Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical NEW COLONY NEAR SUB STATION OBRA SONBHADRA U P | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹12.0 L
EMD Value
₹24,000
Closing Date
29 Oct 2026, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, R.C.C.M.D.,Pipri-Sonebhadra.
Office Of The Executive Engineer, Rihand Colony Civil Maintenance Division, U.P. Rajya Vidyut Utpadan Nigam Limited, Turra Pipri Sonebhadra.U.P. Pin- 231221
Annual General Maintenance and repair of civil works in the Residences of Personnels of HOPS Obra at Obra Residential Colony, Sonebhadra U.P.
2026_UPJVN_1191382_1
E-Tender Notice No. 15/RCCMD/2026-27
Open Tender
Civil Works
Fixed-rate
365 days
Obra Residential Colony, Sonebhadra U.P.
Qualified as PQC
3 documents required · 3 mandatory
₹1,416
Yes
EEEGD U.P. RAJYA VIDYUT UTPADAN NIGAM LTD.
₹24,000
Yes
31 Oct 2026
30 Sept 2026
31 Oct 2026
30 Sept 2026
29 Oct 2026
30 Sept 2026
180 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Engagement of fitter/plumber for non measured work in repair and maintenance work in internal /external water supply pipe line as per direction of engineer-in-charge with all T&P required (Labour rates only). | 55 | Per day | 986.7 | ₹54,268.5 |
| 2 | Engagement of carpenter for non-measured work in repair and maintenance of wood work as per direction of Engineer-in-charge with all T&P required (Labour rates only). | 55 | Per Day | 897.6 | ₹49,368 |
| 3 | Engagement of helper/ Beldar for non-measured work such as helping carpenter, plumber and other miscellaneous work as per direction of Engineer-in-charge. | 120 | Per Day | 809.6 | ₹97,152 |
| 4 | Excavation in foundation in soil mixed with moorum/ shingle/kankar requiring the use of special such T&P such as pickaxes, sabbals etc. including lift upto 1.5 meter and lead upto 30 meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building & sides of the foundation. | 4 | Cum | 288 | ₹1,152 |
| 5 | Concrete with 4cm. gauge stone ballast down graded, coarse sand of 2.5 fineness modulus and cement in proportion of 1:3:6 in foundation and under floors including cost of all materials, labour, tools and plants etc. required for proper completion of work. | 6 | Cum | 5,311 | ₹31,866 |
| 6 | Providing and laying in position cement concrete of 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) excluding the cost of centering and shuttering - All work up to plinth level | 5 | Cum | 5,737 | ₹28,685 |
| 7 | R.C.C. work with cement, approved coarse sand and 2 cm gauge approved stone ballast in the proportion of 1:1.5:3 for slabs with coarse sand excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G. binding wire and also including cost of all materials. cost of binding wire, labour and T&P etc. required for proper completion of work. | 1 | Cum | 6,586 | ₹6,586 |
| 8 | 1st class brick work in 1:6 cement and coarse sand of 2.25 F.M. mortars in foundation and plinth including cost of all material, labour and T&P etc. required for proper completion of work. | 5 | Cum | 5,193 | ₹25,965 |
| 9 | 1st class brick work in 1:6 cement and coarse sand of 2.25 F.M. mortars in super structure including necessary cutting and moulding of brick as required and also including honey comb brick work, thickness of wall shall not be less than one brick thick. (230mm). | 5 | Cum | 6,630 | ₹33,150 |
| 10 | 1st class brick work in 1:4 cement and coarse sand of 2.25 F.M. mortars in super structure including necessary cutting and moulding of brick as required and also including honey comb brick work, thickness of wall shall not be less than half brick thick. (115mm). | 3 | Cum | 7,622 | ₹22,866 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
BOQ_2246910.xls
BOQ • 0.27 MB
CorrigendumT-15.pdf
PDF • 1.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .