| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹48.7 LAccepted-AOC BELMANDAL TA HADGAON DIST NANDED | BELMANDAL | NANDED | MAHARASHTRA | ₹48.7 L | 1st | Accepted-AOC AOC |
| 2 | 2nd₹49.0 LRejected-AOC | ₹49.0 L | 2nd | Rejected-AOC AOC |
| 3 | 3rd₹50.1 LRejected-AOC NARANGAL TA NAIGAON KH DIST NANDED PIN 432709 | NANDED | NANDED | MAHARASHTRA | 432709 | ₹50.1 L | 3rd | Rejected-AOC AOC |
| 4 | 4th₹50.4 LRejected-AOC N A | FARIDABAD | HARYANA | 121004 | ₹50.4 L | 4th | Rejected-AOC AOC |
Tender Value
₹50 L
EMD Value
₹50,000
Closing Date
23 Dec 2025, 5:00 pmClosed
EEZPWORKSDIVBHOKAR
EEZPWORKSDIVBHOKAR
Improvement of road Hardaf to Devsari VR 121 km 0/00 to 3/00 Tq Hadgaon Dist Nanded
2025_NANDE_1260560_6
ZPN/WD/Bhok/e.TEN14/OPEN/25-26
Open Tender
Civil Works
180 days
Improvement of road Hardaf to Devsari VR 121 km 0/
Please refer Tender documents.
5 documents required · 5 mandatory
₹590
₹50,000
22 Mar 2026
16 Dec 2025
24 Dec 2025
16 Dec 2025
23 Dec 2025
16 Dec 2025
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. Spec. No.: MORTH 201 SSR No.2.09 P.No. 23
Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. Spec. No.: MORTH 309 SSR No.2.18 P.No. 24
Providing earth work in embankment with approved materials obtained from other sources upto lead of 50m. including all lifts, laying in layers of 20cm. to 30cm. thickness breaking clods, dressing to the required lines, curves, grades & section, watering and compaction with vibratory roller with V-Sat attachment to achieve not less than 97 % of standard proctor density etc. complete ( Material obtained from Other sources) Spec. No.: MORTH 305 SSR No.2.28 P.No. 25
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader/ Paver on prepared surface and compacting with vibratory roller to achieve the desired density, complete as per clause 401 -- Plant Mix Method and Grading - I Material Spec. No.: MORTH 401 SSR No.3.01 P.No. 27
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting with vibratory roller to the required density. By Mechanical Means -Grading I (Using Screening Type B (11.2 mm) Aggregate) Spec. No.: MORTH 404 SSR No.3.19 P.No. 29
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting with vibratory roller to the required density. By Mechanical Means - Grading II (Using Screening Type B (11.2 mm) Aggregate) Spec. No.: MORTH 404 SSR No.3.20 P.No. 29
Providing and constructing 75 mm. thick Modified Penetration Macadam (MPM) road surface including all materials, preparing the existing road surface, spreading 40 mm. stone metal layers 100% crusher broken metal with conical crusher plant heating and spraying the bitumen of specified grade @ 2 Kg/sqm, spreading 12 mm.size chips compacting with three wheel static roller having weight 8 to 10 MT. to achive the desired degree of compaction as per Technical Specification Clause 506 etc. complete. Including picking of existing WBM surface. (VG-30 bulk bitumen rates are considered to arrive at rates) Spec. No.: IRC-SP-20, 2002 Clause No. 8.7.3 SSR No.3.35b P.No. 31
Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen set footed in bitumen boller on B.T. surface 2.5 kg/10 sqm.(VG-30 bulk bitumen rates are considered to arrive at rates) Spec. No.: MORTH 503 SSR No.3.30 P.No. 30
Open Graded Premix Surfacing- Providing and Laying OGC 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates premixed with bituminous binder transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction but excluding prime / tack and Seal coat. For Bitumen of specified grade--USING drum mix type hot mix plant with SCADA, Paver and Vibratory roller ( Over MPM Surface) (VG-30 bulk bitumen rates are considered to arrive at rates) Spec. No.: MORTH 510 SSR No.4.12 P.No. 36
Providing bituminous Type A liquid seal coat on bituminous surface including supplying all materials and bitumen of specified grade preparing existing road surface, heating and applying bitumen @ 0.98 KgSqm. by mechanical means, spreading chips and rolling, by static roller having weight 8 to 10 MT. etc. complete. (VG- 30 bulk bitumen rates are considered to arrive at rates) Spec. No.: MORTH 511 SSR No.4.01 P.No. 35
Providing and fixing RCC 200 metre stones as per I.R.C. standard including fixing in standard size C.C. 1:4:8 block including curing, painting lettering etc. complete. Spec. No.: MORTH 805 SSR No.6.02a P.No. 46
Providing and fixing 1:2:4 Ordinary Km. Stones metre stones as per I.R.C. standard including fixing in standard size C.C. 1:4:8 block including curing, painting lettering etc. complete. Spec. No.: MORTH 805 SSR No.6.02b P.No. 46
A) For Sand = Royalty + Surcharge (2%) + Distt. Mineral Foundation Cess (10%) = 211.95 + 4.23 + 21.19 = 237.37 Per Cum.
B) For All Other Minerals = Royalty + Surcharge (2%) = 211.95 + 4.23 = 216.18 Per Cum.
Laboratory Testing Charges etc. Bitumen
Fine Aggregates
Add for 18% GST
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.07 MB
BOQ_2172460.xls
BOQ • 0.26 MB
Details_tender_notice1_Bhokar.pdf
Tender Documents • 12.04 MB
Download all tender documents and submit your bid