Loading…
Loading…
Tender Value
₹1.5 Cr
EMD Value
₹2.9 L
Closing Date
8 Jun 2026, 6:00 pm3d left
EE PWD Div Asind
EE PWD Div Asind
CONSTRUCTION OF ATAL PRAGATI PATH LEFT OUT PORTION SH 39A KM 0/0 TO 2/00
2026_CEPWD_563053_1
NIT-04/2026-27 PWD ASIND
Open Tender
Civil Works
210 days
Asind
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Egras Challan Deposit
₹2.9 L
Yes
29 May 2026
29 May 2026
9 Jun 2026
29 May 2026
8 Jun 2026
29 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per MoRTH Specification Clause 202 By Mechanical Means Bituminous Courses & Granular Courses | 365.75 | Cum | 69 | ₹25,236.75 |
| 2 | Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately | 1,097.25 | Cum | 515 | ₹5,65,083.75 |
| 3 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per MoRTH
Specification Clause 301.3 | 1,862 | Cum | 20 | ₹37,240 |
| 4 | Providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per Table 400-1,400-2 or any other course material as per design mix, as per CBR in sub base course including premixing the material at OMC in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader F.E loader on a prepared base and compacting with vibratory roller to achieve desired density (as per I.S.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[MoRTH specification : Clause 401]. By mechanical means.For Grading-II Material | 935.52 | Cum | 438 | ₹4,09,757.76 |
| 5 | Construction of dry lean cement concrete Sub-base over a prepared sub-grade with coarse and fine aggregate conforming to IS:383, the sizeof coarse aggregate not exceeding 25mm, aggregate cement ratio not to exceed 15:1,aggregate gradation after blending to be as per table600-1, cement content not tobe less than150kg/ cum, optimum moisture content to be determined during trial length construction,concrete strength not to be less than 10 Mpa at 7days, mixed in a fully automatic computerised batching plant, transported to site, laid with a paver with electronicsensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. | 935.52 | Cum | 2,418 | ₹22,62,087.36 |
| 6 | Construction of un-reinforced , plain cement concrete pavement M30 (Grade), thickness as per design, over a prepared sub base, with 43/53 grade cement as per Clause 602, coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 31.5 mm, mixed in fully automatic Computerised Batching Plant compatiable with Printer and Pen Drive and transported to site in transit mixer for having continuous agitated mixer, manufactured as per approved mix design including pumping of R.M.C. from transit mixer to site of laying , with all lead and lift including cost of admixtures in recommended portion as per IS 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge laid with a Fixed Form Paver (laying and fixing of 150 micron thick polythene Film and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days using water finishing to lines and grade as per drawing and MoRTH Specification Clause 602 with all required equipments (Dowel Bars & Tie Bar will be paid seprately). | 1,871.04 | Cum | 5,160 | ₹96,54,566.4 |
| 7 | Providing and Fixing of Dowel Bars of Mild Steel confirming to IS : 432 of specified length and diameters as per MoRTH Specification IRC 15 & 58 including cutting, placing in position across transverse joint with proper spacing, providing with PVC sleeve complete as per drawing, technical specification and as per direction of the Engineer-in-charge. | 665.28 | Kg | 66 | ₹43,908.48 |
| 8 | Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 2905.300 mm Dia | 60 | Mtr | 612 | ₹36,720 |
| 9 | Earthwork in excavation for structures as per drawing and MoRTH specifications Clause 304.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Ordinary soil Upto 3 m depth | 830 | Cum | 137 | ₹1,13,710 |
| 10 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and MoRTH specifications Clause 1702, 1703, 2102 & 2104 P.C.C grade M 10 Nominal mix 1:3:6 | 166 | Cum | 2,584 | ₹4,28,944 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 23.42 MB
Tendernotice_2.pdf
PDF • 2.53 MB
01-TD-Agucha.pdf
Tender Documents • 0.19 MB
BOQ_1002133.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid