Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹90,110.30Admitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹90,252+₹141.70 (0.16%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹90,252
EMD Value
₹2,708
Closing Date
14 Aug 2026, 6:00 pmClosed
EX ENGINEER REW KULGAM
EX ENGINEER REW KULGAM
FENCING OF GRAVEYARD AT JOGIPORA. 83
2026_RDPR_319898_4
e- NIT No. 56 OF REWK/PRI/2026-27 Dated 07-08-2026
Open Tender
Civil Works
Percentage
40 days
KULGAM
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
EX ENGINEER REW KULGAM
₹2,708
22 Aug 2026
7 Aug 2026
17 Aug 2026
7 Aug 2026
14 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cess pits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto1.5m,including getting out excavated earth and disposal of surplus excavated earth as directed 2.8.1 all kinds of soil | 3.29 | cum | - | - |
| 2 | Providing and laying in position stone soling using Nallah stone including all leads, lifts and carriages complete job | 2.15 | cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6graded stone aggregate 20 mm nominal size) | 6.15 | cum | - | - |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns | 40.33 | sqm | - | - |
| 5 | Structural Steel work in single section without connecting plate incl all | 145.16 | kg | 1 | ₹145.01 |
| 6 | P/F of Chain Link fencing of 2"x2" | 248 | sft | - | - |
| 7 | Painting with synthetic enamel Paint all complete | 23.04 | sqm | - | - |
| 8 | Carriage charges of materials | 8.36 | cum | - | - |
| 9 | Provision for sign board and photographs, ETC | 1 | No | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.55 MB
BOQ_1061449.xls
BOQ • 0.25 MB
corrigendtion.pdf
PDF • 0.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .