Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹1.9 L
Closing Date
25 Nov 2026, 12:00 pm3d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EE CD1 PWD VARANASI
EE CD1 PWD VARANASI
JANPAD VARANASI KE NIRMAN KHAND 1 LOK NIRMAN VIBHAG VARANASI KE KARYALAY BHAVAN KE VISTAR KA KARYA
2026_CEUVZ_1210046_2
5576/15A/2026-27DATE 09/10/2026
Open Tender
Civil Works - Buildings
Percentage
90 days
VARANASI
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹1.9 L
18 Nov 2026
18 Nov 2026
25 Nov 2026
18 Nov 2026
25 Nov 2026
18 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50m and lift up to 1.5m, disposed earth to be levelled and neatly dressed.All kinds of soil (2.6.1)(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 44.02 | CUM | 130.46 | ₹5,742.85 |
| 2 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 4.64 | CUM | 1,560.96 | ₹7,242.85 |
| 3 | Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion)Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor:With Chlorpyriphos/Lindane E.C. 20% with 1% concentration(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 35.12 | CUM | 227.89 | ₹8,003.5 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 7.36 | CUM | 5,006.82 | ₹36,850.2 |
| 5 | Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 12.5mm nominal size derived from
natural sources)(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 5.85 | SQM | 301.97 | ₹1,766.52 |
| 6 | Providing & applying a coat of residual petroleum bitumen of grade of VG-10 of approved quality using 1.7 kg per square metre on damp proof course after cleaning the surface with brushes and finally with a piece of cloth lightly soaked in kerosene oil.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 5.85 | Sqm | 107.42 | ₹628.41 |
| 7 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttring, finishing and reinforcement- All work up to plinth level1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)RAFT(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 9.69 | CUM | 6,648.63 | ₹64,425.22 |
| 8 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttring, finishing and reinforcement- All work up to plinth level1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)COLUMN(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 1.25 | CUM | 6,648.63 | ₹8,310.79 |
| 9 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttring, finishing and reinforcement- All work up to plinth level1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) BEAM(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 3.19 | CUM | 6,648.63 | ₹21,209.13 |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | - | kg | 79.27 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.86 MB
T1.pdf
Tender Documents • 0.32 MB
BOQ_2297822.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .