Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹4.0 CrAccepted-AOC NULL | ₹4.0 Cr | L-1 | Accepted-AOC L-1 Bidder |
| 2 | L-2₹4.3 Cr+₹29.8 L (7.45%)Rejected-Finance C O JOGESHWAR CHINTEY DUSUTIMUKH PO KHUBALIA PS DHEMAJI DIST DHEMAJI PIN 787057 ASSAM | DHEMAJI | ASSAM | 787057 | ₹4.3 Cr+₹29.8 L (7.45%) | L-2 | Rejected-Finance Allotted to L-1 bidder |
| 3 | Rejected-Technical NULL | - | - | Rejected-Technical Qualification of Asstt. Project Manager is not BFSc |
| 4 | Rejected-Technical | - | - | Rejected-Technical Non submission of Relevant document |
| Sl No | Description | Qty | Unit | T J Biswajit Mahengia L2 | MUNIN DAS L1 |
|---|---|---|---|---|---|
| 1.00Construction of Earthern nursery Pond(Tank 1) | |||||
| 1.01 | Item 1/APWD(SHMDR ) 3.6 Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with disposal upto 1000 metres. Excavation ..............of 0.9 cu.m bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sectionss, loading and disposal of cut road with in all lifts and leads upto 1000 metres. | 2,220.25 | cum | 82 ₹1,82,060.5 | 71 ₹1,57,637.75 Lowest |
| 2.00Construction of earthern Nursery Pond(tank 2) | |||||
| 2.01 | Item 1/APWD(SHMDR ) 3.6 Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with disposal upto 1000 metres. Excavation ..............of 0.9 cu.m bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sectionss, loading and disposal of cut road with in all lifts and leads upto 1000 metres. | 1,815.25 | cum | 82 ₹1,48,850.5 | 71 ₹1,28,882.75 Lowest |
| 3.00Construction of earthern Nursery Pond(Tank 3) | |||||
| 3.01 | Item 1/APWD(SHMDR ) 3.6 Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with disposal upto 1000 metres. Excavation ..............of 0.9 cu.m bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sectionss, loading and disposal of cut road with in all lifts and leads upto 1000 metres. | 2,546.75 | cum | 82 ₹2,08,833.5 | 71 ₹1,80,819.25 Lowest |
| 4.00Construction of Brood stock Pond | |||||
| 4.01 | Item 1/APWD(SHMDR ) 3.6 Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with disposal upto 1000 metres. Excavation ..............of 0.9 cu.m bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sectionss, loading and disposal of cut road with in all lifts and leads upto 1000 metres. | 13,912 | cum | 82 ₹11,40,784 | 71 ₹9,87,752 Lowest |
| 5.00Construction of Brood stock Raising Pond | |||||
| 5.01 | Item 1/APWD(SHMDR ) 3.6 Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with disposal upto 1000 metres. Excavation ..............of 0.9 cu.m bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sectionss, loading and disposal of cut road with in all lifts and leads upto 1000 metres. | 7,950.38 | cum | 82 ₹6,51,931.16 | 71 ₹5,64,476.98 Lowest |
Tender Value
₹4.8 Cr
EMD Value
₹9.6 L
Closing Date
5 Mar 2026, 2:00 pmClosed
Director of Fisheries, Assam, Guwahati
Directorate of Fisheries, Meen Bhawan,Assam, Guwahati
Establishment of Brood Bank in Govt. Farms at Narangbari in Goalpara District, Assam
2026_FD_51135_1
AF(S)185PMMSY2024-25 /6425-29 12/2/2026
Open Tender
Civil Works
Works
180 days
Goalpara
Please, refer bid documents
4 documents required · 4 mandatory
₹9,560
₹9.6 L
Yes
Directorate of Fisheries, Assam, Guwahati
31 Jul 2026
13 Feb 2026
5 Mar 2026
13 Feb 2026
5 Mar 2026
21 Feb 2026
20 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of Earthern nursery Pond(Tank 1) | |||||
| 1.01 | Item 1/APWD(SHMDR ) 3.6 Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with disposal upto 1000 metres. Excavation ..............of 0.9 cu.m bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sectionss, loading and disposal of cut road with in all lifts and leads upto 1000 metres. | - | cum | 84 | - |
| 2Construction of earthern Nursery Pond(tank 2) | |||||
| 2.01 | Item 1/APWD(SHMDR ) 3.6 Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with disposal upto 1000 metres. Excavation ..............of 0.9 cu.m bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sectionss, loading and disposal of cut road with in all lifts and leads upto 1000 metres. | - | cum | 84 | - |
| 3Construction of earthern Nursery Pond(Tank 3) | |||||
| 3.01 | Item 1/APWD(SHMDR ) 3.6 Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with disposal upto 1000 metres. Excavation ..............of 0.9 cu.m bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sectionss, loading and disposal of cut road with in all lifts and leads upto 1000 metres. | - | cum | 84 | - |
| 4Construction of Brood stock Pond | |||||
| 4.01 | Item 1/APWD(SHMDR ) 3.6 Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with disposal upto 1000 metres. Excavation ..............of 0.9 cu.m bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sectionss, loading and disposal of cut road with in all lifts and leads upto 1000 metres. | - | cum | 84 | - |
| 5Construction of Brood stock Raising Pond | |||||
| 5.01 | Item 1/APWD(SHMDR ) 3.6 Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with disposal upto 1000 metres. Excavation ..............of 0.9 cu.m bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sectionss, loading and disposal of cut road with in all lifts and leads upto 1000 metres. | - | cum | 84 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
BIDBROODBANK.pdf
Tender Documents • 1.36 MB
BOQ_81322.xls
BOQ • 0.67 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .