Loading…
Loading…
Tender Value
₹4.3 L
EMD Value
₹8,629
Closing Date
13 Oct 2026, 5:00 pm
Executive Officer
nagar palika parishad shamli
Ward 20 vikas nagar Construction of cc road and drain from house of dr harpal singh to satpal
2026_DOLBU_1187726_95
330/E-T/PWC/2026-27
Open Tender
Civil Works
Percentage
Ward 20 vikas nagar Construction of cc road and dr
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Executive Officer
₹8,629
22 Sept 2026
22 Sept 2026
14 Oct 2026
22 Sept 2026
13 Oct 2026
22 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of Reinforced Cement Concrete by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in 1 volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately | 3.38 | Cum | 1,032 | ₹3,488.16 |
| 2 | Dismantling of Dismantling Brick existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, 2 including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202. | 3.24 | Cum | 409 | ₹1,325.16 |
| 3 | Deduct the cost of old bricks class-100 | 224 | nos | 4.5 | ₹1,008 |
| 4 | Ded the cost of old bricks/bats M-75 | 0.49 | cum | 900 | ₹441 |
| 5 | Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately | 70 | cum | 595 | ₹41,650 |
| 6 | Cartage of Ballast, Kankar, Coal, Grit or Sand 1 etc. including loading and unloading but excluding stackings on pucca roads. Upto 8 Km. | 63 | cum | 230.1 | ₹14,496.3 |
| 7 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. as per MoRT&H specification clause No. 305 | 52.5 | cum | 340.4 | ₹17,871 |
| 8 | Providing concrete for plain/reinforced concrete in (P.C.C grade M 10)(1:3:6) open foundations complete as per drawings and technical 8 specifications Clause 802, 803, 1202 & 1203, 1/c all cos, Labour cess, levy, toll fee, royalty, Contractor Profit but e | 2.8 | cum | 6,060.7 | ₹16,969.96 |
| 9 | Plain/reinforced cement concrete (P.C.C grade M 20) in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204. I/c all cess, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST for height upto 5m | 4.6 | Cum | 6,249.3 | ₹28,746.78 |
| 10 | WBM Grading 3-Providing, laying, spreading and compacting stone aggregates of specific sizes 53 mm to 22.4 mm to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages | 17.5 | Cum | 3,389.17 | ₹59,310.48 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.54 MB
BOQ_2237964.xls
BOQ • 0.33 MB
technicaldocument.pdf
Tender Documents • 1.52 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .