Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.7 LAccepted-Finance | L1 | Accepted-Finance Agg with L1 | |
| 2 | L2₹15.1 L+₹36,265.35 (2.47%)Accepted-Finance | L2 | Accepted-Finance Agg with L1 |
| Sl No | Description | Qty | Unit | AASHTA CONSTRUCTION L1 | bhadana contractor L2 |
|---|---|---|---|---|---|
| 1.00 | Dismentling of R.C.C. work With its Proper stacking of material including all cost of labour T & P, etc. As per direction of engineer incharge | 18.39 | Cum | 300 ₹5,517 Lowest | 575 ₹10,574.25 |
| 2.00 | Dismentling of B/W work With its Proper stacking of material including all cost of labour T & P, etc. As per direction of engineer incharge | 38.05 | Cum | 300 ₹11,415 Lowest | 490 ₹18,644.5 |
| 3.00 | Laying dismentaled material i/c all cost of labour T&P ,etc Complete As per direction of engineer incharge | 56.44 | cum | 110 ₹6,208.4 | 100 ₹5,644 Lowest |
| 4.00 | Earth work in excavation in foundation in all types of soil including lift upto 1.50m and lead 30m and including back filling ,watering and ramming of excavated earth into the trenches or into the space between or into the plinth with removal and disposal of surplus earth as directed by the engineer in charge upto a distance of 30m from the foundation tranches | 107.8 | Cum | 90 ₹9,702 | 80 ₹8,624 Lowest |
| 5.00 | Centering and shuttering forP.C.C. work for including cost of material T&P etc complete | 15.42 | Sqm | 400 ₹6,168 Lowest | 500 ₹7,710 |
| 6.00 | P.C.C. 1:3:6 (M10) in foundation with crushed aggregate & coarse sand with all cost of material, T&P and labour complete. | 16.86 | Cum | 4,000 ₹67,440 Lowest | 4,900 ₹82,614 |
| 7.00 | Centering and shuttering for R.C.C. work including cost of material T&P etc complete | 196.6 | Sqm | 400 ₹78,640 Lowest | 700 ₹1,37,620 |
| 8.00 | Placing steel Reinforcement for Rcc Work including cost of material ,cutting,bending,binding,welding etc Complete | 8.81 | M.T | 81,000 ₹7,13,610 | 73,500 ₹6,47,535 Lowest |
| 9.00 | Providing and laying RCC (M-20) 1:1.5:3 with crushed stone ballast and coarse sand with cost of material including T&P, labour etc. as per directed by Engineer in charge. | 84.4 | Cum | 4,875 ₹4,11,450 Lowest | 5,400 ₹4,55,760 |
| 10.00 | C.C. 1:1:2 (M25) in wearing coat with crushed aggregate & coarse sand with all cost of material, T&P and labour complete. | 2.06 | Cum | 5,500 ₹11,330 Lowest | 6,000 ₹12,360 |
Tender Value
₹17.5 L
EMD Value
₹35,000
Closing Date
15 Sept 2026, 11:00 amClosed
EE MDGC MUZAFFARNAGAR
EE MDGC MUZAFFARNAGAR
Reconstruciton of VRB Main Basera Dy at Km 6.850
2026_UPIDC_1173256_17
TN-02/EE/2026-27
Open Tender
Civil Works
Item Wise
45 days
as per tender notice
as per tender notice
2 documents required · 2 mandatory
₹854
₹35,000
8 Oct 2026
10 Sept 2026
15 Sept 2026
10 Sept 2026
15 Sept 2026
10 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentling of R.C.C. work With its Proper stacking of material including all cost of labour T & P, etc. As per direction of engineer incharge | 18.39 | Cum | - | - |
| 2 | Dismentling of B/W work With its Proper stacking of material including all cost of labour T & P, etc. As per direction of engineer incharge | 38.05 | Cum | - | - |
| 3 | Laying dismentaled material i/c all cost of labour T&P ,etc Complete As per direction of engineer incharge | 56.44 | cum | - | - |
| 4 | Earth work in excavation in foundation in all types of soil including lift upto 1.50m and lead 30m and including back filling ,watering and ramming of excavated earth into the trenches or into the space between or into the plinth with removal and disposal of surplus earth as directed by the engineer in charge upto a distance of 30m from the foundation tranches | 107.8 | Cum | - | - |
| 5 | Centering and shuttering forP.C.C. work for including cost of material T&P etc complete | 15.42 | Sqm | - | - |
| 6 | P.C.C. 1:3:6 (M10) in foundation with crushed aggregate & coarse sand with all cost of material, T&P and labour complete. | 16.86 | Cum | - | - |
| 7 | Centering and shuttering for R.C.C. work including cost of material T&P etc complete | 196.6 | Sqm | - | - |
| 8 | Placing steel Reinforcement for Rcc Work including cost of material ,cutting,bending,binding,welding etc Complete | 8.81 | M.T | - | - |
| 9 | Providing and laying RCC (M-20) 1:1.5:3 with crushed stone ballast and coarse sand with cost of material including T&P, labour etc. as per directed by Engineer in charge. | 84.4 | Cum | - | - |
| 10 | C.C. 1:1:2 (M25) in wearing coat with crushed aggregate & coarse sand with all cost of material, T&P and labour complete. | 2.06 | Cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.87 MB
Tendernotice_2.pdf
PDF • 1.92 MB
BOQ_2227448.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .