Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Ref. No.
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Qualified | Qualified |
| 2 | Qualified 101 PART III G I D C ESTATE SECTOR 28 GANDHI NAGAR 382028 GUJARAT INDIA | GANDHINAGAR | GANDHINAGAR | GUJARAT | 382028 | Qualified |
| 3 | Qualified 12 LANDT HOUSE SHIVAJI NAGAR NORTH AMBAZARI ROAD NAGPUR MAHARASHTRA 440010 | NAGPUR | NAGPUR | MAHARASHTRA | 440010 | Qualified |
| 4 | Qualified 1ST FLOOR MAYUR APPARTMENTS 3A LOUDON STREET LOUDON STREET KOLKATA WEST BENGAL 700017 | KOLKATA | WEST BENGAL | 700017 | Qualified |
| 5 | Qualified 46 LAMBERT IT PARK HARIHAR NAGAR BESA NAGPUR 440034 | NAGPUR | NAGPUR | MAHARASHTRA | 440034 | Qualified |
Tender Value
Refer Docs
EMD Value
₹2.9 Cr
Closing Date
13 Sept 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Ram Lal
Power Grid Corporation of India Limited -Saudamini, 3rd Floor, Plot No 2, Sector-29 Gurugram (Haryana) - 122001
Tower Package TW01 for Indian Portion of New Butwal-Gorakhpur 400kV D/C (Quad Moose) line including supply of composite insulator, earthwire, OPGW, hardware & associated accessories, pile foundation and tower testing. (approx. 94 km) for Cross border Interconnection under Consultancy Services to Joint venture of POWERGRID & Nepal Electricity Authority
5002002333/CONSULTANCY GIVEN/DOM/A04-CC CS -5
Open
Power/Energy Projects/Products
Works
Uttar Pradesh
₹25,000
₹2.9 Cr
15 Sept 2022
8 Jul 2022
15 Sept 2022
8 Jul 2022
13 Sept 2022
8 Jul 2022
18 Jul 2022
Package Name Tower Package TW01 for Indian Portion of New Butwal-Gorakhpur 400kV D/C (Quad Moose) line including supply of composite insulator, earthwire, OPGW, hardware & associated accessories, pile foundation and tower testing. (approx. 94 km) for Cross border Interconnection under Consultancy Services to Joint venture of POWERGRID & Nepal Electricity Authority
Package Code Tower Package TW01
Specification No. Specification No.: 5002002333/CONSULTANCY GIVEN/DOM/A04-CC CS -5
Specification No.: 5002002333/CONSULTANCY GIVEN/DOM/A04-CC CS -5
1 Fill up only green shaded cells in Sch-1, Sch-2, Sch-3, Sch-4, Sch-7 and Bid Form 2nd Envelope.
2 All the cells in Sch-5 & Sch-6 are auto filled, therefore no cell is required to be filled up there.
3 Instructions / error messages, if any, will be displayed automatically after selecting the cell.
4 After filling up all the schedues, save the file, take print out of all the schedules and Bid form and sign & stamp and submit them as hard copy of the 2nd envelope (Price part) of the bid. Also ensure to submit the soft copy of the the same file on CD/ DVD.
पावर ग्रिड कारपोरेशन ऑफ इण्डिया लिमिटेड
(भारत सरकार का उद्यम)
Power Grid Corporation of India Limited
(A Government of India Enterprises)
I While filling up the worksheets following may please be observed :
(i) Fill up only green shaded cells.
(ii) Certain data type entries have been restricted, such as Numeric values or limits of numeric values.
(iii) Select only the options provided in pull down menus.
(iv) Do not link any cell of this work book with any other work book.
(v) Do not use copy & paste or cut & paste options for filling up the data.
(vi) Do not reformat any of the cell of the work book.
II This Workbook consists of following worksheets :
Opening page of the workbook.
Names of Bidder :
● Select Sole Bidder or JV (Joint Venture) from the pull down menu. Do not leave this cell blank.
● Select nos. of the JV Partners other than the Lead Partner from drop down menu.
● In case of JV partners more than 2, enter details of 3rd & more partners along with details of 2nd partner.
● Fill up names and address of the Sole Bidder and /or Joint Venture.
● Fill up date in dd-mmm-yyyy format from drop down menu.
● Click for Sch-1 given at the right top of the worksheet to go to Sch-1.
Sch-1 (Ex-works Prices) :
● Fill up unit rates for all the items in numeric values greater than 0 (zero). If unit rate is left blank, the corresponding item shall be deemed to be included in the total price.
● Corresponding cell for mode of transaction shall be come enable only after filling up the unit rate, therefore first fill up the unit rate and then mode of transaction for the corresponding item.
● Select either Direct or Bought-out from the drop down menu. Do not leave the cell blank the same shall be deemed to be Bought-out if the cell is left blank.
● Total amount shall get calculated automatically.
● Type Test charges shall appear automatically after filling up Sch-7 appropriately.
Sch-2 (Freight & Insurance Charges) :
● Fill up unit rates for all the items in numeric values greater than 0 (zero). If unit rate is left blank, the corresponding item shall be deemed to be included in the total price.
● Total amount shall get calculated automatically.
Sch-3 (Erection Charges) :
● Fill up unit rates for all the items in numeric values greater than 0 (zero). If unit rate is left blank, the corresponding item shall be deemed to be included in the total price.
● Total amount shall get calculated automatically.
Sch-4 (Training Charges) :
● Not applicable, hence no cell is required to be filled up.
Sch-4b (Maintenance Charges during and after Defect Liability Period) :
● Not applicable, hence no cell is required to be filled up.
Sch-5 (Summary of Taxes and Duties applicable on the Goods) :
● No cell is required to be filled in by the bidder in this worksheet.
● Summary of all the Schedules without considering discount (mentioned in the work sheet discount) shall be displayed automatically.
● No cell is required to be filled in by the bidder in this worksheet.
Sch-7 (Type Test Charges) :
● Not applicable, hence no cell is required to be filled up.
Bid from 2nd Envelope :
● Fill up ref. no. as bidder's ref no. of this letter.
● This letter shall consider the net price as per Sch-6 (After Discount).
● Fill up names & Designation of the representatives of other JV partner(s) if the bidder is JV (Joint Venture) .
● Fill up additional information as required.
Happy Bidding !
Tower Package TW01 for Indian Portion of New Butwal-Gorakhpur 400kV D/C (Quad Moose) line including supply of composite insulator, earthwire, OPGW, hardware & associated accessories, pile foundation and tower testing. (approx. 94 km) for Cross border Interconnection under Consultancy Services to Joint venture of POWERGRID & Nepal Electricity Authority
Specification No.: 5002002333/CONSULTANCY GIVEN/DOM/A04-CC CS -5 Sole Bidder 1 Sole Bidder 1
Joint Venture 2 or More JV (Joint Venture) 2 or More
Enter following details of the bidder
Specify type of Bidder [Select from drop down menu] Sole Bidder Sole Bidder 1 0 Sole Bidder 1 0
Name of Sole Bidder …….. …….. …….. …….. …….. ……..
Address of Sole Bidder …….. …….. …….. …….. …….. ……..
Name of other Partner - 1
Address of other Partner - 1
Name of other Partner - 2 (more, if any) …….. …….. …….. …….. …….. ……..
Address of other Partner - 2 (more, if any) …….. …….. …….. …….. …….. ……..
email ID of Bid Signatory
Mobile No. of Bid Signatory
Tel No. of Bid Signatory
Fax No. of Bid Signatory
Specification No.: 5002002333/CONSULTANCY GIVEN/DOM/A04-CC CS -5 Schedule - 1 Direct Total 0 Sole Bidder `
BO Total #REF! 0
Tower Package TW01 for Indian Portion of New Butwal-Gorakhpur 400kV D/C (Quad Moose) line including supply of composite insulator, earthwire, OPGW, hardware & associated accessories, pile foundation and tower testing. (approx. 94 km) for Cross border Interconnection under Consultancy Services to Joint venture of POWERGRID & Nepal Electricity Authority
(SCHEDULE OF RATES AND PRICES)
Bidder’s Name and Address (Sole Bidder) : To:
Contracts Services, 3rd Floor
Name : …….. …….. …….. …….. …….. …….. Power Grid Corporation of India Ltd.,
Address : …….. …….. …….. …….. …….. …….. "Saudamini", Plot No.-2
PLANT AND EQUIPMENT (INCLUDING MANDATORY SPARES PARTS) TO BE SUPPLIED, INCLUDING TYPE TEST CHARGES FOR TESTS TO BE CONDUCTED Direct
All Prices are in Indian Rupees. Bought-Out
SI. No. PR No PR Line Item No Activity Description Material Code HSN Code Whether HSN in column ‘ 6 ’ is confirmed. If not indicate applicable the HSN code * Rate of GST applicable ( in %) Whether rate of GST in column ‘4’ is confirmed. If not indicate applicable rate of GST * Item Description Unit Qty. Unit Ex-works price (excluding GST) Total Ex-works price (excluding GST) GST Tax as confirmed by Bidder
PART A (Substation Portion)
I 400 kC D/c Quad Moose Transmission Line Revaluation of J column Tax Calculation
1 7000018852 10 Fabrication & Supply 1000013391 73082011 18 Fabrication, galvanising & supply of various types of towers & towerparts, tower/leg extensions (complete) excluding step bolt, stubs andbolts & nuts but including hangers, D-Shackles, pack washers etc.-HTSteel for Normal Towers MT 4646 Included 0.00 0 0.00
2 7000018852 20 Fabrication & Supply 1000015274 73082011 18 Fabrication, galvanising & supply of various types of towers & towerparts, tower/leg extensions (complete) excluding step bolt, stubs andbolts & nuts but including hangers, D-Shackles, pack washers etc.-MSSteel for Normal Towers MT 1572 Included 0.00 0 0.00
3 7000018852 30 Fabrication & Supply 1000013472 73181500 18 Supply of Hexagonal Bolts & Nuts for towers including Step Bolts, SpringWashers etc. MT 243 Included 0.00 0 0.00
4 7000018852 40 Fabrication & Supply 1000013393 73082011 18 Fabrication, galvanising & supply of stubs with cleats for varioustypes of towers and tower extensions(complete) with packwashers excluding supply of bolts & nuts-HT Steel for Normal Towers MT 263 Included 0.00 0 0.00
5 7000018852 50 Fabrication & Supply 1000007847 73181500 18 Supply of Bolts & Nuts for Stubs including Spring Washers etc. MT 6 Included 0.00 0 0.00
6 7000018852 60 Fabrication & Supply 1000013391 73082011 18 Fabrication, galvanising & supply of various types of towers & towerparts, tower/leg extensions (complete) excluding step bolt, stubs andbolts & nuts but including hangers, D-Shackles, pack washers etc.-HTSteel for Normal Towers MT 47 Included 0.00 0 0.00
7 7000018852 70 Fabrication & Supply 1000015274 73082011 18 Fabrication, galvanising & supply of various types of towers & towerparts, tower/leg extensions (complete) excluding step bolt, stubs andbolts & nuts but including hangers, D-Shackles, pack washers etc.-MSSteel for Normal Towers MT 16 Included 0.00 0 0.00
8 7000018852 80 Fabrication & Supply 1000013472 73181500 18 Supply of Hexagonal Bolts & Nuts for towers including Step Bolts, SpringWashers etc. MT 3 Included 0.00 0 0.00
9 7000018852 90 Fabrication & Supply 1000013393 73082011 18 Fabrication, galvanising & supply of stubs with cleats for varioustypes of towers and tower extensions(complete) with packwashers excluding supply of bolts & nuts-HT Steel for Normal Towers MT 3 Included 0.00 0 0.00
10 7000018852 100 Earthing of Towers 1000017587 73082011 18 Supply of Pipe Type Earthing EA 237 Included 0.00 0 0.00
11 7000018852 110 Earthing of Towers 1000010003 73082011 18 Supply of Counterpoise type (120 m length) EA 5 Included 0.00 0 0.00
12 7000018852 120 Earthing of Towers 1000010005 73082011 18 Counterpoise type (280 m length) EA 3 Included 0.00 0 0.00
13 7000018852 130 Earthing of Towers 1000038340 73082011 18 ROD TYPE EARTHING EA 237 Included 0.00 0 0.00
14 7000018852 140 Earthing of Towers 1000019718 73082011 18 Supply of Shieldwire Earthing includingPG clamps, downlead clamps butexcluding Earthwire bits for Pipe typeearthing EA 13 Included 0.00 0 0.00
15 7000018852 150 Earthing of Towers 1000034135 73082011 18 EARTHING OF PILE FOUNDATION LOCATIONS MT 1.5 Included 0.00 0 0.00
16 7000018852 160 Earthing of Towers 1000057380 73082011 18 Supply of Shieldwire Earthing Counterpoise (4X30M) Type including PGclamps, downlead clamps but excluding Earthwire bits. EA 1 Included 0.00 0 0.00
17 7000018852 170 Supply of Tower Accessories 1000010539 73082011 18 Danger Plate for 400kV EA 248 Included 0.00 0 0.00
18 7000018852 180 Supply of Tower Accessories 1000015971 73082011 18 Number Plate for 400kV EA 248 Included 0.00 0 0.00
19 7000018852 190 Supply of Tower Accessories 1000017508 73082011 18 Phase Plate (Set of three) SET 496 Included 0.00 0 0.00
20 7000018852 200 Supply of Tower Accessories 1000009119 73082011 18 Circuit Plate (Set of two) SET 248 Included 0.00 0 0.00
21 7000018852 210 Supply of Tower Accessories 1000006779 73082011 18 Supply of Anti-Climbing Devices ofBarbed Wire Type SET 248 Included 0.00 0 0.00
22 7000018852 220 Supply of Tower Accessories 1000007735 73082011 18 Bird Guard (Set of Three) SET 332 Included 0.00 0 0.00
23 7000018852 230 Conductor & Earthwire Accessories 1000015503 76169990 18 Mid Span Compression Joint for Conductor-ACSR Moose EA 1194 Included 0.00 0 0.00
24 7000018852 240 Conductor & Earthwire Accessories 1000015505 73082011 18 Mid Span Compression Joint -7/3.66mm Earth Wire EA 52 Included 0.00 0 0.00
25 7000018852 250 Conductor & Earthwire Accessories 1000018443 76169990 18 Repair Sleeve for Conductor-ACSR Moose EA 398 Included 0.00 0 0.00
26 7000018852 260 Conductor & Earthwire Accessories 1000028485 76169990 18 FLEXIBLE AL BOND-7/3.66MM E/W EA 330 Included 0.00 0 0.00
27 7000018852 270 Conductor & Earthwire Accessories 1000022420 73082011 18 Vibration damper -7/3.66mm Earth Wire EA 660 Included 0.00 0 0.00
28 7000018852 280 Conductor & Earthwire Accessories 1000045881 76169990 18 PREFORMED RETAINING ROD TYPE SPACER DAMPER SUITABLE FOR QUAD ACSRMOOSE CONDUCTOR EA 10416 Included 0.00 0 0.00
29 7000018852 290 Conductor & Earthwire Accessories 1000027475 76169990 18 Rigid Spacer for Jumper-Quad ACSR Moose EA 1968 Included 0.00 0 0.00
30 7000018852 300 Conductor & Earthwire Accessories 1000020991 73082011 18 Tension clamp assembly-7/3.66mm Earth Wire EA 164 Included 0.00 0 0.00
31 7000018852 310 Conductor & Earthwire Accessories 1000020447 73082011 18 Suspension clamp assembly -7/3.66mm Earth Wire EA 166 Included 0.00 0 0.00
32 7000018852 320 Conductor & Earthwire Accessories 1000015503 76169990 18 Mid Span Compression Joint for Conductor-ACSR Moose EA 24 Included 0.00 0 0.00
33 7000018852 330 Conductor & Earthwire Accessories 1000015505 73082011 18 Mid Span Compression Joint -7/3.66mm Earth Wire EA 2 Included 0.00 0 0.00
34 7000018852 340 Conductor & Earthwire Accessories 1000018443 76169990 18 Repair Sleeve for Conductor-ACSR Moose EA 8 Included 0.00 0 0.00
35 7000018852 350 Conductor & Earthwire Accessories 1000028485 76169990 18 FLEXIBLE AL BOND-7/3.66MM E/W EA 7 Included 0.00 0 0.00
36 7000018852 360 Conductor & Earthwire Accessories 1000022420 73082011 18 Vibration damper -7/3.66mm Earth Wire EA 14 Included 0.00 0 0.00
37 7000018852 370 Conductor & Earthwire Accessories 1000045881 76169990 18 PREFORMED RETAINING ROD TYPE SPACER DAMPER SUITABLE FOR QUAD ACSRMOOSE CONDUCTOR EA 209 Included 0.00 0 0.00
38 7000018852 380 Conductor & Earthwire Accessories 1000027475 76169990 18 Rigid Spacer for Jumper-Quad ACSR Moose EA 40 Included 0.00 0 0.00
39 7000018852 390 Conductor & Earthwire Accessories 1000020447 73082011 18 Suspension clamp assembly -7/3.66mm Earth Wire EA 4 Included 0.00 0 0.00
40 7000018852 400 Conductor & Earthwire Accessories 1000020991 73082011 18 Tension clamp assembly-7/3.66mm Earth Wire EA 4 Included 0.00 0 0.00
41 7000018852 480 Earthwire 1000030841 73121020 18 7/3.66 G.S. EARTHWIRE KM 95 Included 0.00 0 0.00
42 7000018852 490 Hardware Fittings 1000010774 73082011 18 Hardware Fittings for 400kV AC with Quad ACSR Moose Conductor-Double ISuspension String SET 996 Included 0.00 0 0.00
43 7000018852 500 Hardware Fittings 1000019786 73082011 18 Hardware Fittings for 400kV AC with Quad ACSR Moose Conductor-Single ISuspension String (Pilot) SET 300 Included 0.00 0 0.00
44 7000018852 510 Hardware Fittings 1000017983 73082011 18 Hardware Fittings for 400kV AC with Quad ACSR Moose Conductor-QuadTension String SET 996 Included 0.00 0 0.00
45 7000018852 520 Hardware Fittings 1000010774 73082011 18 Hardware Fittings for 400kV AC with Quad ACSR Moose Conductor-Double ISuspension String SET 20 Included 0.00 0 0.00
46 7000018852 530 Hardware Fittings 1000019786 73082011 18 Hardware Fittings for 400kV AC with Quad ACSR Moose Conductor-Single ISuspension String (Pilot) SET 6 Included 0.00 0 0.00
47 7000018852 540 Hardware Fittings 1000017983 73082011 18 Hardware Fittings for 400kV AC with Quad ACSR Moose Conductor-QuadTension String SET 20 Included 0.00 0 0.00
48 7000018852 560 Supply of Aviation Light 1000019903 73082011 18 Supply of Span Marker for Aviation EA 10 Included 0.00 0 0.00
49 7000018852 570 Supply of Aviation Light 1000016663 85391000 18 Supply of Obstruction Lights (as per IS5613)-1 Medium Intensity + 2 LowIntensity SET 1 Included 0.00 0 0.00
50 7000018852 580 Supply of Aviation Light 1000016664 85391000 18 Supply of Obstruction Lights (as per IS5613)-1 Medium Intensity + 4 LowIntensity SET 1 Included 0.00 0 0.00
51 7000018852 640 OPGW 1000030940 85447090 18 24 FIBRE (DWSM) OPGW FIBRE OPTIC CABLE KM 98.622 Included 0.00 0 0.00
52 7000018852 650 OPGW 1000020444 82057000 18 Suspension clamp assembly for 24 fibre OPGW EA 161 Included 0.00 0 0.00
53 7000018852 660 OPGW 1000033144 82057000 18 TENSION ASSEMBLY - DEAD END FOR 24 FIBER OPGW SET 1 Included 0.00 0 0.00
54 7000018852 670 OPGW 1000031039 82057000 18 TENSION FITTINGS ASSEMBLY FOR 24F OPGW INCLUDING ALL ACCESSORIES FORJOINT BOX (SPLICING) LOCATION SET 15 Included 0.00 0 0.00
55 7000018852 680 OPGW 1000033146 82057000 18 TENSION ASSEMBLY - DOUBLE TENSION PASS THROUGH ASSEMBLY FOR 24 FIBEROPGW SET 67 Included 0.00 0 0.00
56 7000018852 690 OPGW 1000031041 82057000 18 TENSION FITTINGS ASSEMBLY ON SUSPENSION TOWER FOR 24F OPGW INCLUDINGALL ACCESSORIES AT JOINT BOX (SPLICING) LOCATION SET 5 Included 0.00 0 0.00
57 7000018852 700 OPGW 1000022417 82057000 18 Vibration Damper for 24 fibre OPGW EA 672 Included 0.00 0 0.00
58 7000018852 710 OPGW 1000010817 82057000 18 Down Lead clamp Assembly for 24 fibre OPGW EA 630 Included 0.00 0 0.00
59 7000018852 720 OPGW 1000014198 85353090 18 Joint Box for 24 fibre OPGW EA 21 Included 0.00 0 0.00
60 7000018852 730 OPGW 1000023471 85372000 18 OPGW Fibre Optic Distribution Panel (FODP): Indoor Type: 96F EA 1 Included 0.00 0 0.00
61 7000018852 740 OPGW 1000030942 85447090 18 24F (DWSM) APPROACH FIBRE OPTIC CABLE INCLUDING ALL INSTALLATIONHARDWARE SET KM 1 Included 0.00 0 0.00
62 7000018852 750 Mandatory Spares of OPGW 1000030940 85447090 18 24 FIBRE (DWSM) OPGW FIBRE OPTIC CABLE KM 3.452 Included 0.00 0 0.00
63 7000018852 760 Mandatory Spares of OPGW 1000020444 82057000 18 Suspension clamp assembly for 24 fibre OPGW EA 6 Included 0.00 0 0.00
64 7000018852 770 Mandatory Spares of OPGW 1000033144 82057000 18 TENSION ASSEMBLY - DEAD END FOR 24 FIBER OPGW SET 1 Included 0.00 0 0.00
65 7000018852 780 Mandatory Spares of OPGW 1000031039 82057000 18 TENSION FITTINGS ASSEMBLY FOR 24F OPGW INCLUDING ALL ACCESSORIES FORJOINT BOX (SPLICING) LOCATION SET 1 Included 0.00 0 0.00
66 7000018852 790 Mandatory Spares of OPGW 1000033146 82057000 18 TENSION ASSEMBLY - DOUBLE TENSION PASS THROUGH ASSEMBLY FOR 24 FIBEROPGW SET 3 Included 0.00 0 0.00
67 7000018852 800 Mandatory Spares of OPGW 1000031041 82057000 18 TENSION FITTINGS ASSEMBLY ON SUSPENSION TOWER FOR 24F OPGW INCLUDINGALL ACCESSORIES AT JOINT BOX (SPLICING) LOCATION SET 1 Included 0.00 0 0.00
68 7000018852 810 Mandatory Spares of OPGW 1000022417 82057000 18 Vibration Damper for 24 fibre OPGW EA 24 Included 0.00 0 0.00
69 7000018852 820 Mandatory Spares of OPGW 1000010817 82057000 18 Down Lead clamp Assembly for 24 fibre OPGW EA 23 Included 0.00 0 0.00
70 7000018852 830 Mandatory Spares of OPGW 1000014198 85353090 18 Joint Box for 24 fibre OPGW EA 1 Included 0.00 0 0.00
71 7000018852 840 Mandatory Spares of OPGW 1000030942 85447090 18 24F (DWSM) APPROACH FIBRE OPTIC CABLE INCLUDING ALL INSTALLATIONHARDWARE SET KM 0.5 Included 0.00 0 0.00
72 7000018852 870 Insulator 1000009325 85469090 18 Composite long rod Insulators for 400kV Transmission Line-120 KN(Length-3335 mm, Creepage-13020 mm) EA 2292 Included 0.00 0 0.00
73 7000018852 880 Insulator 1000009328 85469090 18 Composite long rod Insulators for 400kV Transmission Line-160 KN(Length-3910 mm, Creepage-13020 mm) EA 3984 Included 0.00 0 0.00
74 7000018852 890 Insulator 1000009325 85469090 18 Composite long rod Insulators for 400kV Transmission Line-120 KN(Length-3335 mm, Creepage-13020 mm) EA 229 Included 0.00 0 0.00
75 7000018852 900 Insulator 1000009328 85469090 18 Composite long rod Insulators for 400kV Transmission Line-160 KN(Length-3910 mm, Creepage-13020 mm) EA 398 Included 0.00 0 0.00
Total Ex-works Price 0.00 0.00
Total Type Test charges as per Schedule-7 0.00
Total Ex-works Price including Type Test charges 0.00
Total GST Tax as confirmed by Bidder 0.00
Note : Specify amount of GST on the transaction between the Contractor and the Employer.
* In case the bidder leaves the cell for confirmation of the HSN code and/or GST rate “blank”, the HSN code and corresponding GST rate indicated by the Employer shall be deemed to be the one confirmed by the Bidder.
Place : Printed Name :
Specification No.: 5002002333/CONSULTANCY GIVEN/DOM/A04-CC CS -5 Schedule - 1 Direct Total 0 Sole Bidder `
BO Total #REF! 0
Tower Package TW01 for Indian Portion of New Butwal-Gorakhpur 400kV D/C (Quad Moose) line including supply of composite insulator, earthwire, OPGW, hardware & associated accessories, pile foundation and tower testing. (approx. 94 km) for Cross border Interconnection under Consultancy Services to Joint venture of POWERGRID & Nepal Electricity Authority
(SCHEDULE OF RATES AND PRICES : EX-WORKS PRICES)
Bidder’s Name and Address (Sole Bidder) : To:
Contract Services
Name : …….. …….. …….. …….. …….. …….. Power Grid Corporation of India Ltd.,
Address : …….. …….. …….. …….. …….. …….. "Saudamini", Plot No.-2
Plant and Equipment (including Mandatory Spares Parts) to be supplied, including Type Test Charges for Tests to be conducted. Direct
All Prices are in Indian Rupees. Bought-Out
SI. No. Item Description Unit Qty. Unit Ex-works price Total Ex-works price Mode of Transaction (Direct / Bought-out)
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
Total Ex-Works Price Direct 0.00 Direct
Total Ex-Works Price Bought Out 0.00
Total Ex-Works Price 0.00
Total Type Test charges as per Schedule-7 #REF! #REF! #REF!
Total Ex-works Price including Type Test charges #REF! #REF! #REF!
Discount Sch-1 #REF! MPD Sch-1 #REF!
Dis Alert #REF!
Note : Specify amount of Excise Duty, Sales Tax/'VAT and other taxes payable on the transaction between the Contractor and the Employer and octroi/entry tax as applicable for destination site/state on all items of supply including bought-out finished items (to be identified in the Contract), which shall be dispatched directly from the sub-vendor’s works to the Employer’s site (sale-in-transit), separately in Schedule-5. Excise Duty, Sales tax and other levies for all the bought-out items are to be included in the EXW Price (Col. No. 5) only and not to be indicated in Schedule-5.
Place : Printed Name :
Specification No.: 5002002333/CONSULTANCY GIVEN/DOM/A04-CC CS -5 Schedule - 2
Tower Package TW01 for Indian Portion of New Butwal-Gorakhpur 400kV D/C (Quad Moose) line including supply of composite insulator, earthwire, OPGW, hardware & associated accessories, pile foundation and tower testing. (approx. 94 km) for Cross border Interconnection under Consultancy Services to Joint venture of POWERGRID & Nepal Electricity Authority
(SCHEDULE OF RATES AND PRICES)
Bidder’s Name and Address (Sole Bidder) : To:
Contracts Services, 3rd Floor
Name : …….. …….. …….. …….. …….. …….. Power Grid Corporation of India Ltd.,
Address : …….. …….. …….. …….. …….. …….. "Saudamini", Plot No.-2
LOCAL TRANSPORTATION, IN-TRANSIT INSURANCE, LOADING AND UNLOADING
All Prices are in Indian Rupees.
SI. No. PR No PR Line Item No Activity Description Material Code Description Unit Quantity Unit Freight, In-transit Insurance, loading & unloading Charges Total Freight, In-transit Insurance, loading & unloading Charges
PART A (Substation Portion)
I 400 kC D/c Quad Moose Transmission Line
1 7000018852 10 Fabrication & Supply 1000013391 Fabrication, galvanising & supply of various types of towers & towerparts, tower/leg extensions (complete) excluding step bolt, stubs andbolts & nuts but including hangers, D-Shackles, pack washers etc.-HTSteel for Normal Towers MT 4646 Included
2 7000018852 20 Fabrication & Supply 1000015274 Fabrication, galvanising & supply of various types of towers & towerparts, tower/leg extensions (complete) excluding step bolt, stubs andbolts & nuts but including hangers, D-Shackles, pack washers etc.-MSSteel for Normal Towers MT 1572 Included
3 7000018852 30 Fabrication & Supply 1000013472 Supply of Hexagonal Bolts & Nuts for towers including Step Bolts, SpringWashers etc. MT 243 Included
4 7000018852 40 Fabrication & Supply 1000013393 Fabrication, galvanising & supply of stubs with cleats for varioustypes of towers and tower extensions(complete) with packwashers excluding supply of bolts & nuts-HT Steel for Normal Towers MT 263 Included
5 7000018852 50 Fabrication & Supply 1000007847 Supply of Bolts & Nuts for Stubs including Spring Washers etc. MT 6 Included
6 7000018852 60 Fabrication & Supply 1000013391 Fabrication, galvanising & supply of various types of towers & towerparts, tower/leg extensions (complete) excluding step bolt, stubs andbolts & nuts but including hangers, D-Shackles, pack washers etc.-HTSteel for Normal Towers MT 47 Included
7 7000018852 70 Fabrication & Supply 1000015274 Fabrication, galvanising & supply of various types of towers & towerparts, tower/leg extensions (complete) excluding step bolt, stubs andbolts & nuts but including hangers, D-Shackles, pack washers etc.-MSSteel for Normal Towers MT 16 Included
8 7000018852 80 Fabrication & Supply 1000013472 Supply of Hexagonal Bolts & Nuts for towers including Step Bolts, SpringWashers etc. MT 3 Included
9 7000018852 90 Fabrication & Supply 1000013393 Fabrication, galvanising & supply of stubs with cleats for varioustypes of towers and tower extensions(complete) with packwashers excluding supply of bolts & nuts-HT Steel for Normal Towers MT 3 Included
10 7000018852 100 Earthing of Towers 1000017587 Supply of Pipe Type Earthing EA 237 Included
11 7000018852 110 Earthing of Towers 1000010003 Supply of Counterpoise type (120 m length) EA 5 Included
12 7000018852 120 Earthing of Towers 1000010005 Counterpoise type (280 m length) EA 3 Included
13 7000018852 130 Earthing of Towers 1000038340 ROD TYPE EARTHING EA 237 Included
14 7000018852 140 Earthing of Towers 1000019718 Supply of Shieldwire Earthing includingPG clamps, downlead clamps butexcluding Earthwire bits for Pipe typeearthing EA 13 Included
15 7000018852 150 Earthing of Towers 1000034135 EARTHING OF PILE FOUNDATION LOCATIONS MT 1.5 Included
16 7000018852 160 Earthing of Towers 1000057380 Supply of Shieldwire Earthing Counterpoise (4X30M) Type including PGclamps, downlead clamps but excluding Earthwire bits. EA 1 Included
17 7000018852 170 Supply of Tower Accessories 1000010539 Danger Plate for 400kV EA 248 Included
18 7000018852 180 Supply of Tower Accessories 1000015971 Number Plate for 400kV EA 248 Included
19 7000018852 190 Supply of Tower Accessories 1000017508 Phase Plate (Set of three) SET 496 Included
20 7000018852 200 Supply of Tower Accessories 1000009119 Circuit Plate (Set of two) SET 248 Included
21 7000018852 210 Supply of Tower Accessories 1000006779 Supply of Anti-Climbing Devices ofBarbed Wire Type SET 248 Included
22 7000018852 220 Supply of Tower Accessories 1000007735 Bird Guard (Set of Three) SET 332 Included
23 7000018852 230 Conductor & Earthwire Accessories 1000015503 Mid Span Compression Joint for Conductor-ACSR Moose EA 1194 Included
24 7000018852 240 Conductor & Earthwire Accessories 1000015505 Mid Span Compression Joint -7/3.66mm Earth Wire EA 52 Included
25 7000018852 250 Conductor & Earthwire Accessories 1000018443 Repair Sleeve for Conductor-ACSR Moose EA 398 Included
26 7000018852 260 Conductor & Earthwire Accessories 1000028485 FLEXIBLE AL BOND-7/3.66MM E/W EA 330 Included
27 7000018852 270 Conductor & Earthwire Accessories 1000022420 Vibration damper -7/3.66mm Earth Wire EA 660 Included
28 7000018852 280 Conductor & Earthwire Accessories 1000045881 PREFORMED RETAINING ROD TYPE SPACER DAMPER SUITABLE FOR QUAD ACSRMOOSE CONDUCTOR EA 10416 Included
29 7000018852 290 Conductor & Earthwire Accessories 1000027475 Rigid Spacer for Jumper-Quad ACSR Moose EA 1968 Included
30 7000018852 300 Conductor & Earthwire Accessories 1000020991 Tension clamp assembly-7/3.66mm Earth Wire EA 164 Included
31 7000018852 310 Conductor & Earthwire Accessories 1000020447 Suspension clamp assembly -7/3.66mm Earth Wire EA 166 Included
32 7000018852 320 Conductor & Earthwire Accessories 1000015503 Mid Span Compression Joint for Conductor-ACSR Moose EA 24 Included
33 7000018852 330 Conductor & Earthwire Accessories 1000015505 Mid Span Compression Joint -7/3.66mm Earth Wire EA 2 Included
34 7000018852 340 Conductor & Earthwire Accessories 1000018443 Repair Sleeve for Conductor-ACSR Moose EA 8 Included
35 7000018852 350 Conductor & Earthwire Accessories 1000028485 FLEXIBLE AL BOND-7/3.66MM E/W EA 7 Included
36 7000018852 360 Conductor & Earthwire Accessories 1000022420 Vibration damper -7/3.66mm Earth Wire EA 14 Included
37 7000018852 370 Conductor & Earthwire Accessories 1000045881 PREFORMED RETAINING ROD TYPE SPACER DAMPER SUITABLE FOR QUAD ACSRMOOSE CONDUCTOR EA 209 Included
38 7000018852 380 Conductor & Earthwire Accessories 1000027475 Rigid Spacer for Jumper-Quad ACSR Moose EA 40 Included
39 7000018852 390 Conductor & Earthwire Accessories 1000020447 Suspension clamp assembly -7/3.66mm Earth Wire EA 4 Included
40 7000018852 400 Conductor & Earthwire Accessories 1000020991 Tension clamp assembly-7/3.66mm Earth Wire EA 4 Included
41 7000018852 480 Earthwire 1000030841 7/3.66 G.S. EARTHWIRE KM 95 Included
42 7000018852 490 Hardware Fittings 1000010774 Hardware Fittings for 400kV AC with Quad ACSR Moose Conductor-Double ISuspension String SET 996 Included
43 7000018852 500 Hardware Fittings 1000019786 Hardware Fittings for 400kV AC with Quad ACSR Moose Conductor-Single ISuspension String (Pilot) SET 300 Included
44 7000018852 510 Hardware Fittings 1000017983 Hardware Fittings for 400kV AC with Quad ACSR Moose Conductor-QuadTension String SET 996 Included
45 7000018852 520 Hardware Fittings 1000010774 Hardware Fittings for 400kV AC with Quad ACSR Moose Conductor-Double ISuspension String SET 20 Included
46 7000018852 530 Hardware Fittings 1000019786 Hardware Fittings for 400kV AC with Quad ACSR Moose Conductor-Single ISuspension String (Pilot) SET 6 Included
47 7000018852 540 Hardware Fittings 1000017983 Hardware Fittings for 400kV AC with Quad ACSR Moose Conductor-QuadTension String SET 20 Included
48 7000018852 560 Supply of Aviation Light 1000019903 Supply of Span Marker for Aviation EA 10 Included
49 7000018852 570 Supply of Aviation Light 1000016663 Supply of Obstruction Lights (as per IS5613)-1 Medium Intensity + 2 LowIntensity SET 1 Included
50 7000018852 580 Supply of Aviation Light 1000016664 Supply of Obstruction Lights (as per IS5613)-1 Medium Intensity + 4 LowIntensity SET 1 Included
51 7000018852 640 OPGW 1000030940 24 FIBRE (DWSM) OPGW FIBRE OPTIC CABLE KM 98.622 Included
52 7000018852 650 OPGW 1000020444 Suspension clamp assembly for 24 fibre OPGW EA 161 Included
53 7000018852 660 OPGW 1000033144 TENSION ASSEMBLY - DEAD END FOR 24 FIBER OPGW SET 1 Included
54 7000018852 670 OPGW 1000031039 TENSION FITTINGS ASSEMBLY FOR 24F OPGW INCLUDING ALL ACCESSORIES FORJOINT BOX (SPLICING) LOCATION SET 15 Included
55 7000018852 680 OPGW 1000033146 TENSION ASSEMBLY - DOUBLE TENSION PASS THROUGH ASSEMBLY FOR 24 FIBEROPGW SET 67 Included
56 7000018852 690 OPGW 1000031041 TENSION FITTINGS ASSEMBLY ON SUSPENSION TOWER FOR 24F OPGW INCLUDINGALL ACCESSORIES AT JOINT BOX (SPLICING) LOCATION SET 5 Included
57 7000018852 700 OPGW 1000022417 Vibration Damper for 24 fibre OPGW EA 672 Included
58 7000018852 710 OPGW 1000010817 Down Lead clamp Assembly for 24 fibre OPGW EA 630 Included
59 7000018852 720 OPGW 1000014198 Joint Box for 24 fibre OPGW EA 21 Included
60 7000018852 730 OPGW 1000023471 OPGW Fibre Optic Distribution Panel (FODP): Indoor Type: 96F EA 1 Included
61 7000018852 740 OPGW 1000030942 24F (DWSM) APPROACH FIBRE OPTIC CABLE INCLUDING ALL INSTALLATIONHARDWARE SET KM 1 Included
62 7000018852 750 Mandatory Spares of OPGW 1000030940 24 FIBRE (DWSM) OPGW FIBRE OPTIC CABLE KM 3.452 Included
63 7000018852 760 Mandatory Spares of OPGW 1000020444 Suspension clamp assembly for 24 fibre OPGW EA 6 Included
64 7000018852 770 Mandatory Spares of OPGW 1000033144 TENSION ASSEMBLY - DEAD END FOR 24 FIBER OPGW SET 1 Included
65 7000018852 780 Mandatory Spares of OPGW 1000031039 TENSION FITTINGS ASSEMBLY FOR 24F OPGW INCLUDING ALL ACCESSORIES FORJOINT BOX (SPLICING) LOCATION SET 1 Included
66 7000018852 790 Mandatory Spares of OPGW 1000033146 TENSION ASSEMBLY - DOUBLE TENSION PASS THROUGH ASSEMBLY FOR 24 FIBEROPGW SET 3 Included
67 7000018852 800 Mandatory Spares of OPGW 1000031041 TENSION FITTINGS ASSEMBLY ON SUSPENSION TOWER FOR 24F OPGW INCLUDINGALL ACCESSORIES AT JOINT BOX (SPLICING) LOCATION SET 1 Included
68 7000018852 810 Mandatory Spares of OPGW 1000022417 Vibration Damper for 24 fibre OPGW EA 24 Included
69 7000018852 820 Mandatory Spares of OPGW 1000010817 Down Lead clamp Assembly for 24 fibre OPGW EA 23 Included
70 7000018852 830 Mandatory Spares of OPGW 1000014198 Joint Box for 24 fibre OPGW EA 1 Included
71 7000018852 840 Mandatory Spares of OPGW 1000030942 24F (DWSM) APPROACH FIBRE OPTIC CABLE INCLUDING ALL INSTALLATIONHARDWARE SET KM 0.5 Included
72 7000018852 870 Insulator 1000009325 Composite long rod Insulators for 400kV Transmission Line-120 KN(Length-3335 mm, Creepage-13020 mm) EA 2292 Included
73 7000018852 880 Insulator 1000009328 Composite long rod Insulators for 400kV Transmission Line-160 KN(Length-3910 mm, Creepage-13020 mm) EA 3984 Included
74 7000018852 890 Insulator 1000009325 Composite long rod Insulators for 400kV Transmission Line-120 KN(Length-3335 mm, Creepage-13020 mm) EA 229 Included
75 7000018852 900 Insulator 1000009328 Composite long rod Insulators for 400kV Transmission Line-160 KN(Length-3910 mm, Creepage-13020 mm) EA 398 Included
Total F&I Price 0.00
Place: Printed Name :
Specification No.: 5002002333/CONSULTANCY GIVEN/DOM/A04-CC CS -5 Schedule - 2 Dis
Tower Package TW01 for Indian Portion of New Butwal-Gorakhpur 400kV D/C (Quad Moose) line including supply of composite insulator, earthwire, OPGW, hardware & associated accessories, pile foundation and tower testing. (approx. 94 km) for Cross border Interconnection under Consultancy Services to Joint venture of POWERGRID & Nepal Electricity Authority As per Lum-sum 0
(SCHEDULE OF RATES AND PRICES : FREIGHT & INSURANCE CHARGES) AS per Percent #REF!
As per lum-sum on Sch-2 0.00%
Bidder’s Name and Address (Sole Bidder) : To: As per Percent on Sch-2 #REF!
Contracts Services, 3rd Floor Total Discount #REF!
Name : …….. …….. …….. …….. …….. …….. Power Grid Corporation of India Ltd.,
Address : …….. …….. …….. …….. …….. …….. "Saudamini", Plot No.-2
…….. …….. …….. …….. …….. …….. Sector-29, Multipackage Discount 0.00%
All Prices are in Indian Rupees. Amount after Discount (Rs.) Dis Alert Amount after MPD (Rs.)
SI. No. Description Unit Quantity Unit Freight & Insurance Charges Total Freight & Insurance Charges Unit Freight & Insurance Charges Total Freight & Insurance Charges Unit Freight & Insurance Charges Total Freight & Insurance Charges
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
Total F&I Price #REF!
Place : Printed Name :
Specification No.: 5002002333/CONSULTANCY GIVEN/DOM/A04-CC CS -5 Schedule - 3
Tower Package TW01 for Indian Portion of New Butwal-Gorakhpur 400kV D/C (Quad Moose) line including supply of composite insulator, earthwire, OPGW, hardware & associated accessories, pile foundation and tower testing. (approx. 94 km) for Cross border Interconnection under Consultancy Services to Joint venture of POWERGRID & Nepal Electricity Authority As per Lum-sum 0.00%
(SCHEDULE OF RATES AND PRICES ) AS per Percent #REF!
As per lum-sum on Sch-3 0.00%
Bidder’s Name and Address (Sole Bidder) : To: As per Percent on Sch-3 #REF!
Contracts Services, 3rd Floor Total Discount #REF!
Name : …….. …….. …….. …….. …….. …….. Power Grid Corporation of India Ltd.,
Address : …….. …….. …….. …….. …….. …….. "Saudamini", Plot No.-2
…….. …….. …….. …….. …….. …….. Sector-29, Multipackage lum-sum 0.00%
INSTALLATION CHARGES Amount after Discount (Rs.) Dis Alert Amount after MPD (Rs.)
All Prices are in Indian Rupees.
SI. No. PR No PR Line Item No Activity Header PR Activity No Activity Description Service Code SAC (Service Accounting Codes) Whether SAC in column '8’ is confirmed. If not indicate applicable the SAC * Rate of GST applicable ( in %) Whether rate of GST in column ‘4’ is confirmed. If not indicate applicable rate of GST * Description Unit Quantity Unit Erection Charges Total Erection Charges Total GST as confirmed by Bidder Unit Erection Charges Total Erection Charges Unit Erection Charges Total Erection Charges
PART A (Substation Portion)
400 kC D/c Quad Moose Transmission Line Revaluation of J column Tax Calculation
1 7000018852 410 60 10 Survey 100001243 998344 18 Check survey KM 94 Included 0.00 0 0
2 7000018852 410 60 20 Survey 100001242 998344 18 Detailed survey including route alignment, profiling and tower spotting KM 94 Included 0.00 0 0
3 7000018852 420 70 10 Soil Investigation 100001244 998342 18 Detailed soil investigation: All kinds of soils except fissured rock and hard rock EA 25 Included 0.00 0 0
4 7000018852 420 70 20 Soil Investigation 100001245 998342 18 Detailed soil investigation: Fissured Rock EA 3 Included 0.00 0 0
5 7000018852 420 70 30 Soil Investigation 100001247 998342 18 Detailed soil investigation- River Crossing Location EA 3 Included 0.00 0 0
6 7000018852 430 90 10 Work Associated with Tower Foundations 100001255 995433 18 Excavation : Dry Soil M3 39663 Included 0.00 0 0
7 7000018852 430 90 20 Work Associated with Tower Foundations 100001256 995433 18 Excavation: Wet Soil M3 66134 Included 0.00 0 0
8 7000018852 430 90 30 Work Associated with Tower Foundations 100001260 995454 18 Concreting (including all associated works related to foundation not covered in excavation and reinforcemt steel works : concreting(1:1.5:3) M3 11125 Included 0.00 0 0
9 7000018852 430 90 40 Work Associated with Tower Foundations 100001261 995454 18 Concreting (including all associated works related to foundation not covered in excavation and reinforcemt steel works : LeanConcrete (1:3:6) M3 1308 Included 0.00 0 0
10 7000018852 430 90 50 Work Associated with Tower Foundations 100001262 995454 18 Reinforcement Steel : Supply and placement MT 1091 Included 0.00 0 0
11 7000018852 430 90 60 Work Associated with Tower Foundations 100001263 995455 18 Installation of stub including bolts and nuts : For Normal Towers MT 269 Included 0.00 0 0
12 7000018852 440 100 10 Erection 100001248 995455 18 Erection of various types of towers, tower extensions (complete), bolts & nuts, hangers, d-shackles, step bolts, pack washers etc.including tack welding & supply & application of zinc rich paint : Normal towers MT 6461 Included 0.00 0 0
13 7000018852 450 110 10 Installation of earthing of towers 100001269 995468 18 Installation of earthing of towers: Pipe Type EA 237 Included 0.00 0 0
14 7000018852 450 110 20 Installation of earthing of towers 100004928 998731 18 ROD TYPE EARTHING EA 237 Included 0.00 0 0
15 7000018852 450 110 30 Installation of earthing of towers 100001270 995468 18 Installation of earthing of towers: Counterpoise type (120 m length) EA 5 Included 0.00 0 0
16 7000018852 450 110 40 Installation of earthing of towers 100001272 995468 18 Installation of earthing of towers: Counterpoise type (280 m length)* EA 3 Included 0.00 0 0
17 7000018852 450 110 50 Installation of earthing of towers 100002202 995468 18 Installation of Shieldwire Earthingincluding PG clamps, Downlead clampsand Earthwire bits i.e Shield wireearthing (Pipe Type/counterpoise type)shall be an addition to earthing oftowers (Pipe type/ counterpoisetype)-Pipe type EA 13 Included 0.00 0 0
18 7000018852 450 110 60 Installation of earthing of towers 100018257 995455 18 Installation of Shieldwire Earthing Counterpoise (4X30M) type including PG clamps, Downlead clamps and Earthwire bits. Shieldwireearthing (Pipe Type/counterpoise type) shall be an in addition to Tower Earthing (Pipe type/counterpoise type) EA 1 Included 0.00 0 0
19 7000018852 450 110 70 Installation of earthing of towers 100004317 995468 18 EARTHING OF PILE FOUNDATION LOCATIONS MT 1.5 Included 0.00 0 0
20 7000018852 460 120 10 Installation of the tower accessories 100001274 995444 18 Installation of tower accessories : Danger Plate EA 248 Included 0.00 0 0
21 7000018852 460 120 20 Installation of the tower accessories 100001275 995444 18 Installation of tower accessories: Number Plate EA 248 Included 0.00 0 0
22 7000018852 460 120 30 Installation of the tower accessories 100001276 995444 18 Installation of tower accessories: Phase Plate (Set of three) SET 496 Included 0.00 0 0
23 7000018852 460 120 40 Installation of the tower accessories 100001278 995444 18 Installation of tower accessories: Circuit Plate (Set of two) SET 248 Included 0.00 0 0
24 7000018852 460 120 50 Installation of the tower accessories 100001277 995444 18 Installation of tower accessories: Anti-Climbing Devices EA 248 Included 0.00 0 0
25 7000018852 460 120 60 Installation of the tower accessories 100001279 995444 18 Installation of tower accessories: Bird Guard (Set of Three) SET 332 Included 0.00 0 0
26 7000018852 470 150 10 Stringing 100002291 995468 18 400kV AC double circuit with quad bundle conductor/ installation of insulator strings complete with arcing horns and necessaryhardware, installing and stringing of conductor including fixing of conductor accessories, installing and stringing ofearthwire/OPGW including fixing of earthwire/OPGW accessories for the line KM 94 Included 0.00 0 0
27 7000018852 470 150 20 Stringing 100004829 995468 18 Installation of insulator strings complete with arcing horns and necessary hardware, installation and stringing of conductorincluding fixing of conductor accessories, installation and stringing of earthwire/OPGW including fixing of earthwire/OPGWaccessories for powerline crossing location under live line condition. EA 1 Included 0.00 0 0
28 7000018852 550 500 10 PILE foundation 100024536 995451 18 Boring, providing and installation of bored Cast-in-situ RCC vertical piles of specified diameter and of any length below the pilecap with M25 grade of cement concrete, excluding the cost of reinforcement steel but including the cost of boring with temporaryGuide casing, bentonite solution and the length of pile to be embeded in the pile cap (length of pile for payment shall be measuredfrom bottom of pile cap), all necessary labour, materials, plants, tools & tackles etc., complete, as necessary for proper executionof the job. (Boring in all types of rocks excluded). : 1200mm diameter R.C.C.vertical bored pile upto 40 m from bottom of pile cap.. M 1392 Included 0.00 0 0
29 7000018852 550 500 20 PILE foundation 100024549 995451 18 Extra rate over item (1200mm diameter R.C.C.vertical bored pile upto 40 m from bottom of pile cap.) for boring including socketing,anchoring (if required) with required size,nos. & depth of Reinforcement in all types of rocks other than hard rock upto any depthtill founding level M 120 Included 0.00 0 0
30 7000018852 550 500 30 PILE foundation 100001314 995451 18 Excavation where ever required for pile cap /tie etc. (other than boring) for all depth and size, in all types of soils includingdisposal of excavated materials for all lifts and leads,decent etc.as directed by Engineer - In -charge, together with all labour,tools & tackles, sheeting, sheet piling, dewatering etc. complete as required for proper execution of the job. M3 450 Included 0.00 0 0
31 7000018852 550 500 40 PILE foundation 100001315 995451 18 Back filling with available excavatedearth for all leads and lifts in sidesof foundations and other under groundfacilities in horizontal layers notexceeding 20 cm. in depth consolidatingeach deposited layer by ramming andwatering etc. as per specification andinstruction of Engineer -in-charge. M3 90 Included 0.00 0 0
32 7000018852 550 500 50 PILE foundation 100001316 995451 18 Form work for placing plain or reinforced cement concrete of any type including blockout and section at any elevationshoring,shuttering,strutting,propping, scaffolding,tieing,nailing,including all labour, materials, equipments, waste for form,caulking,dismantling & removal of forms etc. complete. M2 360 Included 0.00 0 0
33 7000018852 550 500 60 PILE foundation 100001317 995451 18 Supply and placing of steelreinforcement of specified grade forR.C.C. work in pile, pile cap, pedestal/chimney, tie beam (if required)including cost of all labours ,materials, straightening, cleaning,cutting, bending, binding etc. allcomplete as per construction drawingand as per instruction ofEngineer-In-Charge. MT 144.339 Included 0.00 0 0
34 7000018852 550 500 70 PILE foundation 100001318 995451 18 Providing and laying in position M25Grade reinforced cement concrete forpile caps, pedestal/chimney and tiebeam(if required), excludingreinforcement steel and form work butincluding cement, all necessary toolsand tackles,labour, materials,equipments for handling,transportation,batching, mixing,placing, vibrating,dewatering, curing etc.all complete asper specification and as perinstruction of Engineer-In- Charge(excluding cost of concrete in pileswhich is included in boring of cast insitu RCC vertical piles in therelevent line item. ) M3 315.444 Included 0.00 0 0
35 7000018852 550 500 80 PILE foundation 100001319 995451 18 Providing and laying plain cementconcrete 1:4:8 (1cement : 4 coarsesand: 8 graded stone aggregate 40mmnominal size) including cement, allnecessary tools and tackles,labour,materials, equipments forhandling,transportation,mixing,placing,vibrating,dewatering etc.all completeas per Specification . M3 19.461 Included 0.00 0 0
36 7000018852 550 500 90 PILE foundation 100001320 998346 18 Conducting Standard Penetration Test (SPT) at various elevations in pile bore holes in all kind of soils including all labour,materials, tools and tackles, equipments etc. required for successful completion of the job. EA 96 Included 0.00 0 0
37 7000018852 550 500 100 PILE foundation 100001321 995451 18 Supply and Providing M.S. liner of 6mm. thick in piles upto 10m. Depth (maxm.) from bottom of pile cap, limited to the approveddrawing, including supply, straightening, bending, welding,all supports, labours, tools and tackles, plants & equipments, withprimer and paintinting etc. (complete) as required for successful completion of the job MT 85.68 Included 0.00 0 0
38 7000018852 550 500 110 PILE foundation 100001322 998346 18 Conducting integrity test on pile usingelectronic control unit,hand heldhammer, accelerometer, computer withrequired software to assessas-installed pile characteresticsincluding mobilisation of necessarymanpower, equipments, materials etc.required for successful completion ofthe job EA 48 Included 0.00 0 0
39 7000018852 550 500 120 PILE foundation 100024563 995451 18 Extra rate over item (1200mm diameter R.C.C.vertical bored pile upto 40 m from bottom of pile cap.) for boring including socketing,anchoring (if required) with required size,nos. & depth of Reinforcement in hard rock upto a maximum depth of 10m M 120 Included 0.00 0 0
40 7000018852 590 550 10 Installation of Aviation light 100001282 995444 18 Installation of Span Markers for aviation requirements EA 10 Included 0.00 0 0
41 7000018852 590 550 20 Installation of Aviation light 100001283 995444 18 Installation of Obstruction Lights for Aviation requirements 1 Medium Intensity Plus 2 Low Intensity SET 1 Included 0.00 0 0
42 7000018852 590 550 30 Installation of Aviation light 100001284 995444 18 Installation of Obstruction Lights for Aviation requirements: 1 Medium Intensity + 4 Low Intensity SET 1 Included 0.00 0 0
43 7000018852 600 560 10 Benching 100001252 995432 18 Benching: All kinds of soils except fissured rock,hard rock and sandy soil M3 2500 Included 0.00 0 0
44 7000018852 600 560 20 Benching 100001253 995432 18 Benching: Fissured Rock M3 250 Included 0.00 0 0
45 7000018852 610 570 10 Protection of tower footing 100001264 995456 18 Protection of tower footing (supply and installation): ' Random rubble stone masonary including excavation (1:5 cement mortar) M3 3125 Included 0.00 0 0
46 7000018852 610 570 20 Protection of tower footing 100001268 995456 18 Protection of tower footing (supply and installation): Backfilling and gap levelling of volumes enclosed by revetment M3 2500 Included 0.00 0 0
47 7000018852 610 570 30 Protection of tower footing 100001267 995456 18 Protection of tower footing (supply and installation): M 15 (1:2:4) mixed concrete for top seal cover of revetment M3 250 Included 0.00 0 0
48 7000018852 620 580 10 Painting of tower 100001285 995473 18 Painting of towers MT 150 Included 0.00 0 0
49 7000018852 630 610 420 Testing charges for 400kV Quad Towers 100016976 998873 18 Development of structural/shop drawing/Bill of material of standard tower including all body/leg extensions, stub and stub settingtemplate diagram as per Employer’s supplied single line diagram of towers. Fabrication/Refabrication , galvanization of prototype tower, Horizontal proto assembly , inspection and transportation of test tower test bed for 400 kV Towers Double circuitwith twin/ triple / Quad bundle conductor configuration for all wind Zone MT 157 Included 0.00 0 0
50 7000018852 630 610 430 Testing charges for 400kV Quad Towers 100016977 998873 18 Erection/Dismantling of tower and/or tower parts on the tower testing bed as per specification for 400 kV Towers Double circuitwith twin/ triple / Quad bundle conductor configuration for all wind Zone MT 157 Included 0.00 0 0
51 7000018852 630 610 440 Testing charges for 400kV Quad Towers 100016978 998873 18 Testing of test tower for Reliability for 400 kV Towers Double circuit with twin/ triple / Quad bundle conductor configuration forall wind Zone EA 14 Included 0.00 0 0
52 7000018852 630 610 450 Testing charges for 400kV Quad Towers 100016979 998873 18 Testing of test tower for Security for 400 kV Towers Double circuit with twin/ triple / Quad bundle conductor configuration for allwind Zone EA 32 Included 0.00 0 0
53 7000018852 630 610 460 Testing charges for 400kV Quad Towers 100016980 998873 18 Testing of test tower for Safety for 400 kV Towers Double circuit with twin/ triple / Quad bundle conductor configuration for allwind Zone EA 8 Included 0.00 0 0
54 7000018852 630 610 470 Testing charges for 400kV Quad Towers 100016981 998873 18 Destruction testing of tower for 400 kV Towers Double circuit with twin/ triple / Quad bundle conductor configuration for all windZone EA 4 Included 0.00 0 0
55 7000018852 850 640 10 OPGW Services 170000356 998336 18 Fibre Optic Distribution Panel (FODP): Indoor Type: FC Coupling and mounted on ETSI 19" rack or slimline rack: Type 2 (96 Fibre) EA 1 Included 0.00 0 0
56 7000018852 850 640 20 OPGW Services 170000265 998716 18 Installation of Joint box above ground (Including Splicing & Testing) : 24 fibres EA 21 Included 0.00 0 0
57 7000018852 850 640 30 OPGW Services 100002882 998336 18 Fibre Optic Approach cabling: Including installation hardware like ties/clips/cleats, conduits, ducts, supports, fittings,accessories etc.: 24 Fibre KM 1 Included 0.00 0 0
58 7000018852 860 650 30 Camp 100023085 995455 18 ESTABLISHMENT OF LABOUR CAMPS AS PER PROVISION UNDER FACILITIES TO BE INCORPORATED FOR LABOURERS IN TECHNICAL SPECIFICATION LS 1 Included 0.00 0 0
Total Installation Charges 0.00 0
Total GST as confirmed by Bidder 0.00
* In case the bidder leaves the cell for confirmation of the SAC and/or GST rate “blank”, the SAC and corresponding GST rate indicated by the Employer shall be deemed to be the one confirmed by the Bidder.
Place : Printed Name :
Specification No.: 5002002333/CONSULTANCY GIVEN/DOM/A04-CC CS -5 Schedule - 3
Tower Package TW01 for Indian Portion of New Butwal-Gorakhpur 400kV D/C (Quad Moose) line including supply of composite insulator, earthwire, OPGW, hardware & associated accessories, pile foundation and tower testing. (approx. 94 km) for Cross border Interconnection under Consultancy Services to Joint venture of POWERGRID & Nepal Electricity Authority As per Lum-sum 0.00%
(SCHEDULE OF RATES AND PRICES : ERECTION CHARGES) AS per Percent #REF!
As per lum-sum on Sch-3 0.00%
Bidder’s Name and Address (Sole Bidder) : To: As per Percent on Sch-3 #REF!
Contracts Services, 3rd Floor Total Discount #REF!
Name : …….. …….. …….. …….. …….. …….. Power Grid Corporation of India Ltd.,
Address : …….. …….. …….. …….. …….. …….. "Saudamini", Plot No.-2
…….. …….. …….. …….. …….. …….. Sector-29, Multipackage lum-sum 0.00%
All Prices are in Indian Rupees. Amount after Discount (Rs.) Dis Alert Amount after MPD (Rs.)
SI. No. Description Unit Quantity Unit Erection Charges Total Erection Charges Unit Erection Charges Total Erection Charges Unit Erection Charges Total Erection Charges
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! (a) Detailed Soil Investigation
#REF! #REF! #REF! #REF! #REF! (b) All kinds of soil except fissured rock & hard rock
#REF! #REF! #REF! #REF! #REF! (e) River Crossing Location
#REF! #REF! #REF! #REF! #REF! (f)
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
Total Erection Price (A+B) #REF!
Place : Printed Name :
Specification No.: 5002002333/CONSULTANCY GIVEN/DOM/A04-CC CS -5 Schedule - 4
Tower Package TW01 for Indian Portion of New Butwal-Gorakhpur 400kV D/C (Quad Moose) line including supply of composite insulator, earthwire, OPGW, hardware & associated accessories, pile foundation and tower testing. (approx. 94 km) for Cross border Interconnection under Consultancy Services to Joint venture of POWERGRID & Nepal Electricity Authority
(SCHEDULE OF RATES AND PRICES )
Bidder’s Name and Address (Sole Bidder) : To:
Contracts Services, 3rd Floor
Name : …….. …….. …….. …….. …….. …….. Power Grid Corporation of India Ltd.,
Address : …….. …….. …….. …….. …….. …….. "Saudamini", Plot No.-2
Training Charges for Training to be imparted
SI. No. PR No PR Line Item No Activity Header PR Activity No Activity Description Service Code SAC (Service Accounting Codes) Whether SAC in column '8’ is confirmed. If not indicate applicable the SAC * Rate of GST applicable ( in %) Whether rate of GST in column ‘4’ is confirmed. If not indicate applicable rate of GST * Description Unit Quantity Unit Training Charges excluding GST Total Training Charges excluding GST Total GST as confirmed by Bidder
Revaluation of J column Tax Calculation
NOT APPLICABLE Revaluation of J column Tax Calculation
Included 0.00 0 0
Total Training Charges 0.00 0
Total GST as confirmed by Bidder 0.00
Date : -- Printed Name :
Place : Designation :
Specification No.: 5002002333/CONSULTANCY GIVEN/DOM/A04-CC CS -5 Schedule - 4b
Tower Package TW01 for Indian Portion of New Butwal-Gorakhpur 400kV D/C (Quad Moose) line including supply of composite insulator, earthwire, OPGW, hardware & associated accessories, pile foundation and tower testing. (approx. 94 km) for Cross border Interconnection under Consultancy Services to Joint venture of POWERGRID & Nepal Electricity Authority
(SCHEDULE OF RATES AND PRICES )
Bidder’s Name and Address (Sole Bidder) : To:
Contracts Services, 3rd Floor
Name : …….. …….. …….. …….. …….. …….. Power Grid Corporation of India Ltd.,
Address : …….. …….. …….. …….. …….. …….. "Saudamini", Plot No.-2
Maintenance Charges during & after Defect Laibility Period
SI. No. PR No PR Line Item No Activity Header PR Activity No Activity Description Service Code SAC (Service Accounting Codes) Whether SAC in column '8’ is confirmed. If not indicate applicable the SAC * Rate of GST applicable ( in %) Whether rate of GST in column ‘4’ is confirmed. If not indicate applicable rate of GST * Description Unit Quantity Unit Maintenance Charges excluding GST Total Maintenance Charges excluding GST Total GST as confirmed by Bidder
0 Revaluation of P column Tax Calculation
A. #REF! Revaluation of P column Tax Calculation
1 Included 0.00 0 0
2 Included 0.00 0 0
3 Included 0.00 0 0
4 Included 0.00 0 0
B. #REF! Revaluation of P column Tax Calculation
1 Included 0.00 0 0
2 Included 0.00 0 0
3 Included 0.00 0 0
4 Included 0.00 0 0
Total Maintenance Charges during and after Defect Liabilty Period 0.00 0
Total GST as confirmed by Bidder 0.00
Date : -- Printed Name :
Place : Designation :
Specification No.: 5002002333/CONSULTANCY GIVEN/DOM/A04-CC CS -5 Schedule - 5
Tower Package TW01 for Indian Portion of New Butwal-Gorakhpur 400kV D/C (Quad Moose) line including supply of composite insulator, earthwire, OPGW, hardware & associated accessories, pile foundation and tower testing. (approx. 94 km) for Cross border Interconnection under Consultancy Services to Joint venture of POWERGRID & Nepal Electricity Authority
(SUMMARY OF TAXES & DUTIES APPLICABLE ON PLANT & EQUIPMENT)
Bidder’s Name and Address (Sole Bidder) : To:
Contracts Services, 3rd Floor
Name : …….. …….. …….. …….. …….. …….. Power Grid Corporation of India Ltd.,
Address : …….. …….. …….. …….. …….. …….. "Saudamini", Plot No.-2
Sl. No. Item Nos. Total Price (INR) After Discount After MPDiscount
1 TOTAL GST ON GOODS Excise Duty #REF! Excise Duty #REF!
Total GST for Supply of Goods (inter-alia including Type Test Charges) between the Contractor and the Employer (identified in Schedule 1') which are not included in the Ex-works price as per the provision of the Bidding Documents, as applicable. 0.00
2 TOTAL GST ON SERVICES Sales Tax 0.00 Sales Tax 0.00
Total GST on Installation Services (Schedule-3), Training to be imparted in India (Schedule-4) 0.00 #REF! 0 #REF! 0
GRAND TOTAL [1+2] 0.00 Grand Total after Discount #REF! Grand Total after MPD #REF!
Date : -- Printed Name :
Place : Designation :
Specification No.: 5002002333/CONSULTANCY GIVEN/DOM/A04-CC CS -5 Schedule - 5
Tower Package TW01 for Indian Portion of New Butwal-Gorakhpur 400kV D/C (Quad Moose) line including supply of composite insulator, earthwire, OPGW, hardware & associated accessories, pile foundation and tower testing. (approx. 94 km) for Cross border Interconnection under Consultancy Services to Joint venture of POWERGRID & Nepal Electricity Authority
SUMMARY OF TAXES & DUTIES APPLICABLE ON GOODS
Bidder’s Name and Address (Sole Bidder) : To:
Contracts Services, 3rd Floor
Name : …….. …….. …….. …….. …….. …….. Power Grid Corporation of India Ltd.,
Address : …….. …….. …….. …….. …….. …….. "Saudamini", Plot No.-2
Sl. No. Item Nos. Total Price (INR)
1 TOTAL GST ON GOODS 0.00
Total GST for Supply of Goods (inter-alia including Type Test Charges) between the Contractor and the Employer (identified in Schedule 1') which are not included in the Ex-works price as per the provision of the Bidding Documents, as applicable.
2 TOTAL GST ON SERVICES 0.00
Total GST on Installation Services (Schedule-3), Training to be imparted in India (Schedule-4a) and Maintenance Charges during and after Defect Liabilty Period (Schedule-4b)
GRAND TOTAL [1+2] 0.00
Date : -- Printed Name :
Place : Designation :
Specification No.: 5002002333/CONSULTANCY GIVEN/DOM/A04-CC CS -5 Schedule - 6
Tower Package TW01 for Indian Portion of New Butwal-Gorakhpur 400kV D/C (Quad Moose) line including supply of composite insulator, earthwire, OPGW, hardware & associated accessories, pile foundation and tower testing. (approx. 94 km) for Cross border Interconnection under Consultancy Services to Joint venture of POWERGRID & Nepal Electricity Authority
(GRAND SUMMARY)
Bidder’s Name and Address (Sole Bidder) : To:
Contracts Services, 3rd Floor
Name : …….. …….. …….. …….. …….. …….. Power Grid Corporation of India Ltd.,
Address : …….. …….. …….. …….. …….. …….. "Saudamini", Plot No.-2
Sl. No. Description Total Price (INR)
1 TOTAL SCHEDULE NO. 1 0.00
Ex-works price of Plant and Equipment including Type Test Charges
2 TOTAL SCHEDULE NO. 2 0.00
Local Transportation, In-transit Insurance, loading & unloading
3 TOTAL SCHEDULE NO. 3 0.00
Installation Charges
4 TOTAL SCHEDULE NO. 4 0.00
Training Charges
4b TOTAL SCHEDULE NO. 4b 0.00
Maintenance Charges during & after Defect Laibility Period
5 TOTAL SCHEDULE NO. 5 0.00
Taxes and Duties
6 TOTAL SCHEDULE NO. 7 0.00
Type Test Charges [Total of this Schedule is included in Schedule - 1 above.]
GRAND TOTAL [1+2+3+4+5] 0.00
Date : -- Printed Name :
Place : Designation :
Specification No.: 5002002333/CONSULTANCY GIVEN/DOM/A04-CC CS -5 Schedule - 6 After Discount
Tower Package TW01 for Indian Portion of New Butwal-Gorakhpur 400kV D/C (Quad Moose) line including supply of composite insulator, earthwire, OPGW, hardware & associated accessories, pile foundation and tower testing. (approx. 94 km) for Cross border Interconnection under Consultancy Services to Joint venture of POWERGRID & Nepal Electricity Authority
(GRAND SUMMARY)
Bidder’s Name and Address (Sole Bidder) : To:
Contracts Services, 3rd Floor
Name : …….. …….. …….. …….. …….. …….. Power Grid Corporation of India Ltd.,
Address : …….. …….. …….. …….. …….. …….. "Saudamini", Plot No.-2
Sl. No. Description Total Price (INR)
1 TOTAL SCHEDULE NO. 1 0.00
Ex-works price of Plant and Equipment including Type Test Charges
2 TOTAL SCHEDULE NO. 2 0.00
Local Transportation, In-transit Insurance, loading & unloading
3 TOTAL SCHEDULE NO. 3 0.00
Installation Charges
4 TOTAL SCHEDULE NO. 4 0.00
Training Charges
4b TOTAL SCHEDULE NO. 4b 0.00
Maintenance Charges during & after Defect Laibility Period
5 TOTAL SCHEDULE NO. 5 0.00
Taxes and Duties
6 TOTAL SCHEDULE NO. 7 0.00
Type Test Charges [Total of this Schedule is included in Schedule - 1 above.]
GRAND TOTAL [1+2+3+4+5] 0.00
Date : -- Printed Name :
Place : Designation :
Specification No.: 5002002333/CONSULTANCY GIVEN/DOM/A04-CC CS -5 Schedule 7
Tower Package TW01 for Indian Portion of New Butwal-Gorakhpur 400kV D/C (Quad Moose) line including supply of composite insulator, earthwire, OPGW, hardware & associated accessories, pile foundation and tower testing. (approx. 94 km) for Cross border Interconnection under Consultancy Services to Joint venture of POWERGRID & Nepal Electricity Authority As per Lum-sum 0.00%
(SCHEDULE OF RATES AND PRICES ) AS per Percent #REF!
As per lum-sum on Sch-7 0.00%
Bidder’s Name and Address (Sole Bidder) : To: As per Percent on Sch-7 #REF!
Contracts Services, 3rd Floor Total Discount #REF!
Name : …….. …….. …….. …….. …….. …….. Power Grid Corporation of India Ltd.,
Address : …….. …….. …….. …….. …….. …….. "Saudamini", Plot No.-2
…….. …….. …….. …….. …….. …….. Sector-29, Multipackage Discount 0.0000%
Type tests on Earthwire, Hardwar Fittings & accessories of conductor & earthwire:
SL. NO. PR No Line Item No Code HSN Code Whether HSN in column ‘2’ is confirmed. If not indicate applicable the HSN code * Rate of GST applicable ( in %) Whether rate of GST in column ‘4’ is confirmed. If not indicate applicable rate of GST * Description of Test Unit Quantity Unit Test Charge Total Test Charges (Rs.) Total GST as confirmed by Bidder Revaluation of M column Tax Calculation Total Test Charges After Discount (Rs.) Dis Alert Total Test Charges After MPD (Rs.)
1 Included 0.00 0 0.00
2 Included 0.00 0 0.00
TOTAL TYPE TEST CHARGES 0.00
Total GST as confirmed by Bidder 0.00
Date : -- Printed Name :
Place : Designation :
Note : Bidder should indicate the name of test laboratories where type tests are proposed to be conducted
Specification No.: 5002002333/CONSULTANCY GIVEN/DOM/A04-CC CS -5
Tower Package TW01 for Indian Portion of New Butwal-Gorakhpur 400kV D/C (Quad Moose) line including supply of composite insulator, earthwire, OPGW, hardware & associated accessories, pile foundation and tower testing. (approx. 94 km) for Cross border Interconnection under Consultancy Services to Joint venture of POWERGRID & Nepal Electricity Authority 0 0
(SCHEDULE OF RATES AND PRICES ) 0 0
Bidder’s Name and Address (Sole Bidder) :
SL. NO. Description of Test #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
Specification No.: 5002002333/CONSULTANCY GIVEN/DOM/A04-CC CS -5
Tower Package TW01 for Indian Portion of New Butwal-Gorakhpur 400kV D/C (Quad Moose) line including supply of composite insulator, earthwire, OPGW, hardware & associated accessories, pile foundation and tower testing. (approx. 94 km) for Cross border Interconnection under Consultancy Services to Joint venture of POWERGRID & Nepal Electricity Authority As per Lum-sum 0.00%
(SCHEDULE OF RATES AND PRICES : TYPE TEST CHARGES) AS per Percent #REF!
As per lum-sum on Sch-7 0.00%
Bidder’s Name and Address (Sole Bidder) : To: As per Percent on Sch-7 #REF!
Contracts Services, 3rd Floor Total Discount #REF!
Name : …….. …….. …….. …….. …….. …….. Power Grid Corporation of India Ltd.,
Address : …….. …….. …….. …….. …….. …….. "Saudamini", Plot No.-2
…….. …….. …….. …….. …….. …….. Sector-29, Multipackage Discount 0.0000%
Type Tests on Earthwire
SL. NO. Description of Test Unit Quantity Unit Test Charge Total Test Charges (Rs.) Total Test Charges After Discount (Rs.) Dis Alert Total Test Charges After MPD (Rs.)
(a) #REF! #REF! #REF! #REF! #REF!
(b) #REF! #REF! #REF! #REF! #REF!
Sub-Total (I) #REF!
TOTAL TEST CHARGES (I) #REF!
Discount Sche-7 #REF! MPD Sche-7 #REF!
Dis Alert #REF!
Date : -- Printed Name :
Place : Designation :
Note : Bidder should indicate the name of test laboratories where type tests are proposed to be conducted
Specification No.: 5002002333/CONSULTANCY GIVEN/DOM/A04-CC CS -5
Tower Package TW01 for Indian Portion of New Butwal-Gorakhpur 400kV D/C (Quad Moose) line including supply of composite insulator, earthwire, OPGW, hardware & associated accessories, pile foundation and tower testing. (approx. 94 km) for Cross border Interconnection under Consultancy Services to Joint venture of POWERGRID & Nepal Electricity Authority 0 0 0
(SCHEDULE OF RATES AND PRICES : TYPE TEST CHARGES) 0 0 0
Bidder’s Name and Address (Sole Bidder) : 0
SL. NO. Description of Test 0
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
This letter of discount is optional. Bidder may / may not offer any discount.
Specification No.: 5002002333/CONSULTANCY GIVEN/DOM/A04-CC CS -5 Letter of Discount
LETTER OF DISCOUNT
Contract Services
Power Grid Corporation of India Ltd.,
"Saudamini", Plot No.-2
Sector-29, (near IFFCO Chowk)
Gurgaon (Haryana) - 122001
Subject : Tower Package TW01 for Indian Portion of New Butwal-Gorakhpur 400kV D/C (Quad Moose) line including supply of composite insulator, earthwire, OPGW, hardware & associated accessories, pile foundation and tower testing. (approx. 94 km) for Cross border Interconnection under Consultancy Services to Joint venture of POWERGRID & Nepal Electricity Authority
With reference to the subject tender, we hereby offer unconditional discount on the prices quoted by us as per details given here below : Eq Weightage of Rs/ % Final Discount Factor
1 Discount on lum-sum basis on total price quoted by us without Taxes & Duties. [The discount shall be proportionately applicable on all the items of all the Schdules i.e. Sch-1 (without type test charges), Sch-2, Sch-3, Sch-4a, Sch-4b & Sch-7] In Rs. 0.00 0.0000000000%
2 Discount on percent basis on total price quoted by us without Taxes & Duties. [The discount shall be proportionately applicable on all the items of all the Schdules i.e. Sch-1 (without type test charges), Sch-2 , Sch-3, Sch-4a, Sch-4b & Sch-7] In Percent (%) 0.00 0.00%
3 Discount on lum-sum basis on the Schedules as given below : [The discount shall be proportionately applicable on all the relevent items of the respective Schdules.] In Rs.
Schedule-1 : Ex works prices In Rs. 0.00 0.0000000000% Schedule-1 : Ex-Works Price 0.0000000000%
Schedule-2 : Freight & Insurance In Rs. 0.00 0.0000000000% Schedule-2 : Freight & Insurance 0.0000000000%
Schedule-3 : Erection Charges In Rs. 0.00 0.0000000000% Schedule-3 : Erection Charges 0.0000000000%
Schedule-4a : Training Charges In Rs. 0.00 0.0000000000% Schedule-4a : Training Charges 0.0000000000%
Schedule-4b : Maintenance Charges during and after DLP In Rs. 0.00 0.0000000000% Schedule-4b : Maintenance Charges 0.0000000000%
Schedule-7 : Type Test Charges In Rs. 0.00 0.0000000000% Schedule-7 : Type Test Charges 0.0000000000%
4 Discount on percent basis on the Schedules as given below : [The discount shall be proportionately applicable on all the relevent items of the respective Schdules.] In Percent (%)
Schedule-1 : Ex works prices In Percent (%) 0.00 0.00%
Schedule-2 : Freight & Insurance In Percent (%) 0.00 0.00%
Schedule-3 : Erection Charges In Percent (%) 0.00 0.00%
Schedule-4a : Training Charges In Percent (%) 0.00 0.00%
Schedule-4b : Maintenance Charges during and after DLP In Percent (%) 0.00 0.00%
Schedule-7 : Type Test Charges In Percent (%) 0.00 0.00%
Discount(s) offered at sl. No. 1 to 4 will get displayed and accounted for automatically in the respective items of the Schedules.
5 We hereby offer Multi-package discount as given below:
Multi-Package Discount(s) offered at sl. No. 5 will not get automatically accounted for in the respective items of the Schedules. The same shall be worked out saparately for evaluation.
Please consider this letter of discount as the integral part of our price bid.
Thanking you, we remain,
Yours faithfully,
For and on behalf of …….. …….. …….. …….. …….. ……..
Date : -- Printed Name :
Place : Designation :
Details of Octroi
Sl No. Description of Items Amount on which Octroi is applicable Rate of Octroi Octroi
Details of Entry Tax
Sl No. Description of Items Amount on which Entry Tax is applicable Rate of Entry Tax Entry Tax
Details of Other Taxes & Duties
Sl No. Description of Items Amount on which Other Taxes & Duties are applicable Description of Taxes & Duties Rate of Taxes & Duties Amount of Taxes & Duties
Specification No.: 5002002333/CONSULTANCY GIVEN/DOM/A04-CC CS -5 Bid Form 2nd Envelope Sole Bidder 1 st 1 January
0 2 nd 2 February
BID FORM (Second Envelope) 3 rd 3 March
Bid Proposal Ref. No. 5 th 5 May
Date : -- 6 th #VALUE! 6 June
7 th #VALUE! 7 July
To: 8 th #VALUE! 8 August
Contracts Services, 3rd Floor 9 th #VALUE! 9 September
Power Grid Corporation of India Ltd., 10 th 10 October
"Saudamini", Plot No.-2 11 th 11 November
Sector-29, 12 th 12 December
Gurgaon (Haryana) - 122001 13 th
Name of Contract : Tower Package TW01 for Indian Portion of New Butwal-Gorakhpur 400kV D/C (Quad Moose) line including supply of composite insulator, earthwire, OPGW, hardware & associated accessories, pile foundation and tower testing. (approx. 94 km) for Cross border Interconnection under Consultancy Services to Joint venture of POWERGRID & Nepal Electricity Authority 15 th
Dear Ladies and/or Gentlemen, 16 th
Schedule 1 Plant and Equipment (Including Mandatory Spare Parts) to be supplied, including Type Test Charges. 21 st
Schedule 2 Local Transportation, In-transit Insurance, loading and unloading 22 th
Schedule 3 Installation Charges. 23 th
Schedule 4 Training charges for training to be imparted. 24 th
Schedule 4b Maintenance Charges during & after Defect Laibility Period.
Schedule 5 Taxes and Duties not included in Schedule 1 25 th
Schedule 6 Grand Summary [Schedule 1to 5] 26 th
Schedule 7 Break-up of Type Test Charges for Type Tests to be conducted 27 th
2.5 We declare that items left blank in the Schedules will be deemed to have been included in other items. The TOTAL for each Schedule and the TOTAL of Grand Summary shall be deemed to be the total price for executing the Facilities and sections thereof in complete accordance with the Contract, whether or not each individual item has been priced. 31 st
3.0 We confirm that except as otherwise specifically provided our Bid Prices in this Second Envelope include all taxes, duties, levies and charges as may be assessed on us/our Associate (applicable for Foreign Bidder), our Sub-Contractor/Sub-Vendor or their employees by all municipal, state or national government authorities in connection with the Facilities, in and outside of India.
3.1 100% of applicable Taxes and Duties i.e GST which are payable by the Employer under the Contract, shall be reimbursed by the Employer on production of satisfactory documentary evidence by the Contractor in accordance with the provisions of the Bidding Documents.
3.3 We confirm that we have also registered/we shall also get registered in the GST Network with a GSTIN, in all the states where the project is located and the states from which we shall make our supply of goods.
4.0 # (For Joint Venture only) We, the partners of Joint Venture submitting this bid, do agree and confirm that in case of Award of Contract on the Joint Venture, we shall be jointly and severally liable and responsible for the execution of the Contract in accordance with Contract terms and conditions. 1
5.0 We, hereby, declare that only the persons or firms interested in this proposal as principals are named here and that no other persons or firms other than those mentioned herein have any interest in this proposal or in the Contract to be entered into, if the award is made on us, that this proposal is made without any connection with any other person, firm or party likewise submitting a proposal is in all respects for and in good faith, without collusion or fraud.
Thanking you, we remain,
Yours faithfully,
For and on behalf of …….. …….. …….. …….. …….. ……..
Date : -- Printed Name :
Place : Designation :
In case of bid from a Joint Venture, name & designation of representative of JV partner is to be provided and Bid Form is also to be signed by him.
Please provide additional information of the Bidder
Business Address :
Country of Incorporation :
State/Province to be indicated :
Name of Principal Officer :
Address of Principal Officer :
Note: Bidders may note that no prescribed proforma has been enclosed for Attachment 2 : Power of Attorney. Bidders may use their own proforma for furnishing the required information with the bid.
STATEMENT OF QUOTED / CORRECTED PRICES
All Figures are in Rupees
Sl. No. Price Component Quoted Price Corrected Price
1 TOTAL SCHEDULE NO. 1:Ex-Works Price of Plant and Equipment including Type Test Charges 0.00 0.00
2 TOTAL SCHEDULE NO.2: Local Transportation, Insurance and other Incidental Services. 0.00 0.00
3 TOTAL SCHEDULE NO.3: Installation Charges 0.00 0.00
4 TOTAL SCHEDULE NO.4: Training Charges Not Applicable Not Applicable
5 TOTAL BID PRICE: (Excluding Taxes & Duties) 0.00 0.00
6 DISCOUNT #REF! #REF! #REF!
7 NET BID PRICE (Excluding Taxes & Duties) #REF! #REF!
8 TAXES & DUTIES PAYABLE ADDITIONALLY
A) EXCISE DUTY 0 0.00
B) CENTRAL SALES TAX 0 0.00
C) VAT #REF! 0.00
D) ENTRY TAX / OCTROI #REF! 0.00
F) TOTAL TAXES & DUTIES #REF! 0.00
8 TOTAL BID PRICE (INCLUDING TAXES & DUTIES) #REF! 0.00
9 TOTAL SCHEDULE NO.7: Type Test Charges [Total of this Schedule is included in Schedule-1 above] 0.00 0.00
I) Bidder has indicated the following taxes and duties additionally applicable for their bid:
Excise Duty % as Excise Duty
#REF! VAT #REF! #REF!
#REF! Entry Tax/ Octroi #REF! #REF!
Others as Others
II) With regard to Entry Tax, it may be mentioned that the substations covered under the subject pacakge falls in State of MP, where an entry tax @ 2% of Purchase Price is applicable. In view of the above, the taxes and duties inter-alia including entry tax applicable for the bids are calculated :
a) Ex-Works Price of Direct Supplies (after discount, if any) Rs. 0
b) Excise Duty, as applicable on (a) above at the rate : 10.00% Rs. 0
c) Amount on which Sales Tax is applicable 0.00 0
d) CST, as applicable on (a) + ED (b) above at the rate : 2.00% Rs. 0
e) VAT, as applicable on (a) + ED (b) above at the rate : 1.00% 0
g) Purchase Price for Entry Tax (Total Ex-Works+F&I+ED+CST+Others) Rs. 0
h) Entry Tax, as applicable on (e) above at the rate : Rs. 0.00
Tower Package TW01 for Indian Portion of New Butwal-Gorakhpur 400kV D/C (Quad Moose) line including supply of composite insulator, earthwire, OPGW, hardware & associated accessories, pile foundation and tower testing. (approx. 94 km) for Cross border Interconnection under Consultancy Services to Joint venture of POWERGRID & Nepal Electricity Authority Statement of Quoted / Corrected Prices Page
Spec. No. Specification No.: 5002002333/CONSULTANCY GIVEN/DOM/A04-CC CS -5
STATEMENT OF QUOTED / CORRECTED PRICES
All Figures are in Rupees
Sl. No. Price Component Quoted Price Corrected Price
1 TOTAL SCHEDULE NO. 1:Ex-Works Price of Plant and Equipment including Type Test Charges 0.00 0.00
2 TOTAL SCHEDULE NO.2: Local Transportation, Insurance and other Incidental Services. 0.00 0.00
3 TOTAL SCHEDULE NO.3: Installation Charges 0.00 0.00
4 TOTAL SCHEDULE NO.4: Training Charges Not Applicable Not Applicable
5 TOTAL BID PRICE: (Excluding Taxes & Duties) 0.00 0.00
6 DISCOUNT #REF! #REF!
7 NET BID PRICE (Excluding Taxes & Duties) #REF! #REF!
8 TAXES & DUTIES PAYABLE ADDITIONALLY
A) EXCISE DUTY #REF! 0.00
B) CENTRAL SALES TAX /VAT #REF! #REF!
C) ENTRY TAX / OCTROI #REF! #REF!
D) OTHERS #REF! 0.00
E) TOTAL TAXES & DUTIES #REF! #REF!
8 TOTAL BID PRICE (INCLUDING TAXES & DUTIES) #REF! #REF!
9 TOTAL SCHEDULE NO.7: Type Test Charges [Total of this Schedule is included in Schedule-1 above] 0.00 0.00
I) Bidder has indicated the following taxes and duties additionally applicable for their bid:
a) Excise Duty Rs. #REF!
b) CST /VAT Rs. #REF!
c) Entry Tax / Octroi Rs. #REF!
d) Others Rs. #REF!
II) Bidder has offered following discount(s)
III) With regard to Entry Tax, it may be mentioned that the substations covered under the subject pacakge falls in State of MP, where an entry tax @ 1% of Purchase Price is applicable. In view of the above, the taxes and duties inter-alia including entry tax applicable for the bids are calculated : Details of dicounts
a) Ex-Works Price of Direct Supplies (after discount, if any) Rs. 0 Gross LS #REF! #REF! #REF! Gross % #REF! #REF! #REF!
b) Excise Duty @ 10.3% of (a) above Rs. 0 #REF! #REF!
c) CST / VAT @ 2% of Ex-Works of Direct Supplies (a) + ED (b) above Rs. #REF! Sch-1 Direct LS #REF! #REF! #REF! Sch-1 Direct % #REF! #REF! #REF!
d) Others Rs. Sch-1 BO LS #REF! #REF! #REF! Sch-1 BO % #REF! #REF! #REF!
e) Purchase Price for Entry Tax (Total Ex-Works+F&I+ED+CST+Others) Rs. #REF! Sch-2 LS #REF! #REF! #REF! Sch-2 % #REF! #REF! #REF!
f) Entry Tax @ 1% of (e) above Rs. #REF! Sch-3 LS #REF! #REF! #REF! Sch-3 % #REF! #REF! #REF!
Sch-7 LS #REF! #REF! #REF! Sch-7 % #REF! #REF! #REF!
Tower Package TW01 for Indian Portion of New Butwal-Gorakhpur 400kV D/C (Quad Moose) line including supply of composite insulator, earthwire, OPGW, hardware & associated accessories, pile foundation and tower testing. (approx. 94 km) for Cross border Interconnection under Consultancy Services to Joint venture of POWERGRID & Nepal Electricity Authority Statement of Quoted / Corrected Prices Page Different Manner #REF!
Text for Discount #REF!
23 Twenty Three
27 Twenty Seven
28 Twenty Eight
33 Thirty Three
37 Thirty Seven
38 Thirty Eight
73 Seventy Three
74 Seventy Four
75 Seventy Five
77 Seventy Seven
78 Seventy Eight
79 Seventy Nine
83 Eighty Three
87 Eighty Seven
88 Eighty Eight
93 Ninety Three
97 Ninety Seven
98 Ninety Eight
100 One Hundred
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html
Price_schedule.xlsx
xlsx • 1.43 MB
[Content_Types].xml
xml • 0.01 MB
.rels
rels • 0.00 MB
workbook.xml.rels
rels • 0.01 MB
workbook.xml
xml • 0.24 MB
sheet4.xml
xml • 0.03 MB
drawing25.xml
xml • 0.00 MB
drawing24.xml
xml • 0.00 MB
drawing23.xml
xml • 0.00 MB
drawing22.xml
xml • 0.00 MB
drawing21.xml
xml • 0.00 MB
vmlDrawing6.vml
vml • 0.00 MB
drawing20.xml
xml • 0.01 MB
drawing19.xml
xml • 0.00 MB
drawing18.xml
xml • 0.00 MB
drawing26.xml
xml • 0.00 MB
drawing27.xml
xml • 0.01 MB
vbaProject.bin
bin • 0.14 MB
sheet7.xml.rels
rels • 0.01 MB
sheet6.xml.rels
rels • 0.01 MB
sheet5.xml.rels
rels • 0.01 MB
sheet4.xml.rels
rels • 0.01 MB
sheet3.xml.rels
rels • 0.01 MB
sheet2.xml.rels
rels • 0.01 MB
sheet1.xml.rels
rels • 0.01 MB
sheet2.xml
xml • 0.02 MB
sheet3.xml
xml • 0.03 MB
drawing17.xml
xml • 0.00 MB
drawing16.xml
xml • 0.01 MB
drawing15.xml
xml • 0.00 MB
drawing7.xml
xml • 0.00 MB
drawing6.xml
xml • 0.00 MB
drawing5.xml
xml • 0.00 MB
vmlDrawing1.vml
vml • 0.01 MB
drawing4.xml
xml • 0.04 MB
drawing3.xml
xml • 0.00 MB
drawing2.xml
xml • 0.00 MB
image2.png
png • 0.07 MB
image1.png
png • 0.03 MB
drawing8.xml
xml • 0.01 MB
vmlDrawing2.vml
vml • 0.00 MB
drawing9.xml
xml • 0.00 MB
drawing14.xml
xml • 0.00 MB
drawing13.xml
xml • 0.00 MB
drawing12.xml
xml • 0.00 MB
vmlDrawing5.vml
vml • 0.00 MB
drawing11.xml
xml • 0.01 MB
vmlDrawing4.vml
vml • 0.00 MB
drawing10.xml
xml • 0.00 MB
vmlDrawing3.vml
vml • 0.00 MB
sheet8.xml.rels
rels • 0.01 MB
sheet9.xml.rels
rels • 0.01 MB
sheet10.xml.rels
rels • 0.00 MB
drawing15.xml.rels
rels • 0.00 MB
drawing14.xml.rels
rels • 0.00 MB
drawing13.xml.rels
rels • 0.00 MB
drawing12.xml.rels
rels • 0.00 MB
drawing11.xml.rels
rels • 0.00 MB
drawing8.xml.rels
rels • 0.00 MB
drawing7.xml.rels
rels • 0.00 MB
drawing6.xml.rels
rels • 0.00 MB
drawing5.xml.rels
rels • 0.00 MB
drawing16.xml.rels
rels • 0.00 MB
drawing17.xml.rels
rels • 0.00 MB
drawing18.xml.rels
rels • 0.00 MB
drawing27.xml.rels
rels • 0.00 MB
drawing26.xml.rels
rels • 0.00 MB
drawing25.xml.rels
rels • 0.00 MB
drawing24.xml.rels
rels • 0.00 MB
drawing23.xml.rels
rels • 0.00 MB
drawing22.xml.rels
rels • 0.00 MB
drawing21.xml.rels
rels • 0.00 MB
drawing20.xml.rels
rels • 0.00 MB
drawing19.xml.rels
rels • 0.00 MB
drawing4.xml.rels
rels • 0.00 MB
drawing3.xml.rels
rels • 0.00 MB
drawing2.xml.rels
rels • 0.00 MB
sheet19.xml.rels
rels • 0.01 MB
sheet18.xml.rels
rels • 0.01 MB
sheet17.xml.rels
rels • 0.01 MB
sheet16.xml.rels
rels • 0.01 MB
sheet15.xml.rels
rels • 0.01 MB
sheet14.xml.rels
rels • 0.01 MB
sheet13.xml.rels
rels • 0.01 MB
sheet12.xml.rels
rels • 0.01 MB
sheet11.xml.rels
rels • 0.00 MB
sheet20.xml.rels
rels • 0.01 MB
sheet21.xml.rels
rels • 0.01 MB
sheet22.xml.rels
rels • 0.01 MB
drawing1.xml.rels
rels • 0.00 MB
sheet29.xml.rels
rels • 0.01 MB
sheet28.xml.rels
rels • 0.01 MB
sheet27.xml.rels
rels • 0.00 MB
sheet26.xml.rels
rels • 0.00 MB
sheet25.xml.rels
rels • 0.01 MB
sheet24.xml.rels
rels • 0.00 MB
sheet23.xml.rels
rels • 0.01 MB
drawing1.xml
xml • 0.01 MB
sheet1.xml
xml • 0.01 MB
theme1.xml
xml • 0.01 MB
sheet23.xml
xml • 0.04 MB
sheet22.xml
xml • 0.08 MB
sheet21.xml
xml • 0.07 MB
sheet20.xml
xml • 0.08 MB
sheet19.xml
xml • 0.02 MB
sheet24.xml
xml • 0.02 MB
sheet25.xml
xml • 0.03 MB
sheet26.xml
xml • 0.02 MB
styles.xml
xml • 0.27 MB
sheet29.xml
xml • 0.02 MB
sheet28.xml
xml • 0.12 MB
sheet27.xml
xml • 0.01 MB
sheet18.xml
xml • 0.02 MB
sheet17.xml
xml • 0.09 MB
sheet16.xml
xml • 0.04 MB
sheet8.xml
xml • 0.02 MB
sheet7.xml
xml • 0.03 MB
sheet6.xml
xml • 0.03 MB
sheet5.xml
xml • 0.16 MB
sharedStrings.xml
xml • 0.08 MB
sheet30.xml
xml • 0.01 MB
sheet9.xml
xml • 0.03 MB
sheet11.xml
xml • 0.01 MB
sheet15.xml
xml • 0.02 MB
sheet10.xml
xml • 0.02 MB
sheet14.xml
xml • 0.04 MB
sheet12.xml
xml • 0.03 MB
sheet13.xml
xml • 0.02 MB
printerSettings63.bin
bin • 0.01 MB
printerSettings648.bin
bin • 0.01 MB
printerSettings647.bin
bin • 0.01 MB
printerSettings650.bin
bin • 0.01 MB
printerSettings651.bin
bin • 0.01 MB
printerSettings652.bin
bin • 0.00 MB
printerSettings649.bin
bin • 0.01 MB
printerSettings36.bin
bin • 0.01 MB
printerSettings645.bin
bin • 0.01 MB
printerSettings641.bin
bin • 0.01 MB
printerSettings642.bin
bin • 0.01 MB
printerSettings643.bin
bin • 0.01 MB
printerSettings644.bin
bin • 0.01 MB
printerSettings646.bin
bin • 0.01 MB
printerSettings663.bin
bin • 0.00 MB
printerSettings654.bin
bin • 0.01 MB
printerSettings662.bin
bin • 0.01 MB
printerSettings640.bin
bin • 0.01 MB
printerSettings664.bin
bin • 0.01 MB
printerSettings665.bin
bin • 0.00 MB
printerSettings661.bin
bin • 0.01 MB
printerSettings660.bin
bin • 0.01 MB
printerSettings659.bin
bin • 0.01 MB
printerSettings655.bin
bin • 0.01 MB
printerSettings656.bin
bin • 0.01 MB
printerSettings657.bin
bin • 0.01 MB
printerSettings658.bin
bin • 0.01 MB
printerSettings653.bin
bin • 0.00 MB
printerSettings625.bin
bin • 0.01 MB
printerSettings638.bin
bin • 0.01 MB
printerSettings621.bin
bin • 0.00 MB
printerSettings37.bin
bin • 0.00 MB
printerSettings622.bin
bin • 0.00 MB
printerSettings623.bin
bin • 0.01 MB
printerSettings620.bin
bin • 0.01 MB
printerSettings619.bin
bin • 0.01 MB
printerSettings618.bin
bin • 0.01 MB
printerSettings614.bin
bin • 0.01 MB
printerSettings615.bin
bin • 0.01 MB
printerSettings616.bin
bin • 0.01 MB
printerSettings617.bin
bin • 0.01 MB
printerSettings624.bin
bin • 0.01 MB
printerSettings666.bin
bin • 0.01 MB
printerSettings626.bin
bin • 0.01 MB
printerSettings634.bin
bin • 0.01 MB
printerSettings635.bin
bin • 0.01 MB
printerSettings636.bin
bin • 0.01 MB
printerSettings637.bin
bin • 0.01 MB
printerSettings633.bin
bin • 0.01 MB
printerSettings632.bin
bin • 0.00 MB
printerSettings631.bin
bin • 0.01 MB
printerSettings627.bin
bin • 0.01 MB
printerSettings628.bin
bin • 0.01 MB
printerSettings629.bin
bin • 0.01 MB
printerSettings630.bin
bin • 0.01 MB
printerSettings639.bin
bin • 0.01 MB
printerSettings682.bin
bin • 0.01 MB
printerSettings668.bin
bin • 0.00 MB
printerSettings700.bin
bin • 0.00 MB
printerSettings701.bin
bin • 0.01 MB
printerSettings702.bin
bin • 0.01 MB
printerSettings703.bin
bin • 0.00 MB
printerSettings704.bin
bin • 0.00 MB
printerSettings699.bin
bin • 0.00 MB
printerSettings698.bin
bin • 0.00 MB
printerSettings697.bin
bin • 0.01 MB
printerSettings693.bin
bin • 0.01 MB
printerSettings694.bin
bin • 0.01 MB
printerSettings695.bin
bin • 0.01 MB
printerSettings696.bin
bin • 0.00 MB
printerSettings705.bin
bin • 0.00 MB
printerSettings706.bin
bin • 0.01 MB
printerSettings707.bin
bin • 0.01 MB
printerSettings715.bin
bin • 0.01 MB
printerSettings716.bin
bin • 0.01 MB
printerSettings717.bin
bin • 0.01 MB
printerSettings718.bin
bin • 0.01 MB
printerSettings714.bin
bin • 0.01 MB
printerSettings713.bin
bin • 0.01 MB
printerSettings712.bin
bin • 0.01 MB
printerSettings708.bin
bin • 0.01 MB
printerSettings709.bin
bin • 0.01 MB
printerSettings710.bin
bin • 0.01 MB
printerSettings711.bin
bin • 0.01 MB
printerSettings692.bin
bin • 0.01 MB
printerSettings691.bin
bin • 0.01 MB
printerSettings690.bin
bin • 0.01 MB
printerSettings676.bin
bin • 0.01 MB
printerSettings677.bin
bin • 0.01 MB
printerSettings678.bin
bin • 0.01 MB
printerSettings679.bin
bin • 0.01 MB
printerSettings675.bin
bin • 0.01 MB
printerSettings674.bin
bin • 0.01 MB
printerSettings673.bin
bin • 0.01 MB
printerSettings669.bin
bin • 0.00 MB
printerSettings670.bin
bin • 0.01 MB
printerSettings671.bin
bin • 0.01 MB
printerSettings672.bin
bin • 0.01 MB
printerSettings680.bin
bin • 0.01 MB
printerSettings681.bin
bin • 0.01 MB
printerSettings613.bin
bin • 0.01 MB
printerSettings686.bin
bin • 0.00 MB
printerSettings687.bin
bin • 0.01 MB
printerSettings688.bin
bin • 0.01 MB
printerSettings689.bin
bin • 0.01 MB
ctrlProp24.xml
xml • 0.00 MB
ctrlProp23.xml
xml • 0.00 MB
printerSettings34.bin
bin • 0.01 MB
printerSettings683.bin
bin • 0.01 MB
printerSettings684.bin
bin • 0.01 MB
printerSettings685.bin
bin • 0.00 MB
printerSettings35.bin
bin • 0.01 MB
printerSettings667.bin
bin • 0.01 MB
printerSettings598.bin
bin • 0.01 MB
printerSettings611.bin
bin • 0.01 MB
printerSettings538.bin
bin • 0.00 MB
printerSettings539.bin
bin • 0.01 MB
printerSettings540.bin
bin • 0.01 MB
printerSettings541.bin
bin • 0.01 MB
printerSettings542.bin
bin • 0.01 MB
printerSettings537.bin
bin • 0.00 MB
printerSettings536.bin
bin • 0.01 MB
printerSettings535.bin
bin • 0.01 MB
printerSettings531.bin
bin • 0.01 MB
printerSettings532.bin
bin • 0.01 MB
printerSettings533.bin
bin • 0.00 MB
printerSettings534.bin
bin • 0.01 MB
printerSettings543.bin
bin • 0.01 MB
printerSettings544.bin
bin • 0.01 MB
printerSettings545.bin
bin • 0.01 MB
printerSettings553.bin
bin • 0.01 MB
printerSettings554.bin
bin • 0.00 MB
printerSettings39.bin
bin • 0.01 MB
printerSettings555.bin
bin • 0.00 MB
printerSettings552.bin
bin • 0.01 MB
printerSettings551.bin
bin • 0.01 MB
printerSettings550.bin
bin • 0.01 MB
printerSettings546.bin
bin • 0.01 MB
printerSettings547.bin
bin • 0.01 MB
printerSettings548.bin
bin • 0.01 MB
printerSettings549.bin
bin • 0.01 MB
printerSettings530.bin
bin • 0.01 MB
printerSettings529.bin
bin • 0.00 MB
printerSettings528.bin
bin • 0.01 MB
printerSettings511.bin
bin • 0.01 MB
printerSettings512.bin
bin • 0.01 MB
printerSettings513.bin
bin • 0.01 MB
printerSettings514.bin
bin • 0.01 MB
printerSettings510.bin
bin • 0.01 MB
printerSettings509.bin
bin • 0.01 MB
printerSettings508.bin
bin • 0.01 MB
printerSettings504.bin
bin • 0.01 MB
printerSettings505.bin
bin • 0.01 MB
printerSettings506.bin
bin • 0.01 MB
printerSettings507.bin
bin • 0.01 MB
printerSettings515.bin
bin • 0.01 MB
printerSettings516.bin
bin • 0.01 MB
printerSettings517.bin
bin • 0.01 MB
printerSettings524.bin
bin • 0.01 MB
printerSettings525.bin
bin • 0.01 MB
printerSettings526.bin
bin • 0.01 MB
printerSettings527.bin
bin • 0.01 MB
printerSettings523.bin
bin • 0.01 MB
printerSettings522.bin
bin • 0.01 MB
printerSettings521.bin
bin • 0.01 MB
printerSettings518.bin
bin • 0.00 MB
printerSettings40.bin
bin • 0.01 MB
printerSettings519.bin
bin • 0.00 MB
printerSettings520.bin
bin • 0.01 MB
printerSettings556.bin
bin • 0.01 MB
printerSettings557.bin
bin • 0.01 MB
printerSettings558.bin
bin • 0.01 MB
printerSettings593.bin
bin • 0.01 MB
printerSettings594.bin
bin • 0.01 MB
printerSettings595.bin
bin • 0.01 MB
printerSettings596.bin
bin • 0.01 MB
printerSettings592.bin
bin • 0.01 MB
printerSettings591.bin
bin • 0.00 MB
printerSettings38.bin
bin • 0.01 MB
printerSettings587.bin
bin • 0.01 MB
printerSettings588.bin
bin • 0.01 MB
printerSettings589.bin
bin • 0.01 MB
printerSettings590.bin
bin • 0.00 MB
printerSettings597.bin
bin • 0.01 MB
printerSettings719.bin
bin • 0.01 MB
printerSettings599.bin
bin • 0.01 MB
printerSettings607.bin
bin • 0.01 MB
printerSettings608.bin
bin • 0.01 MB
printerSettings609.bin
bin • 0.01 MB
printerSettings610.bin
bin • 0.01 MB
printerSettings606.bin
bin • 0.01 MB
printerSettings605.bin
bin • 0.01 MB
printerSettings604.bin
bin • 0.01 MB
printerSettings600.bin
bin • 0.01 MB
printerSettings601.bin
bin • 0.00 MB
printerSettings602.bin
bin • 0.01 MB
printerSettings603.bin
bin • 0.00 MB
printerSettings586.bin
bin • 0.01 MB
printerSettings585.bin
bin • 0.01 MB
printerSettings584.bin
bin • 0.01 MB
printerSettings566.bin
bin • 0.01 MB
printerSettings567.bin
bin • 0.00 MB
printerSettings568.bin
bin • 0.00 MB
printerSettings569.bin
bin • 0.00 MB
printerSettings565.bin
bin • 0.00 MB
printerSettings564.bin
bin • 0.01 MB
printerSettings563.bin
bin • 0.01 MB
printerSettings559.bin
bin • 0.01 MB
printerSettings560.bin
bin • 0.01 MB
printerSettings561.bin
bin • 0.01 MB
printerSettings562.bin
bin • 0.01 MB
printerSettings570.bin
bin • 0.01 MB
printerSettings571.bin
bin • 0.01 MB
printerSettings572.bin
bin • 0.00 MB
printerSettings580.bin
bin • 0.01 MB
printerSettings581.bin
bin • 0.01 MB
printerSettings582.bin
bin • 0.01 MB
printerSettings583.bin
bin • 0.01 MB
printerSettings579.bin
bin • 0.01 MB
printerSettings578.bin
bin • 0.01 MB
printerSettings577.bin
bin • 0.01 MB
printerSettings573.bin
bin • 0.01 MB
printerSettings574.bin
bin • 0.01 MB
printerSettings575.bin
bin • 0.01 MB
printerSettings576.bin
bin • 0.01 MB
printerSettings612.bin
bin • 0.01 MB
printerSettings734.bin
bin • 0.01 MB
printerSettings721.bin
bin • 0.00 MB
printerSettings864.bin
bin • 0.01 MB
printerSettings865.bin
bin • 0.01 MB
printerSettings866.bin
bin • 0.01 MB
printerSettings867.bin
bin • 0.01 MB
printerSettings868.bin
bin • 0.01 MB
printerSettings863.bin
bin • 0.01 MB
printerSettings862.bin
bin • 0.01 MB
printerSettings861.bin
bin • 0.01 MB
printerSettings857.bin
bin • 0.01 MB
printerSettings858.bin
bin • 0.01 MB
printerSettings859.bin
bin • 0.01 MB
printerSettings860.bin
bin • 0.01 MB
printerSettings869.bin
bin • 0.00 MB
printerSettings27.bin
bin • 0.01 MB
printerSettings870.bin
bin • 0.01 MB
printerSettings878.bin
bin • 0.01 MB
printerSettings879.bin
bin • 0.01 MB
printerSettings880.bin
bin • 0.01 MB
printerSettings881.bin
bin • 0.01 MB
printerSettings877.bin
bin • 0.01 MB
printerSettings876.bin
bin • 0.01 MB
printerSettings875.bin
bin • 0.01 MB
printerSettings871.bin
bin • 0.01 MB
printerSettings872.bin
bin • 0.01 MB
printerSettings873.bin
bin • 0.01 MB
printerSettings874.bin
bin • 0.01 MB
printerSettings856.bin
bin • 0.01 MB
printerSettings855.bin
bin • 0.01 MB
printerSettings854.bin
bin • 0.01 MB
printerSettings837.bin
bin • 0.00 MB
printerSettings28.bin
bin • 0.01 MB
printerSettings838.bin
bin • 0.00 MB
printerSettings839.bin
bin • 0.01 MB
printerSettings836.bin
bin • 0.01 MB
printerSettings835.bin
bin • 0.01 MB
printerSettings834.bin
bin • 0.01 MB
printerSettings831.bin
bin • 0.01 MB
printerSettings832.bin
bin • 0.00 MB
printerSettings29.bin
bin • 0.01 MB
printerSettings833.bin
bin • 0.00 MB
printerSettings840.bin
bin • 0.01 MB
printerSettings841.bin
bin • 0.01 MB
printerSettings842.bin
bin • 0.01 MB
printerSettings850.bin
bin • 0.00 MB
printerSettings851.bin
bin • 0.01 MB
printerSettings852.bin
bin • 0.01 MB
printerSettings853.bin
bin • 0.01 MB
printerSettings849.bin
bin • 0.01 MB
printerSettings848.bin
bin • 0.00 MB
printerSettings847.bin
bin • 0.01 MB
printerSettings843.bin
bin • 0.01 MB
printerSettings844.bin
bin • 0.01 MB
printerSettings845.bin
bin • 0.01 MB
printerSettings846.bin
bin • 0.01 MB
printerSettings882.bin
bin • 0.01 MB
printerSettings883.bin
bin • 0.01 MB
printerSettings884.bin
bin • 0.01 MB
printerSettings14.bin
bin • 0.01 MB
printerSettings13.bin
bin • 0.01 MB
printerSettings12.bin
bin • 0.01 MB
printerSettings11.bin
bin • 0.01 MB
printerSettings10.bin
bin • 0.01 MB
printerSettings15.bin
bin • 0.01 MB
printerSettings16.bin
bin • 0.01 MB
printerSettings17.bin
bin • 0.01 MB
printerSettings21.bin
bin • 0.01 MB
printerSettings20.bin
bin • 0.01 MB
printerSettings19.bin
bin • 0.01 MB
printerSettings18.bin
bin • 0.01 MB
printerSettings9.bin
bin • 0.01 MB
printerSettings8.bin
bin • 0.01 MB
printerSettings7.bin
bin • 0.01 MB
externalLink1.xml
xml • 0.01 MB
externalLink1.xml.rels
rels • 0.00 MB
externalLink2.xml.rels
rels • 0.00 MB
revisionHeaders.xml.rels
rels • 0.00 MB
externalLink2.xml
xml • 0.00 MB
printerSettings1.bin
bin • 0.01 MB
printerSettings2.bin
bin • 0.01 MB
printerSettings6.bin
bin • 0.01 MB
printerSettings5.bin
bin • 0.01 MB
printerSettings4.bin
bin • 0.01 MB
printerSettings3.bin
bin • 0.01 MB
printerSettings22.bin
bin • 0.01 MB
printerSettings23.bin
bin • 0.01 MB
printerSettings24.bin
bin • 0.01 MB
printerSettings892.bin
bin • 0.01 MB
printerSettings893.bin
bin • 0.01 MB
printerSettings894.bin
bin • 0.01 MB
printerSettings895.bin
bin • 0.01 MB
printerSettings891.bin
bin • 0.01 MB
printerSettings890.bin
bin • 0.01 MB
printerSettings889.bin
bin • 0.01 MB
printerSettings885.bin
bin • 0.01 MB
printerSettings886.bin
bin • 0.01 MB
printerSettings887.bin
bin • 0.01 MB
printerSettings888.bin
bin • 0.01 MB
printerSettings896.bin
bin • 0.01 MB
printerSettings897.bin
bin • 0.01 MB
printerSettings898.bin
bin • 0.01 MB
userNames.xml
xml • 0.00 MB
core.xml
xml • 0.00 MB
app.xml
xml • 0.00 MB
printerSettings25.bin
bin • 0.01 MB
revisionLog1.xml
xml • 0.00 MB
revisionHeaders.xml
xml • 0.00 MB
printerSettings26.bin
bin • 0.01 MB
printerSettings899.bin
bin • 0.01 MB
printerSettings900.bin
bin • 0.01 MB
printerSettings901.bin
bin • 0.01 MB
calcChain.xml
xml • 0.01 MB
printerSettings830.bin
bin • 0.01 MB
printerSettings829.bin
bin • 0.01 MB
printerSettings828.bin
bin • 0.01 MB
printerSettings755.bin
bin • 0.01 MB
printerSettings756.bin
bin • 0.01 MB
printerSettings757.bin
bin • 0.01 MB
printerSettings758.bin
bin • 0.01 MB
printerSettings759.bin
bin • 0.01 MB
printerSettings754.bin
bin • 0.01 MB
printerSettings753.bin
bin • 0.01 MB
printerSettings752.bin
bin • 0.00 MB
printerSettings749.bin
bin • 0.01 MB
printerSettings750.bin
bin • 0.01 MB
printerSettings751.bin
bin • 0.00 MB
printerSettings32.bin
bin • 0.01 MB
printerSettings760.bin
bin • 0.01 MB
printerSettings761.bin
bin • 0.01 MB
printerSettings762.bin
bin • 0.01 MB
printerSettings770.bin
bin • 0.01 MB
printerSettings771.bin
bin • 0.01 MB
printerSettings772.bin
bin • 0.01 MB
printerSettings773.bin
bin • 0.01 MB
printerSettings769.bin
bin • 0.01 MB
printerSettings768.bin
bin • 0.01 MB
printerSettings767.bin
bin • 0.01 MB
printerSettings763.bin
bin • 0.01 MB
printerSettings764.bin
bin • 0.01 MB
printerSettings765.bin
bin • 0.01 MB
printerSettings766.bin
bin • 0.01 MB
printerSettings748.bin
bin • 0.01 MB
printerSettings747.bin
bin • 0.01 MB
printerSettings746.bin
bin • 0.01 MB
printerSettings728.bin
bin • 0.01 MB
printerSettings729.bin
bin • 0.01 MB
printerSettings730.bin
bin • 0.01 MB
printerSettings731.bin
bin • 0.01 MB
printerSettings727.bin
bin • 0.01 MB
printerSettings726.bin
bin • 0.01 MB
printerSettings725.bin
bin • 0.01 MB
printerSettings33.bin
bin • 0.01 MB
printerSettings722.bin
bin • 0.00 MB
printerSettings723.bin
bin • 0.01 MB
printerSettings724.bin
bin • 0.01 MB
printerSettings732.bin
bin • 0.00 MB
printerSettings733.bin
bin • 0.01 MB
printerSettings503.bin
bin • 0.01 MB
printerSettings742.bin
bin • 0.01 MB
printerSettings743.bin
bin • 0.01 MB
printerSettings744.bin
bin • 0.01 MB
printerSettings745.bin
bin • 0.01 MB
printerSettings741.bin
bin • 0.01 MB
printerSettings740.bin
bin • 0.01 MB
printerSettings739.bin
bin • 0.01 MB
printerSettings735.bin
bin • 0.00 MB
printerSettings736.bin
bin • 0.01 MB
printerSettings737.bin
bin • 0.01 MB
printerSettings738.bin
bin • 0.01 MB
printerSettings774.bin
bin • 0.01 MB
printerSettings775.bin
bin • 0.00 MB
printerSettings31.bin
bin • 0.01 MB
printerSettings811.bin
bin • 0.00 MB
printerSettings30.bin
bin • 0.01 MB
printerSettings812.bin
bin • 0.00 MB
printerSettings813.bin
bin • 0.01 MB
printerSettings810.bin
bin • 0.01 MB
printerSettings809.bin
bin • 0.01 MB
printerSettings808.bin
bin • 0.01 MB
printerSettings804.bin
bin • 0.01 MB
printerSettings805.bin
bin • 0.01 MB
printerSettings806.bin
bin • 0.01 MB
printerSettings807.bin
bin • 0.01 MB
printerSettings814.bin
bin • 0.01 MB
printerSettings815.bin
bin • 0.01 MB
printerSettings816.bin
bin • 0.01 MB
printerSettings824.bin
bin • 0.01 MB
printerSettings825.bin
bin • 0.01 MB
printerSettings826.bin
bin • 0.01 MB
printerSettings827.bin
bin • 0.01 MB
printerSettings823.bin
bin • 0.01 MB
printerSettings822.bin
bin • 0.01 MB
printerSettings821.bin
bin • 0.01 MB
printerSettings817.bin
bin • 0.01 MB
printerSettings818.bin
bin • 0.01 MB
printerSettings819.bin
bin • 0.01 MB
printerSettings820.bin
bin • 0.01 MB
printerSettings803.bin
bin • 0.01 MB
printerSettings802.bin
bin • 0.01 MB
printerSettings801.bin
bin • 0.01 MB
printerSettings783.bin
bin • 0.01 MB
printerSettings784.bin
bin • 0.01 MB
printerSettings785.bin
bin • 0.01 MB
printerSettings786.bin
bin • 0.00 MB
printerSettings782.bin
bin • 0.01 MB
printerSettings781.bin
bin • 0.01 MB
printerSettings780.bin
bin • 0.01 MB
printerSettings776.bin
bin • 0.00 MB
printerSettings777.bin
bin • 0.01 MB
printerSettings778.bin
bin • 0.01 MB
printerSettings779.bin
bin • 0.01 MB
printerSettings787.bin
bin • 0.01 MB
printerSettings788.bin
bin • 0.01 MB
printerSettings789.bin
bin • 0.00 MB
printerSettings797.bin
bin • 0.01 MB
printerSettings798.bin
bin • 0.01 MB
printerSettings799.bin
bin • 0.01 MB
printerSettings800.bin
bin • 0.01 MB
printerSettings796.bin
bin • 0.01 MB
printerSettings795.bin
bin • 0.00 MB
printerSettings794.bin
bin • 0.00 MB
printerSettings790.bin
bin • 0.00 MB
printerSettings791.bin
bin • 0.01 MB
printerSettings792.bin
bin • 0.01 MB
printerSettings793.bin
bin • 0.00 MB
printerSettings720.bin
bin • 0.01 MB
printerSettings502.bin
bin • 0.00 MB
printerSettings501.bin
bin • 0.00 MB
printerSettings197.bin
bin • 0.00 MB
printerSettings198.bin
bin • 0.01 MB
printerSettings199.bin
bin • 0.01 MB
printerSettings200.bin
bin • 0.01 MB
printerSettings201.bin
bin • 0.01 MB
printerSettings54.bin
bin • 0.01 MB
printerSettings196.bin
bin • 0.00 MB
printerSettings195.bin
bin • 0.01 MB
printerSettings190.bin
bin • 0.01 MB
printerSettings191.bin
bin • 0.01 MB
printerSettings192.bin
bin • 0.01 MB
printerSettings193.bin
bin • 0.01 MB
printerSettings194.bin
bin • 0.01 MB
printerSettings202.bin
bin • 0.01 MB
printerSettings203.bin
bin • 0.01 MB
printerSettings204.bin
bin • 0.01 MB
printerSettings212.bin
bin • 0.01 MB
printerSettings213.bin
bin • 0.01 MB
printerSettings214.bin
bin • 0.00 MB
printerSettings215.bin
bin • 0.01 MB
printerSettings216.bin
bin • 0.01 MB
printerSettings211.bin
bin • 0.00 MB
printerSettings210.bin
bin • 0.00 MB
printerSettings209.bin
bin • 0.00 MB
printerSettings205.bin
bin • 0.01 MB
printerSettings206.bin
bin • 0.01 MB
printerSettings207.bin
bin • 0.00 MB
printerSettings208.bin
bin • 0.01 MB
printerSettings189.bin
bin • 0.01 MB
printerSettings188.bin
bin • 0.01 MB
printerSettings187.bin
bin • 0.01 MB
printerSettings167.bin
bin • 0.01 MB
printerSettings168.bin
bin • 0.01 MB
printerSettings169.bin
bin • 0.01 MB
printerSettings170.bin
bin • 0.01 MB
printerSettings171.bin
bin • 0.00 MB
printerSettings166.bin
bin • 0.01 MB
printerSettings165.bin
bin • 0.01 MB
printerSettings164.bin
bin • 0.01 MB
ctrlProp18.xml
xml • 0.00 MB
printerSettings161.bin
bin • 0.00 MB
printerSettings162.bin
bin • 0.01 MB
printerSettings163.bin
bin • 0.01 MB
printerSettings172.bin
bin • 0.01 MB
printerSettings173.bin
bin • 0.00 MB
printerSettings174.bin
bin • 0.00 MB
printerSettings182.bin
bin • 0.01 MB
printerSettings183.bin
bin • 0.01 MB
printerSettings184.bin
bin • 0.01 MB
printerSettings185.bin
bin • 0.01 MB
printerSettings186.bin
bin • 0.01 MB
printerSettings181.bin
bin • 0.01 MB
printerSettings180.bin
bin • 0.01 MB
printerSettings179.bin
bin • 0.01 MB
printerSettings175.bin
bin • 0.00 MB
printerSettings176.bin
bin • 0.01 MB
printerSettings177.bin
bin • 0.01 MB
printerSettings178.bin
bin • 0.00 MB
printerSettings217.bin
bin • 0.01 MB
printerSettings218.bin
bin • 0.01 MB
printerSettings219.bin
bin • 0.01 MB
printerSettings256.bin
bin • 0.01 MB
printerSettings257.bin
bin • 0.01 MB
printerSettings258.bin
bin • 0.01 MB
printerSettings259.bin
bin • 0.01 MB
printerSettings260.bin
bin • 0.01 MB
printerSettings255.bin
bin • 0.01 MB
printerSettings254.bin
bin • 0.01 MB
printerSettings253.bin
bin • 0.01 MB
printerSettings249.bin
bin • 0.01 MB
printerSettings250.bin
bin • 0.00 MB
printerSettings251.bin
bin • 0.01 MB
printerSettings252.bin
bin • 0.01 MB
printerSettings261.bin
bin • 0.01 MB
printerSettings262.bin
bin • 0.01 MB
printerSettings263.bin
bin • 0.01 MB
printerSettings270.bin
bin • 0.01 MB
printerSettings271.bin
bin • 0.01 MB
printerSettings272.bin
bin • 0.01 MB
printerSettings273.bin
bin • 0.01 MB
printerSettings274.bin
bin • 0.01 MB
printerSettings269.bin
bin • 0.00 MB
printerSettings52.bin
bin • 0.01 MB
printerSettings268.bin
bin • 0.00 MB
printerSettings264.bin
bin • 0.01 MB
printerSettings265.bin
bin • 0.01 MB
printerSettings266.bin
bin • 0.01 MB
printerSettings267.bin
bin • 0.01 MB
printerSettings248.bin
bin • 0.01 MB
printerSettings247.bin
bin • 0.00 MB
printerSettings246.bin
bin • 0.00 MB
printerSettings227.bin
bin • 0.01 MB
printerSettings228.bin
bin • 0.01 MB
printerSettings229.bin
bin • 0.01 MB
printerSettings230.bin
bin • 0.01 MB
printerSettings231.bin
bin • 0.01 MB
printerSettings226.bin
bin • 0.01 MB
printerSettings225.bin
bin • 0.01 MB
printerSettings224.bin
bin • 0.01 MB
printerSettings220.bin
bin • 0.01 MB
printerSettings221.bin
bin • 0.01 MB
printerSettings222.bin
bin • 0.01 MB
printerSettings223.bin
bin • 0.01 MB
printerSettings232.bin
bin • 0.00 MB
printerSettings53.bin
bin • 0.01 MB
printerSettings233.bin
bin • 0.00 MB
printerSettings241.bin
bin • 0.01 MB
printerSettings242.bin
bin • 0.01 MB
printerSettings243.bin
bin • 0.00 MB
printerSettings244.bin
bin • 0.01 MB
printerSettings245.bin
bin • 0.00 MB
printerSettings240.bin
bin • 0.01 MB
printerSettings239.bin
bin • 0.01 MB
printerSettings238.bin
bin • 0.01 MB
printerSettings234.bin
bin • 0.01 MB
printerSettings235.bin
bin • 0.01 MB
printerSettings236.bin
bin • 0.01 MB
printerSettings237.bin
bin • 0.01 MB
ctrlProp17.xml
xml • 0.00 MB
ctrlProp16.xml
xml • 0.00 MB
ctrlProp15.xml
xml • 0.00 MB
printerSettings99.bin
bin • 0.01 MB
printerSettings100.bin
bin • 0.01 MB
printerSettings101.bin
bin • 0.01 MB
printerSettings102.bin
bin • 0.01 MB
printerSettings103.bin
bin • 0.01 MB
printerSettings98.bin
bin • 0.01 MB
printerSettings97.bin
bin • 0.01 MB
printerSettings96.bin
bin • 0.01 MB
printerSettings91.bin
bin • 0.01 MB
printerSettings92.bin
bin • 0.01 MB
printerSettings93.bin
bin • 0.01 MB
printerSettings94.bin
bin • 0.01 MB
printerSettings95.bin
bin • 0.01 MB
printerSettings104.bin
bin • 0.01 MB
printerSettings105.bin
bin • 0.01 MB
printerSettings106.bin
bin • 0.01 MB
printerSettings113.bin
bin • 0.01 MB
printerSettings114.bin
bin • 0.01 MB
printerSettings115.bin
bin • 0.01 MB
printerSettings116.bin
bin • 0.01 MB
printerSettings117.bin
bin • 0.01 MB
printerSettings112.bin
bin • 0.01 MB
printerSettings111.bin
bin • 0.01 MB
printerSettings110.bin
bin • 0.01 MB
printerSettings107.bin
bin • 0.01 MB
printerSettings108.bin
bin • 0.00 MB
printerSettings58.bin
bin • 0.01 MB
printerSettings109.bin
bin • 0.00 MB
printerSettings90.bin
bin • 0.00 MB
printerSettings89.bin
bin • 0.01 MB
printerSettings88.bin
bin • 0.01 MB
printerSettings71.bin
bin • 0.01 MB
printerSettings72.bin
bin • 0.00 MB
printerSettings61.bin
bin • 0.01 MB
printerSettings60.bin
bin • 0.01 MB
printerSettings59.bin
bin • 0.01 MB
printerSettings70.bin
bin • 0.01 MB
printerSettings69.bin
bin • 0.01 MB
printerSettings68.bin
bin • 0.01 MB
printerSettings64.bin
bin • 0.01 MB
printerSettings65.bin
bin • 0.01 MB
printerSettings66.bin
bin • 0.01 MB
printerSettings67.bin
bin • 0.01 MB
printerSettings73.bin
bin • 0.00 MB
printerSettings74.bin
bin • 0.01 MB
printerSettings75.bin
bin • 0.01 MB
printerSettings83.bin
bin • 0.00 MB
printerSettings84.bin
bin • 0.01 MB
printerSettings85.bin
bin • 0.01 MB
printerSettings86.bin
bin • 0.00 MB
printerSettings87.bin
bin • 0.00 MB
printerSettings82.bin
bin • 0.01 MB
printerSettings81.bin
bin • 0.01 MB
printerSettings80.bin
bin • 0.01 MB
printerSettings76.bin
bin • 0.01 MB
printerSettings77.bin
bin • 0.01 MB
printerSettings78.bin
bin • 0.01 MB
printerSettings79.bin
bin • 0.01 MB
printerSettings118.bin
bin • 0.01 MB
printerSettings119.bin
bin • 0.00 MB
printerSettings120.bin
bin • 0.01 MB
printerSettings157.bin
bin • 0.01 MB
printerSettings158.bin
bin • 0.01 MB
printerSettings159.bin
bin • 0.01 MB
printerSettings160.bin
bin • 0.00 MB
printerSettings56.bin
bin • 0.01 MB
printerSettings156.bin
bin • 0.01 MB
printerSettings155.bin
bin • 0.01 MB
printerSettings154.bin
bin • 0.01 MB
printerSettings150.bin
bin • 0.01 MB
printerSettings151.bin
bin • 0.01 MB
printerSettings152.bin
bin • 0.01 MB
printerSettings153.bin
bin • 0.01 MB
printerSettings55.bin
bin • 0.01 MB
ctrlProp1.xml
xml • 0.00 MB
ctrlProp2.xml
xml • 0.00 MB
ctrlProp10.xml
xml • 0.00 MB
ctrlProp11.xml
xml • 0.00 MB
ctrlProp12.xml
xml • 0.00 MB
ctrlProp13.xml
xml • 0.00 MB
ctrlProp14.xml
xml • 0.00 MB
ctrlProp9.xml
xml • 0.00 MB
ctrlProp8.xml
xml • 0.00 MB
ctrlProp7.xml
xml • 0.00 MB
ctrlProp3.xml
xml • 0.00 MB
ctrlProp4.xml
xml • 0.00 MB
ctrlProp5.xml
xml • 0.00 MB
ctrlProp6.xml
xml • 0.00 MB
printerSettings149.bin
bin • 0.01 MB
printerSettings148.bin
bin • 0.01 MB
printerSettings147.bin
bin • 0.01 MB
printerSettings128.bin
bin • 0.01 MB
printerSettings129.bin
bin • 0.01 MB
printerSettings130.bin
bin • 0.01 MB
printerSettings131.bin
bin • 0.01 MB
printerSettings132.bin
bin • 0.01 MB
printerSettings127.bin
bin • 0.01 MB
printerSettings126.bin
bin • 0.00 MB
printerSettings125.bin
bin • 0.01 MB
printerSettings121.bin
bin • 0.00 MB
printerSettings122.bin
bin • 0.00 MB
printerSettings123.bin
bin • 0.00 MB
printerSettings124.bin
bin • 0.01 MB
printerSettings133.bin
bin • 0.01 MB
printerSettings134.bin
bin • 0.01 MB
printerSettings135.bin
bin • 0.01 MB
printerSettings143.bin
bin • 0.01 MB
printerSettings144.bin
bin • 0.00 MB
printerSettings57.bin
bin • 0.01 MB
printerSettings145.bin
bin • 0.00 MB
printerSettings146.bin
bin • 0.01 MB
printerSettings142.bin
bin • 0.01 MB
printerSettings141.bin
bin • 0.01 MB
printerSettings140.bin
bin • 0.01 MB
printerSettings136.bin
bin • 0.01 MB
printerSettings137.bin
bin • 0.01 MB
printerSettings138.bin
bin • 0.01 MB
printerSettings139.bin
bin • 0.01 MB
printerSettings275.bin
bin • 0.01 MB
printerSettings276.bin
bin • 0.01 MB
printerSettings277.bin
bin • 0.01 MB
printerSettings423.bin
bin • 0.00 MB
printerSettings424.bin
bin • 0.00 MB
printerSettings425.bin
bin • 0.00 MB
printerSettings426.bin
bin • 0.01 MB
printerSettings427.bin
bin • 0.01 MB
printerSettings422.bin
bin • 0.01 MB
printerSettings421.bin
bin • 0.00 MB
printerSettings420.bin
bin • 0.01 MB
printerSettings415.bin
bin • 0.01 MB
printerSettings416.bin
bin • 0.01 MB
printerSettings417.bin
bin • 0.01 MB
printerSettings418.bin
bin • 0.01 MB
printerSettings419.bin
bin • 0.01 MB
printerSettings428.bin
bin • 0.00 MB
printerSettings429.bin
bin • 0.01 MB
printerSettings430.bin
bin • 0.01 MB
printerSettings438.bin
bin • 0.01 MB
printerSettings439.bin
bin • 0.01 MB
printerSettings440.bin
bin • 0.01 MB
printerSettings441.bin
bin • 0.01 MB
printerSettings442.bin
bin • 0.01 MB
printerSettings437.bin
bin • 0.01 MB
printerSettings436.bin
bin • 0.01 MB
printerSettings435.bin
bin • 0.01 MB
printerSettings431.bin
bin • 0.01 MB
printerSettings432.bin
bin • 0.01 MB
printerSettings433.bin
bin • 0.01 MB
printerSettings434.bin
bin • 0.01 MB
printerSettings414.bin
bin • 0.01 MB
printerSettings413.bin
bin • 0.01 MB
printerSettings412.bin
bin • 0.01 MB
printerSettings393.bin
bin • 0.01 MB
printerSettings394.bin
bin • 0.01 MB
printerSettings395.bin
bin • 0.01 MB
printerSettings396.bin
bin • 0.01 MB
printerSettings397.bin
bin • 0.01 MB
printerSettings392.bin
bin • 0.01 MB
printerSettings391.bin
bin • 0.01 MB
printerSettings390.bin
bin • 0.00 MB
printerSettings386.bin
bin • 0.00 MB
printerSettings387.bin
bin • 0.01 MB
printerSettings388.bin
bin • 0.01 MB
printerSettings389.bin
bin • 0.00 MB
printerSettings398.bin
bin • 0.01 MB
printerSettings399.bin
bin • 0.01 MB
printerSettings400.bin
bin • 0.01 MB
printerSettings408.bin
bin • 0.01 MB
printerSettings409.bin
bin • 0.01 MB
printerSettings410.bin
bin • 0.00 MB
printerSettings43.bin
bin • 0.01 MB
printerSettings411.bin
bin • 0.00 MB
printerSettings407.bin
bin • 0.01 MB
printerSettings406.bin
bin • 0.01 MB
printerSettings405.bin
bin • 0.01 MB
printerSettings401.bin
bin • 0.01 MB
printerSettings402.bin
bin • 0.01 MB
printerSettings403.bin
bin • 0.01 MB
printerSettings404.bin
bin • 0.01 MB
printerSettings443.bin
bin • 0.01 MB
printerSettings444.bin
bin • 0.01 MB
printerSettings445.bin
bin • 0.01 MB
printerSettings482.bin
bin • 0.00 MB
printerSettings41.bin
bin • 0.01 MB
printerSettings483.bin
bin • 0.00 MB
printerSettings484.bin
bin • 0.01 MB
printerSettings485.bin
bin • 0.01 MB
printerSettings481.bin
bin • 0.01 MB
printerSettings480.bin
bin • 0.01 MB
printerSettings479.bin
bin • 0.01 MB
printerSettings475.bin
bin • 0.01 MB
printerSettings476.bin
bin • 0.01 MB
printerSettings477.bin
bin • 0.01 MB
printerSettings478.bin
bin • 0.01 MB
printerSettings486.bin
bin • 0.01 MB
printerSettings487.bin
bin • 0.01 MB
printerSettings488.bin
bin • 0.01 MB
printerSettings496.bin
bin • 0.00 MB
printerSettings497.bin
bin • 0.00 MB
printerSettings498.bin
bin • 0.01 MB
printerSettings499.bin
bin • 0.01 MB
printerSettings500.bin
bin • 0.00 MB
printerSettings495.bin
bin • 0.00 MB
printerSettings494.bin
bin • 0.01 MB
printerSettings493.bin
bin • 0.00 MB
printerSettings489.bin
bin • 0.01 MB
printerSettings490.bin
bin • 0.01 MB
printerSettings491.bin
bin • 0.01 MB
printerSettings492.bin
bin • 0.01 MB
printerSettings474.bin
bin • 0.01 MB
printerSettings473.bin
bin • 0.01 MB
printerSettings472.bin
bin • 0.01 MB
printerSettings452.bin
bin • 0.01 MB
printerSettings453.bin
bin • 0.01 MB
printerSettings454.bin
bin • 0.01 MB
printerSettings455.bin
bin • 0.01 MB
printerSettings456.bin
bin • 0.01 MB
printerSettings451.bin
bin • 0.01 MB
printerSettings450.bin
bin • 0.01 MB
printerSettings449.bin
bin • 0.01 MB
printerSettings446.bin
bin • 0.00 MB
printerSettings42.bin
bin • 0.01 MB
printerSettings447.bin
bin • 0.00 MB
printerSettings448.bin
bin • 0.01 MB
printerSettings457.bin
bin • 0.00 MB
printerSettings458.bin
bin • 0.01 MB
printerSettings459.bin
bin • 0.00 MB
printerSettings467.bin
bin • 0.01 MB
printerSettings468.bin
bin • 0.01 MB
printerSettings469.bin
bin • 0.01 MB
printerSettings470.bin
bin • 0.01 MB
printerSettings471.bin
bin • 0.01 MB
printerSettings466.bin
bin • 0.01 MB
printerSettings465.bin
bin • 0.01 MB
printerSettings464.bin
bin • 0.00 MB
printerSettings460.bin
bin • 0.00 MB
printerSettings461.bin
bin • 0.00 MB
printerSettings462.bin
bin • 0.01 MB
printerSettings463.bin
bin • 0.01 MB
printerSettings385.bin
bin • 0.01 MB
printerSettings384.bin
bin • 0.01 MB
printerSettings383.bin
bin • 0.01 MB
printerSettings312.bin
bin • 0.01 MB
printerSettings313.bin
bin • 0.01 MB
printerSettings314.bin
bin • 0.01 MB
printerSettings315.bin
bin • 0.01 MB
printerSettings316.bin
bin • 0.01 MB
printerSettings311.bin
bin • 0.01 MB
printerSettings310.bin
bin • 0.01 MB
printerSettings309.bin
bin • 0.01 MB
printerSettings305.bin
bin • 0.00 MB
printerSettings306.bin
bin • 0.01 MB
printerSettings307.bin
bin • 0.01 MB
printerSettings308.bin
bin • 0.01 MB
printerSettings317.bin
bin • 0.01 MB
printerSettings318.bin
bin • 0.01 MB
printerSettings319.bin
bin • 0.01 MB
printerSettings48.bin
bin • 0.01 MB
ctrlProp20.xml
xml • 0.00 MB
printerSettings326.bin
bin • 0.00 MB
printerSettings327.bin
bin • 0.01 MB
printerSettings328.bin
bin • 0.01 MB
printerSettings49.bin
bin • 0.01 MB
printerSettings325.bin
bin • 0.00 MB
printerSettings324.bin
bin • 0.01 MB
printerSettings320.bin
bin • 0.01 MB
printerSettings321.bin
bin • 0.01 MB
printerSettings322.bin
bin • 0.01 MB
printerSettings323.bin
bin • 0.01 MB
ctrlProp19.xml
xml • 0.00 MB
printerSettings50.bin
bin • 0.00 MB
printerSettings51.bin
bin • 0.00 MB
printerSettings285.bin
bin • 0.01 MB
printerSettings286.bin
bin • 0.00 MB
printerSettings287.bin
bin • 0.00 MB
printerSettings288.bin
bin • 0.00 MB
printerSettings289.bin
bin • 0.01 MB
printerSettings284.bin
bin • 0.01 MB
printerSettings283.bin
bin • 0.00 MB
printerSettings282.bin
bin • 0.00 MB
printerSettings278.bin
bin • 0.01 MB
printerSettings279.bin
bin • 0.00 MB
printerSettings280.bin
bin • 0.01 MB
printerSettings281.bin
bin • 0.00 MB
printerSettings290.bin
bin • 0.01 MB
printerSettings291.bin
bin • 0.01 MB
printerSettings292.bin
bin • 0.01 MB
printerSettings300.bin
bin • 0.01 MB
printerSettings301.bin
bin • 0.01 MB
printerSettings302.bin
bin • 0.01 MB
printerSettings303.bin
bin • 0.01 MB
printerSettings304.bin
bin • 0.00 MB
printerSettings299.bin
bin • 0.01 MB
printerSettings298.bin
bin • 0.01 MB
printerSettings297.bin
bin • 0.01 MB
printerSettings293.bin
bin • 0.01 MB
printerSettings294.bin
bin • 0.01 MB
printerSettings295.bin
bin • 0.01 MB
printerSettings296.bin
bin • 0.01 MB
printerSettings329.bin
bin • 0.01 MB
printerSettings330.bin
bin • 0.01 MB
printerSettings331.bin
bin • 0.01 MB
printerSettings366.bin
bin • 0.01 MB
printerSettings367.bin
bin • 0.01 MB
printerSettings368.bin
bin • 0.01 MB
printerSettings369.bin
bin • 0.01 MB
printerSettings370.bin
bin • 0.01 MB
printerSettings365.bin
bin • 0.01 MB
printerSettings364.bin
bin • 0.01 MB
printerSettings363.bin
bin • 0.01 MB
printerSettings359.bin
bin • 0.00 MB
printerSettings360.bin
bin • 0.01 MB
printerSettings361.bin
bin • 0.01 MB
printerSettings362.bin
bin • 0.01 MB
printerSettings371.bin
bin • 0.01 MB
printerSettings372.bin
bin • 0.01 MB
printerSettings373.bin
bin • 0.01 MB
printerSettings378.bin
bin • 0.01 MB
printerSettings379.bin
bin • 0.01 MB
printerSettings380.bin
bin • 0.01 MB
printerSettings381.bin
bin • 0.01 MB
printerSettings382.bin
bin • 0.01 MB
printerSettings377.bin
bin • 0.01 MB
printerSettings376.bin
bin • 0.00 MB
ctrlProp22.xml
xml • 0.00 MB
printerSettings374.bin
bin • 0.01 MB
printerSettings375.bin
bin • 0.00 MB
printerSettings45.bin
bin • 0.01 MB
printerSettings44.bin
bin • 0.01 MB
printerSettings358.bin
bin • 0.00 MB
printerSettings357.bin
bin • 0.00 MB
printerSettings356.bin
bin • 0.01 MB
printerSettings339.bin
bin • 0.00 MB
printerSettings47.bin
bin • 0.01 MB
printerSettings46.bin
bin • 0.01 MB
ctrlProp21.xml
xml • 0.00 MB
printerSettings340.bin
bin • 0.00 MB
printerSettings338.bin
bin • 0.01 MB
printerSettings337.bin
bin • 0.01 MB
printerSettings336.bin
bin • 0.01 MB
printerSettings332.bin
bin • 0.01 MB
printerSettings333.bin
bin • 0.01 MB
printerSettings334.bin
bin • 0.01 MB
printerSettings335.bin
bin • 0.01 MB
printerSettings341.bin
bin • 0.01 MB
printerSettings342.bin
bin • 0.01 MB
printerSettings343.bin
bin • 0.01 MB
printerSettings351.bin
bin • 0.01 MB
printerSettings352.bin
bin • 0.00 MB
printerSettings353.bin
bin • 0.00 MB
printerSettings354.bin
bin • 0.00 MB
printerSettings355.bin
bin • 0.01 MB
printerSettings350.bin
bin • 0.00 MB
printerSettings349.bin
bin • 0.01 MB
printerSettings348.bin
bin • 0.01 MB
printerSettings344.bin
bin • 0.01 MB
printerSettings345.bin
bin • 0.01 MB
printerSettings346.bin
bin • 0.01 MB
printerSettings347.bin
bin • 0.01 MB
printerSettings62.bin
bin • 0.01 MB
00_Cover Pages _Volume-III.doc
doc • 0.81 MB
01_Attachment-3(QR)_TW01.doc
doc • 0.11 MB
02-Attachment-8- MAF_TW01.doc
doc • 0.04 MB
03-Attachment-18-SAFETY PACT.docx
docx • 0.03 MB
04_ Attachment 20_KMP-Declaration.doc
doc • 0.05 MB
05_Attachment-21- Authorization Certificate issued by Domestic Manufacturer I&S.docx
docx • 0.02 MB
06_Attachment-22- Affidavit for Self Certification reg Domestic Value Addition I&S.docx
docx • 0.02 MB
07_Attachment-23- Affidavit for self-Certification reg PPP-MII.DOCX
docx • 0.02 MB
08_Attachment-24- Certificate from Auditor reg PPP-MII.docx
docx • 0.02 MB
09_Attachment-25-Compliance to the process related to the e-RA.docx
docx • 0.02 MB
10_Attachment-26_Declaration regarding events encountered.docx
docx • 0.03 MB
11_Attachment-27-Certification by the Bidder as per DoE Order.docx
docx • 0.02 MB
12_Legends.pdf
pdf • 0.03 MB
Rod Type Earthing.pdf
pdf • 0.15 MB
Standard drum Drawing Conductor & Earth Wire.pdf
pdf • 0.71 MB
Steel Drum Drawing (HTLS Conductor).pdf
pdf • 0.25 MB
Tower & Access R1.pdf
pdf • 2.86 MB
Wooden Drum Drawing (HTLS Conductor).pdf
pdf • 0.22 MB
132kV-765kV DC std hw (Part-6).pdf
pdf • 3.53 MB
220 KV SISP WITH BALANCING WT Model (1).pdf
pdf • 0.08 MB
220KV DT.pdf
pdf • 0.11 MB
500HVDC- 765SC string drg.pdf
pdf • 0.86 MB
800kV HVDC string drg.pdf
pdf • 1.63 MB
BIRD DIVERTER DRAWING.pdf
pdf • 0.07 MB
bird gurad for V String.pdf
pdf • 0.35 MB
Chemical Counterpoise.pdf
pdf • 0.10 MB
Chemical Pipe Type.pdf
pdf • 0.10 MB
Covered grading Ring Drawing.pdf
pdf • 0.62 MB
Extension application scheme.pdf
pdf • 0.06 MB
GA_A_PROP TYPE SST Model (1).pdf
pdf • 0.17 MB
HARD ROCK EARTHING.pdf
pdf • 0.19 MB
Individual Leg SST.pdf
pdf • 0.58 MB
Insulator Packing drawing PVC type.pdf
pdf • 0.88 MB
Insulator Packing drawing.pdf
pdf • 0.09 MB
pile earthing Drawing.pdf
pdf • 0.30 MB
Revised Bird Guard Sheet 1 of 2.pdf
pdf • 0.10 MB
Revised Bird Guard Sheet 2 of 2 .pdf
pdf • 0.11 MB
132kV-765kV DC std hw (Part-5).pdf
pdf • 8.03 MB
132kV-765kV DC std hw (Part-4).pdf
pdf • 8.39 MB
132kV-765kV DC std hw (Part-3).pdf
pdf • 7.94 MB
132kV-765kV DC std hw (Part-2).pdf
pdf • 10.32 MB
132kV and 220kV Typical Tower.pdf
pdf • 0.04 MB
132kV-765kV DC std hw (Part-1).pdf
pdf • 9.30 MB
10_1 Section X OPGW.pdf
pdf • 4.14 MB
12_Section XII FAQ.pdf
pdf • 0.37 MB
07_2 Section VII A (SMQP of Conductor).pdf
pdf • 4.76 MB
07_3 Section VII B HTLS Conductor Rev-3(Jan'2022).pdf
pdf • 0.98 MB
08_1 Section VIII Composite Longrod Insulator, Rev-2(Jan'2022).pdf
pdf • 1.09 MB
09_1 Section-IX Pile Foundaton,Rev-2(Feb'2022).pdf
pdf • 1.13 MB
05_1 Section V Earthwire.pdf
pdf • 0.37 MB
05_2 Section V (MQP for Earthwire).pdf
pdf • 0.90 MB
06_1 Section VI A Hardware Fittings Clamp and Accessories for Conductor & Earthwire Rev-2(Jan'22).pdf
pdf • 4.24 MB
06_2 Section VI B Clamp fittings and Accessories for HTLS Conductor,Rev-2(Jan'2022).pdf
pdf • 1.14 MB
07_1 Section VII A Conductor,Rev-2(Jan'2022).pdf
pdf • 1.15 MB
04_5 Section IVC Appendix II(Part-A) Precommissioning procedure, Rev-1 (Sept'2021).pdf
pdf • 1.89 MB
04_5 Section IVC Appendix II(Part-B) Precommissioning Formats, Rev-1 (Sept'2021).pdf
pdf • 2.38 MB
04_6 Section IVC Appendix III (SMQP of Trasnmission Line Tower.pdf
pdf • 3.40 MB
04_7 Section IVD Foundation (Contractor design),Rev-3(Apr'2022).pdf
pdf • 0.37 MB
04_8 Section IVE Foundation (Employer design),Rev-2(Jan'2022).pdf
pdf • 0.75 MB
04_9 Section IVF MonopoleRev-0(Feb'2022).pdf
pdf • 1.03 MB
01_1 Section 1A Scope Rev-4(Apr'2022).pdf
pdf • 0.30 MB
01_2 Section IB General InformationRev-4(Apr'2022).pdf
pdf • 0.99 MB
02 Section II General Tehnical Conditions,Rev-2(Feb'2022).pdf
pdf • 0.84 MB
03_1 Section III Survey & Soil Investigation,Rev-2(Jan'2022).pdf
pdf • 0.91 MB
03_2 Section III Annexure-A(Format for site BOQ).pdf
pdf • 1.70 MB
03_3 Section III Annexure B-C-D-E(Formats for other site data).pdf
pdf • 0.48 MB
04_1 Section IVA Tower Design,Rev-4(Apr'2022).pdf
pdf • 0.33 MB
04_2 Section IVB Tower Testing,Rev-1(Sept'2021).pdf
pdf • 0.98 MB
04_3 Section IVC Fabrication, Erection & Stringing,Rev-3(Feb'2022).pdf
pdf • 1.00 MB
04_4 Section IVC Appendix I (List of T&P).pdf
pdf • 0.83 MB
00_Cover Pages _Volume-I.doc
doc • 0.81 MB
01_Main Index_Volume-I.pdf
pdf • 0.24 MB
02_Section-I_Invitation for Bids (IFB).docx
docx • 0.05 MB
03_Section-II_Instructions to Bidders (ITB)_PRANIT_July 2021.pdf
pdf • 0.75 MB
04_Section-III_Bid Data Sheets (BDS).docx
docx • 0.06 MB
05_Annexure-A (BDS).docx
docx • 0.03 MB
06_Annexure-B (BDS).pdf
pdf • 0.65 MB
07_Annexure-C(BDS).docx
docx • 0.03 MB
08_Section-IV_General Conditions of Contract (GCC).pdf
pdf • 1.93 MB
09_Section-V_Special Conditions of Contract (SCC).docx
docx • 0.05 MB
10_Appendix-I to SCC.pdf
pdf • 0.39 MB
11_Section - VI_Sample Forms and Procedures (SFP).doc
doc • 0.52 MB
OBD_EXTN_LETTER_TL01.docx
docx • 0.19 MB
Amendment No-04.doc
doc • 0.07 MB
OBD_EXTN_LETTER-03_TL01.docx
docx • 0.19 MB
Revised Bird Diverter drawing.pdf
pdf • 0.07 MB
OBD_EXTN_LETTER-02_TL01.docx
docx • 0.19 MB
OBD_EXTN_LETTER_TL01.docx
docx • 0.19 MB
First Envelope and Bid Forms-rev01.xls
xls • 2.51 MB
Amendment No-01.doc
doc • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .