Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.7 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹13.9 L+₹21,900.59 (1.60%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹14.8 L+₹1.2 L (8.67%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | MR.GOMATHI SANKAR, CONTRACTOR L2 | KALIMUTHU L1 | MR.MURUGAN, CONTRACTOR L3 |
|---|---|---|---|---|---|---|
| 1.00NEW ANGANWADI BUILDING | ||||||
| 2.00Earthwork excavation in all classes of Soils and Sub soils except hard rock requiring 1 blasting including initial lead and lift, dressing the excavation upto bed level for Foundation as SS 20 B specification etc., complete | ||||||
| 3.00 | Foundation | 30.18 | Cum | 263 ₹7,937.34 | 258.5 ₹7,801.53 Lowest | 300 ₹9,054 |
| 4.00 | Ramp/Steps | 1.91 | Cum | 197 ₹376.27 | 193.88 ₹370.31 Lowest | 200 ₹382 |
| 5.00 | Cement concrete 1:4:8 mix using 40mm ISS HBGS metal laid in layers not more than 15cm thick inculding cost and coveyance of all materials to site, labour charges for mixing,laying,compacting and curing etc complete., For Foundation Base Concrete | 9.98 | Cum | 5,441 ₹54,301.18 | 5,332.43 ₹53,217.65 Lowest | 6,000 ₹59,880 |
| 6.00 | Refilling with excavated soil (other than sand) complying with standard specification for filling in foundation and basement - Basement Inner Filling. | 20.49 | Cum | 45 ₹922.05 | 44.93 ₹920.62 Lowest | 50 ₹1,024.5 |
| 7.00 | Supply and filling Gravel from approved quarry for Base layer in layers not more than 15mm thick, including cost of material, labour charges for filling, levelling, sectioning and compacting etc., complete as directed by officers. | 15.38 | Cum | 321 ₹4,936.98 | 315.46 ₹4,851.77 Lowest | 400 ₹6,152 |
| 8.00 | Supplying and filling with filling sand in layers not more than 15 cm thick including labour charges for Filling, Levelling, watering, well rammed and compacted etc., complete - Floor Filling material. | 4.37 | Cum | 1,807 ₹7,896.59 | 1,771.36 ₹7,740.84 Lowest | 1,900 ₹8,303 |
| 9.00Brick work with cement mortar 1:5 mix using Country bricks for Foundation, Basement and Superstructure inculding cost and conveyance of all materials to site, labour charges for curing and other incidental charges etc ,complete - Above Basement/Superstructure Masonry works. | ||||||
| 10.00 | Sub Structure - Basement | 9.56 | Cum | 6,133 ₹58,631.48 | 6,012.21 ₹57,476.73 Lowest | 6,200 ₹59,272 |
Tender Value
Refer Docs
EMD Value
₹17,500
Closing Date
24 Sept 2026, 3:00 pmClosed
Block development office, VP, Kuruvikulam
Block development office, VP, Kuruvikulam
COLRD/7117/2025-H7/ VP 26-27/CONSTRUCTION OF NEW ANGANWADI BUILDING AT NORTH STREET IN KALANKULAM VILLAGE AND PANCHAYAT
2026_RDTN_702827_2
COLRD/7117/2025.H7
Open Tender
Civil Works
Works
Kuruvikulam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹17,500
26 Sept 2026
9 Sept 2026
24 Sept 2026
9 Sept 2026
24 Sept 2026
9 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | NEW ANGANWADI BUILDING | - | - | - | - |
| 2 | Earthwork excavation in all classes of Soils and Sub soils except hard rock requiring 1 blasting including initial lead and lift, dressing the excavation upto bed level for Foundation as SS 20 B specification etc., complete | - | - | - | - |
| 3 | Foundation | 30.18 | Cum | 263.78 | ₹7,960.88 |
| 4 | Ramp/Steps | 1.91 | Cum | 197.84 | ₹377.87 |
| 5 | Cement concrete 1:4:8 mix using 40mm ISS HBGS metal laid in layers not more than 15cm thick inculding cost and coveyance of all materials to site, labour charges for mixing,laying,compacting and curing etc complete., For Foundation Base Concrete | 9.98 | Cum | 5,441.26 | ₹54,303.77 |
| 6 | Refilling with excavated soil (other than sand) complying with standard specification for filling in foundation and basement - Basement Inner Filling. | 20.49 | Cum | 45.84 | ₹939.26 |
| 7 | Supply and filling Gravel from approved quarry for Base layer in layers not more than 15mm thick, including cost of material, labour charges for filling, levelling, sectioning and compacting etc., complete as directed by officers. | 15.38 | Cum | 321.9 | ₹4,950.82 |
| 8 | Supplying and filling with filling sand in layers not more than 15 cm thick including labour charges for Filling, Levelling, watering, well rammed and compacted etc., complete - Floor Filling material. | 4.37 | Cum | 1,807.51 | ₹7,898.82 |
| 9 | Brick work with cement mortar 1:5 mix using Country bricks for Foundation, Basement and Superstructure inculding cost and conveyance of all materials to site, labour charges for curing and other incidental charges etc ,complete - Above Basement/Superstructure Masonry works. | - | - | - | - |
| 10 | Sub Structure - Basement | 9.56 | Cum | 6,134.91 | ₹58,649.74 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.56 MB
BOQ_844892.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .