.
Painting Two Coats Approved Distemper Paint with one coat primer over old and New Cement Plastered surface including cost and conveyance of materials and labour charges etc complete.
Painting Two Coats Approved plastic emultion Paint with one coat primer over New Cement Plastered surface including cost and conveyance of materials and labour charges etc complete.
Painting Two Coats Approved ready mixed enamal Paint with one coat primer old and new iron work including cost and conveyance of materials and labour charges etc complete.
BLACK BOARD Painting Two Coats Approved ready mixed Paint with one coat primer old surface including cost and conveyance of materials and labour charges etc complete.
Provision for Plug point
Provision for Ceiling fan
Provision for LED LIGHT
Repairs to Widow .Size (090*1.50)
Repairs to Door .Size (1.05*2.00)
Provision for Picture Painting
Provision for Cubboard (Sub Estimate)
Provision for Cheppal Rack (Sub Estimate)
Provision for Teachers Cubboard (Sub Estimate)
Provision for Drinking Water (Sub Estimate)
2.REPAIRS TO PUM SCHOOL BUILDING West face IN Kunniyur @ Kunniyur Pt.
Clean removel of Plastering surface and racking out joints including cost and conveyance of all materials to site and labour charges etc complete.
Paving the Floor with scratch proof ceromic tiles of size 20*20mm including cost and conveyance of all materials to site and all labour charges etc complete
PLASTERING WITH CM 1:5using 10mm thick including cost and conveyance of materials and all labour charges etc complete
white washing two coat with best shell lime including cost of materials and all labour charegs etc complete.
Painting Two Coats Approved Distemper Paint with one coat primer over old and New Cement Plastered surface including cost and conveyance of materials and labour charges etc complete.
Painting Two Coats Approved plastic emultion Paint with one coat primer over New Cement Plastered surface including cost and conveyance of materials and labour charges etc complete.
Painting Two Coats Approved ready mixed enamal Paint with one coat primer old and new iron work including cost and conveyance of materials and labour charges etc complete.
BLACK BOARD Painting Two Coats Approved ready mixed Paint with one coat primer old surface including cost and conveyance of materials and labour charges etc complete.
Provision for Plug point
Provision for Ceiling fan
Provision for LED LIGHT
Provision for Picture Painting
Provision for Cubboard (Sub Estimate)
Provision for Cheppal Rack (Sub Estimate)
Provision for Teachers Cubboard (Sub Estimate)
Provision for Drinking Water (Sub Estimate)
White Board Notification
Spring Closs Room
3.REPAIRS TO PUM SCHOOL Toilet South face IN Kunniyur @ Kunniyur Pt
Dismantling the exising damaged plastered and flooing surfacing including cost and conveyance of all materials to site and labour charges etc complete.
Dismantling the exising damaged plastered and flooing including cost and conveyance of all materials to site and labour charges etc complete.
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges for filling etc.,complete.
RCC 1:4 :8 mix using 40mm ISS HBG Metal including cost and conveyanceof all materials and all labour charges etc.,complete for Tie beam
PLASTERING WITH CM 1:5using 10mm thick including cost and conveyance of materials and all labour charges etc complete
Paving the Floor with scratch proof ceromic tiles of size 20*20mm including cost and conveyance of all materials to site and all labour charges etc complete
Dadooing walls Plain Galzed tiles of size 150x150x6mm
Plastering with CM 1:3,20mm thick. including cost and conveyence of all materials to site and all labour charges etc., complete complying with standard specifications and as directed by the departmental officers.
white washing two coat with best shell lime including cost of materials and all labour charegs etc complete.
Painting Two Coats Approved Distemper Paint with one coat primer over old and New Cement Plastered surface including cost and conveyance of materials and labour charges etc complete.
Painting Two Coats Approved plastic emultion Paint with one coat primer over New Cement Plastered surface including cost and conveyance of materials and labour charges etc complete.
Provision for Water supply
Provision for Repair to Toilet, urinal door
Supply and fixing for IWC including all Charges
Supply and fixing for EWC including all Charges
Provision for Septic tank Cleaning
Provision for leachpit
Provision for Pvc pipe 110 mm dia
4.REPAIRS TO PUM SCHOOL Toilet West Face IN Kunniyur @ Kunniyur Pt
Dismantling the exising damaged plastered and flooing surfacing including cost and conveyance of all materials to site and labour charges etc complete.
PLASTERING WITH CM 1:5using 12mm thick including cost and conveyance of materials and all labour charges etc complete
Finishing the top of roof with one course of PRESSED TILES of size 23 cm X 23 cm X 2 cm of approved quality laid in cement mortar 1:3 (One cement and three sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight of cement
Exterior emulsion two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
white washing two coat with best shell lime including cost of materials and all labour charegs etc complete.
Painting with enamel paint two coats new iron door works with approved colour and quality all charges
Provision for Septic tank Cleaning
5.REPAIRS TO PUM SCHOOL Toilet North Face IN Kunniyur @ Kunniyur Pt
Dismantling the exising damaged plastered and flooing surfacing including cost and conveyance of all materials to site and labour charges etc complete.
Plastering with CM 1:5,12mm thick. including cost and conveyence of all materials to site and all labour charges etc., complete complying with standard specifications and as directed by the departmental officers.
Paving the Floor with scratch proof ceromic tiles of size 20*20mm including cost and conveyance of all materials to site and all labour charges etc complete
Dadooing walls Plain Galzed tiles of size 150x150x6mm
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges for filling etc.,complete.
CC 1:4 :8 mix using 40mm ISS HBG Metal including cost and conveyanceof all materials and all labour charges etc.,complete for Tie beam
Flooring with granolitic flloring with cm 1:2:4 mix using 10to12mm iss metal to 25mm thick including cost and conveyance
white washing two coat with best shell lime including cost of materials and all labour charegs etc complete.
Exterior emulsion two coats over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete
Painting with enamel paint including cost and conveyance of all materials and all other labour charges etc., complete.
Provision for Repair to Toilet, urinal door
Provision for Septic tank Cleaning
GST Amount for providing Service to Government Contract Works for the above works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
B.Mathialagan
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .