Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance PLOT NO U 58 MIDC AREA MIDC AREA HINGNA ROAD MIDC HINGNA NAGPUR MAHARASHTRA 440016 | NAGPUR | MAHARASHTRA | 440016 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹6.1 L
EMD Value
₹7,676
Closing Date
16 Oct 2024, 6:00 pmClosed
STAFF OFFICER E and M
OFFICE OF THE AGM, WCL PENCH AREA
Repairing/rewinding of Transformers at RWS, Pench Area.
2024_WCL_318492_1
wcl-pe3350-enm-65-2024-25
Open Tender
Miscellaneous Works
Item Rate
30 days
RWS CHANDAMETTA, PENCH AREA
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,676
18 Oct 2024
1 Oct 2024
18 Oct 2024
1 Oct 2024
16 Oct 2024
2 Oct 2024
1 Oct 2024 - 8 Oct 2024
Amount
Rewinding/repairing of 01 No. 315kVA, 3.3kV/565V Transwitch Unit at Regional Workshop, Chandametta.
COMPLETE REWINDING HV WINDING OF ALL 3 PHASE , WITH COPPER DPC COVERED WIRE STRIP 99.98% ELECTROLYTIC COPPER CONDUCTOR DPC FOR PRIMARY COIL AS PER IS:13730 (RATE TO BE QUOTED AFTER DEDUCTING SCRAP VALUE AS 50% OF THE RATE OF NEW WIRE)
COMPLETE REWINDING LV WINDING OF ALL 3 PHASE , WITH COPPER DPC COVERED WIRE STRIP 99.98% ELECTROLYTIC COPPER CONDUCTOR DPC FOR SECONDARY COIL AS PER IS:13730 (RATE TO BE QUOTED AFTER DEDUCTING SCRAP VALUE AS 50% OF THE RATE OF NEW WIRE)
REPLACEMENT OF ALL INSULATION I.E., MICA, PAPER, SLEEVES, VARNISH, BAKELITE, ETC.
DEHYDRATION OF COMPLETE UNIT IN OVEN
INSIDE AND OUTSIDE PAINTING
TESTING AS PER IS:2026
LABOUR CHARGES
Rewinding/repairing of 01 No. 250kVA, 3.3kV/440V Transformer at Regional Workshop, Chandametta.
COMPLETE REWINDING LV WINDING OF ALL 3 PHASE , WITH COPPER DPC COVERED WIRE STRIP 99.98% ELECTROLYTIC COPPER CONDUCTOR DPC FOR PRIMARY COIL AS PER IS:13730 (RATE TO BE QUOTED AFTER DEDUCTING SCRAP VALUE AS 69.77% OF THE RATE OF NEW WIRE)
COMPLETE REWINDING HV WINDING OF ALL 3 PHASE , WITH COPPER DPC COVERED WIRE STRIP 99.98% ELECTROLYTIC COPPER CONDUCTOR DPC FOR SECONDARY COIL AS PER IS:13730 (RATE TO BE QUOTED AFTER DEDUCTING SCRAP VALUE AS 69.77% OF THE RATE OF NEW WIRE)
REPLACEMENT OF ALL INSULATING MATERIAL I.E. PRESS BOARD, COTTON TAPE, VARNISH, ETC.
OIL FILTRATION CHARGE
TESTING AS PER IS:2026
DEHYDRATION OF COMPLETE UNIT IN OVEN WITH VARNISHING
REPLACEMENT OF GASKET
LABOUR CHARGES
Rewinding/repairing of 02 Nos. 250kVA, 3.3kV/440V Transformers at Regional Workshop, Chandametta.
COMPLETE REWINDING LV WINDING OF ALL 3 PHASE , WITH COPPER DPC COVERED WIRE STRIP 99.98% ELECTROLYTIC COPPER CONDUCTOR DPC FOR PRIMARY COIL AS PER IS:13730 (RATE TO BE QUOTED AFTER DEDUCTING SCRAP VALUE AS 69.77% OF THE RATE OF NEW WIRE)
COMPLETE REWINDING HV WINDING OF ALL 3 PHASE , WITH COPPER DPC COVERED WIRE STRIP 99.98% ELECTROLYTIC COPPER CONDUCTOR DPC FOR SECONDARY COIL AS PER IS:13730 (RATE TO BE QUOTED AFTER DEDUCTING SCRAP VALUE AS 69.77% OF THE RATE OF NEW WIRE)
REPLACEMENT OF ALL INSULATING MATERIAL I.E. PRESS BOARD, COTTON TAPE, VARNISH, ETC.
OIL FILTRATION CHARGE
NEW NUTS & BOLTS
TESTING AS PER IS:2026
DEHYDRATION OF COMPLETE UNIT IN OVEN WITH VARNISHING
REPLACEMENT OF TAP CHANGER
REPLACEMENT OF GASKET
LABOUR CHARGES
Rewinding/repairing of 01 No. 500kVA, 3.3kV/440V Transformer at Regional Workshop, Chandametta.
COMPLETE REWINDING LV WINDING OF 2 PHASES , WITH COPPER DPC COVERED WIRE STRIP 99.98% ELECTROLYTIC COPPER CONDUCTOR DPC FOR PRIMARY COIL AS PER IS:13730 (RATE TO BE QUOTED AFTER DEDUCTING SCRAP VALUE AS 69.77% OF THE RATE OF NEW WIRE)
COMPLETE REWINDING HV WINDING OF 2 PHASES , WITH COPPER DPC COVERED WIRE STRIP 99.98% ELECTROLYTIC COPPER CONDUCTOR DPC FOR SECONDARY COIL AS PER IS:13730 (RATE TO BE QUOTED AFTER DEDUCTING SCRAP VALUE AS 69.77% OF THE RATE OF NEW WIRE)
REPLACEMENT OF ALL INSULATING MATERIAL I.E. PRESS BOARD, COTTON TAPE, VARNISH, ETC.
INSIDE AND OUTSIDE PAINTING
OIL FILTRATION CHARGE
NEW NUTS & BOLTS
TESTING AS PER IS:2026
DEHYDRATION OF COMPLETE UNIT IN OVEN WITH VARNISHING
REPLACEMENT OF LV BUSHING WITH STUD
LABOUR CHARGES
GST as applicable should be quoted in percentage, it will be calculated on total amount of Sl. No. 1.01 to 4.10
mahir electricals
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .