| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC NA | NA | NA | 121004 | ₹1.5 Cr Quoted ₹1.7 Cr | L1 | Accepted-AOC accepted |
| 2 | L2₹1.8 Cr+₹9.5 L (5.44%)Rejected-AOC HOUSE NO 101 SEC 20 PART II HUDA SIRSA | ₹1.8 Cr+₹9.5 L (5.44%) | L2 | Rejected-AOC Rejected due to refund of emd |
| 3 | L3₹1.9 Cr+₹11.1 L (6.38%)Rejected-AOC | ₹1.9 Cr+₹11.1 L (6.38%) | L3 | Rejected-AOC Rejected due to refund of emd |
| 4 | Rejected-Technical | - | - | Rejected-Technical Due Technical criteria |
Tender Value
₹1.6 Cr
EMD Value
₹3.3 L
Closing Date
3 Sept 2021, 5:00 pmClosed
Executive Engineer
Executive Engineer PD2 PWD BandR Branch Sirsa
Restoration of damage due to Laying and Jointing of Storm Drainage Pipe at Sirsa town Under AMRUT Programme in Sirsa Distt. DHS road Km. 252.370 to 254.73 L.H.S
2021_HRY_184247_1
Restoration of damage due to Laying and Jointing
Open Tender
Civil Works - Roads
Item Wise
120 days
Sirsa
Please refer Tender documents.
3 documents required · 3 mandatory
₹15,000
Yes
₹3.3 L
Yes
1 Feb 2022
20 Aug 2021
4 Sept 2021
20 Aug 2021
3 Sept 2021
20 Aug 2021
Amount
Excavation for roadwork in soil by mechanical means including cutting , trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and any lead as per technical clause 301 of MORT&H specifications (Based on HSR 17.10.1)
Construction of Embankment (reconstruction) with approved material obtained from borrow pits, including compensation of earth, with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2, as per technical clause 305 of MORT&H specifications (Based on HSR 17.6) Note: In case the quantity of earth work calculated with NSL and finished level found to be less than 787.50 cum. Then actual quantity (less than 787.50 cum) will be paid. In case quantity worked out is more than 787.50 cum, then only 787.50 cum will be paid. Excess quantity shall be incidental to work and nothing extra will be paid. Further it shall be ensured that atleast 500 mm of sub grade with earth of CBR 8% shall be constructed at each location. Wherever any cutting of existing subgrade is required on this account excavation as well as handling and disposal of earthwork to accommodate minimum 500mm thick subgrade of minimum 8% CBR shall be carried out by the agency at his own cost. Nothing extra will be paid on this account. Before start of work, L-section shall be got approved from the employer with respect to GTS. However, typical X-section attached at section 5 of DNIT. Note:-No earth work will be allowed to be taken from PWD B&R/ ROW except for surplus earth after approval from Engineer.
Providing & laying 200 mm Granular Sub-Base with Coarse Graded Material - Grading-I (Table:- 400-2) Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.of MORT&H specifications. Grading I material (Based on HSR 17.15.1) Note: - 1.Only crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by the engineer.
Providing, laying WBM (G-II) (53 mm to 22.4 mm with screening Type “B” 75 mm each layer) , spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications (Based on HSR 17.23.2) Note: - 1.Only crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by the engineer.
Providing & laying 100 mm Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per technical clause 406 of MORT&H specifications (Based on HSR 17.24) Note: - 1.Only crushed stone metal material should be used. No local earth/ natural occurring sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by the engineer.
Providing and applying primer coat with bitumen emulsion(Grade-I) @ 0.60 kg per sqm on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means as per technical clause 503 of MORT&H specifications (Based on HSR 17.25)
Providing and applying tack coat with penetration grade bitumen VG - 10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom as per technical clause 503 of MORT&H specifications (Based on HSR 17.26.2)
Providing and laying 100 mm dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG 30 @ 4.0% by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete, as per technical clause No. 505 of MORT&H specifications (Based on HSR 17.30.2) Note: If bitumen required is this account more than 4.0% as per job mix formula no extra payment will be made, extra bitumen required will be considered as incidental to work.
Providing and laying 30 mm bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG - 30 @ 5.4% per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete as per technical clause 507 of per MORTH specifications.(HSR 17.31.4) Note: If bitumen required is this account more than 5.4% as per job mix formula no extra payment will be made, extra bitumen required will be considered as incidental to work.
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including Reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. (HSR 34.26) Note:- Before start of work the contractor shall give brand , batch no. , manufacturing date of the material to be used and get approved thbe same from Engineer-In-Charge before use.
M/s.S.D.N.R.CONSTRUCTION COMPANY
Nirmal Singh contractor
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .