| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.3 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹7.6 L+₹28,079.98 (3.86%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹8.9 L+₹1.6 L (22.6%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹9.4 L+₹2.1 L (28.8%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹9.6 L+₹2.4 L (32.5%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹14.4 L
EMD Value
₹28,800
Closing Date
7 Sept 2026, 6:00 pmClosed
Executive Engineer PWD RandB PROJECT DIVISION III
Office of the PWD RandB PROJECT DIVISION III JAMMU
Laying of chequered tiles in U block, between Q and R block, between S and T block and some other allied works at Toph Sherkhania, Jammu. CNO-148 P
2026_PWDJK_322783_7
Short e-NIT No. 48 of 2026-2027 Dated 31-08-2026
Open Tender
Civil Works
Percentage
60 days
JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer PWD RandB PROJECT DIVISION III
₹28,800
Office of the PWD RandB PROJECT DIVISION III JAMMU
24 Sept 2026
31 Aug 2026
8 Sept 2026
31 Aug 2026
7 Sept 2026
31 Aug 2026
3 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of flexible pavement (bituminous courses) by mechanicalmeans and disposal of dismantled material upto a lead of 1 kilometer, asper direction of Engineer-in-charge. | 155.31 | cum | 336.3 | ₹52,230.75 |
| 2 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 73.77 | cum | 5,202.9 | ₹3,83,817.93 |
| 3 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 57.78 | cum | 5,673.4 | ₹3,27,809.05 |
| 4 | Chequerred precast cement concrete tiles 22mm thick in footpath andcourtyard, jointed with neat cement slurry mixed with pigment to matchthe shade of the tiles, including rubbing, cleaning and curing complete,on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand) .Dark shade using ordinary cement. | 671.47 | sqm | 971.15 | ₹6,52,098.09 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for:Foundations, footings, bases of columns etc. for mass concrete. | 46.45 | sqm | 286.35 | ₹13,300.96 |
| 6 | Engaging trolley for removal of mulba beyond municipal limits | 3 | each | 1,000 | ₹3,000 |
| 7 | Engaging Labour for site clearance after completion of work | 14 | day | 553 | ₹7,742 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.76 MB
BOQ_1084164.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .