Loading…
Loading…
Tender Value
₹35.6 L
EMD Value
₹71,300
Closing Date
5 Oct 2026, 4:00 pm
Executive Engineer RnB Division Kulgam
Executive Engineer RnB Division Kulgam
Repair and Renovation of Ziyarat Shareef at Poniwah
2026_PWDJK_325789_7
68/2026-27/RnB/Kul/6877-87 Dtd 22-09-2026
Open Tender
Civil Works
Percentage
45 days
Kulgam
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,100
Account No. 0470010200000099
₹71,300
24 Sept 2026
24 Sept 2026
6 Oct 2026
24 Sept 2026
5 Oct 2026
24 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Main Building | |||||
| 1.01 | Demolishing brick work manually/by mechanical means including
stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: | 8.19 | Cum | 1,278.64 | ₹10,465.67 |
| 1.02 | Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: | 9.52 | Cum | 1,525.85 | ₹14,532.2 |
| 1.03 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 meters lead : | 8 | Each | 250.08 | ₹2,000.64 |
| 1.04 | Dismantling wood work in frames, trusses, purlins and rafters upto 10 meters span and 5 meters height including stacking the material within 50
meters lead : | 4.1 | Cum | 3,058.64 | ₹12,537.37 |
| 1.05 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: | 13.72 | Cum | 1,512.46 | ₹20,743.39 |
| 1.06 | Dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50
meters lead as per direction of Engineer-in-charge: | 7.14 | Cum | 1,785.34 | ₹12,749.11 |
| 1.07 | Dismantling roofing including ridges, hips valleys and gutters etc., and stacking the material within 50 meters lead of : | 40.99 | Sqm | 109.92 | ₹4,505.07 |
| 1.08 | Engagement of JCB and Tractor, labour etc for dismentling, dressing and disposal of waste material etc | - | - | - | - |
| 1.09 | Engagement Tractor | 14 | Trip | 338.98 | ₹4,745.72 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.62 MB
BOQ_1101397.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .