| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 CrAccepted-Finance | ₹3.9 Cr | L1 | Accepted-Finance ACCEPTED |
| 2 | L2₹3.9 Cr+₹2.0 L (0.51%)Accepted-Finance | ₹3.9 Cr+₹2.0 L (0.51%) | L2 | Accepted-Finance ACCEPTED |
| Sl No | Description | Qty | Unit | N.SUBRAMANIAN L2 | Venkatachalam Contractor L1 |
|---|---|---|---|---|---|
| 1.00Providing New Formation of Bitumen Road in the Eastern Side of Arulmigu Bannari Mariamman temple, Bannari,sathyamangalam taluk, Erode district.under HR&CE announcement no. 142 in the year 2025-2026 | |||||
| 2.00 | Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines , grades and cross sections shown in the drawings or as indicated by the Engineer using Carted Eath with a lead of 5 km for leveling the basement (Morth No. 111, 112, 301, 305, 900) | 2,725 | Cubic meter | 127 ₹3,46,075 | 125 ₹3,40,625 Lowest |
| 3.00 | Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 of MORTH Specification- for grading- V Material
(Morth No. 111, 112, 401, 900) | 880 | Cubic meter | 2,035 ₹17,90,800 | 2,030 ₹17,86,400 Lowest |
| 4.00 | Wet Mix Macadam (Table 400-13) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, Complete as per clause 406 of MORTH Specification.
(Morth No. 111, 112, 406, 900) | 1,363 | Cubic meter | 2,245 ₹30,59,935 | 2,240 ₹30,53,120 Lowest |
| 5.00 | Prime coat Providing and applying primer coat with bitumen emulsion (SS-I type) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per clause 502 of MORTH Specification over WMM
(Morth No. 111, 112, 501, 502, 900) | 5,450 | Squar Meter | 92 ₹5,01,400 | 90 ₹4,90,500 Lowest |
| 6.00 | Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification- over granular surfaces treated with primer
(Morth No. 111, 112, 501, 502, 900) | 5,450 | Square Meter | 22 ₹1,19,900 | 20 ₹1,09,000 Lowest |
| 7.00 | Dense Graded Bituminous Macadam (Table - 500-10) Providing and laying dense bituminous macadam with Hot Mix Plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade- 30) at percentage specified by Job Mix Formula by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolled as per clause 501.6 and 501.7 to achieve the desired compaction, as per clause No.505 of MoRTH specification Grading II 50mm thick
(Morth No. 111, 112, 501, 505, 900) | 355 | Cubic meter | 10,730 ₹38,09,150 | 10,700 ₹37,98,500 Lowest |
| 8.00 | Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH Specification complete in all respects - Grading II
(Morth No. 111, 112, 501, 507,900) | 164 | Cubic meter | 11,675 ₹19,14,700 | 11,670 ₹19,13,880 Lowest |
| 9.00 | Excavation for Roadway and drainage Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines. Grades and cross sections shown in the drawings or as indicated by the Engineer, as per MORTH Specification for making of berms
(Morth No. 112, 301, 305, 900) | 234 | Cubic meter | 245 ₹57,330 | 240 ₹56,160 Lowest |
| 10.00 | Providing and laying of hot applied thermoplastic compound 2.5 mm, thick including reflectorising glass beads @ 250 gms. Per sqm . area , thickness of 2.5 mm. is exclusive of surface applied glass beads as per IRC : 35. The finished surface to be level, uniform and free form streaks and holes etc. complete (as per MORT & H Specification HW-W0089) | 223.8 | Square Meter | 920 ₹2,05,896 | 900 ₹2,01,420 Lowest |
Tender Value
Refer Docs
EMD Value
₹2.0 L
Closing Date
26 Sept 2025, 12:30 pmClosed
DEPUTY COMMISSIONER/EXECUTIVE OFFICER
ARULMIGU BANNARI MARIAMMANTEMPLE, BANNARI,SATHYAMANGALAM TALUK,ERODE DISTRICT
PROVIDING NEW FORMATION OF ROAD IN THE EASTERN SIDE OF ARULMIGU BANNARI MARIAMMANTEMPLE, BANNARI,SATHYAMANGALAM TALUK,ERODE DISTRICT
2025_HRCE_602465_1
DIPR/4856/TENDER/2025
Open Tender
Civil Works
Item Rate
180 days
ARULMIGU BANNARI MARIAMMANTEMPLE, BANNARI, SATHYAMA
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹2.0 L
Yes
29 Sept 2025
10 Sept 2025
26 Sept 2025
10 Sept 2025
26 Sept 2025
18 Sept 2025
Amount
Providing New Formation of Bitumen Road in the Eastern Side of Arulmigu Bannari Mariamman temple, Bannari,sathyamangalam taluk, Erode district.under HR&CE announcement no. 142 in the year 2025-2026
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines , grades and cross sections shown in the drawings or as indicated by the Engineer using Carted Eath with a lead of 5 km for leveling the basement (Morth No. 111, 112, 301, 305, 900)
Granular Sub-base with Graded Material (Table:- 400-1) - Plant Mix Method Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 of MORTH Specification- for grading- V Material (Morth No. 111, 112, 401, 900)
Wet Mix Macadam (Table 400-13) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density, Complete as per clause 406 of MORTH Specification. (Morth No. 111, 112, 406, 900)
Prime coat Providing and applying primer coat with bitumen emulsion (SS-I type) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per clause 502 of MORTH Specification over WMM (Morth No. 111, 112, 501, 502, 900)
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification- over granular surfaces treated with primer (Morth No. 111, 112, 501, 502, 900)
Dense Graded Bituminous Macadam (Table - 500-10) Providing and laying dense bituminous macadam with Hot Mix Plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade- 30) at percentage specified by Job Mix Formula by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolled as per clause 501.6 and 501.7 to achieve the desired compaction, as per clause No.505 of MoRTH specification Grading II 50mm thick (Morth No. 111, 112, 501, 505, 900)
Bituminous Concrete (Table 500-17) Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment,rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH Specification complete in all respects - Grading II (Morth No. 111, 112, 501, 507,900)
Excavation for Roadway and drainage Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines. Grades and cross sections shown in the drawings or as indicated by the Engineer, as per MORTH Specification for making of berms (Morth No. 112, 301, 305, 900)
Providing and laying of hot applied thermoplastic compound 2.5 mm, thick including reflectorising glass beads @ 250 gms. Per sqm . area , thickness of 2.5 mm. is exclusive of surface applied glass beads as per IRC : 35. The finished surface to be level, uniform and free form streaks and holes etc. complete (as per MORT & H Specification HW-W0089)
Providing and fixing reflective road studs of 'category A' Raised Pavement markers made out of poly carbonate / Methyl methecrylate / ABS moulded body confirming to ASTM D 788 and reflcetive panels with micro prismatic lens cabable of providing total internal reflection of the light entering the lens face with retro reflectance and chromaticity values conforming to ASTM D4280. The reflective raised pavement markers shall also confirm to the MORTH circular No RW/NH.33023/10/97-DO III dt.11.06.97.The height, width and length shall not be less than 15mm, 90mm and 100mm with minimum reflective area of 13 sq.cm. on each side and the slope to the base shall be 35+/-5 degree. Each reflector shall have a CIL not less than values specified in table 2 of said MORT&H circular. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19+/-2mm and height not less than 30+/-2mm) from the body is to be a minimum value of 500 kgf. Fixing will be by drilling holes on the road for the shanks ot go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the enginneer. The marker shall support a load of 13635 kg tested in accordance with ASTM D4280 and confirming to IRC 35-2015 guidelines and MORT&H specification 804 etc. complete.HW-W0090
Providing Box culvert at Bell mouth in providing new formation of bitumen Road
Earthwork excavation in all classes of soils except hard rock requiring, blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, Trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials, etc, complete as per standard specification for foundation.
Filling under the box culvert with Quarry Dust filling including cost and conveyance of sand to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc, complete for filling under the Box .
Vibrated Cement Concrete M15 Grade using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges, compacting, curing, and all incidental charges etc., complete for Foundation leveling course
Vibrated Reinforced Cement Concrete [Design Mix] M25 grade using ISS size HBG graded metal crushed stone including cost and conveyance of all materials to site but excluding cost and fabrication for steel but including cost and labour charges for formwork and centering, labour charges, compacting, finishing and curing, including all incidental charges etc., complete for BOX CULVERT.
Supply and fabrication of steel Grade Fe-500 required for all RCC items of works involved in the schedule including cost of steel cost of fabrication labour charges for cleaning the bars straightening cutting bending tying grills hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire provision of spacer bars, cover blocks and all other incidental charges etc. complete as per standard specification
Vibrated Cement Concrete M20 (Nominal Mix) Grade using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges, compacting, curing, and all incidental charges etc., complete for Wing Wall foundation
Vibrated Cement Concrete M20 (Nominal Mix) Grade using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges, compacting, curing, and all incidental charges etc., complete for Wing wall.
Vibrated Cement Concrete M15 (Nominal Mix) Grade using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges, compacting, curing, and all incidental charges etc., complete for Parapet Wall.
Providing and fixing 110 mm dia PVC sepage pipes of required length for abutment and wing, retaining wall including cost and conveyance of all materials to worksite, cost and conveyance of all materials tto worksite, cost and labour for semisperial backfill arrangements with 110 mm size broken granite stones at the periphery and labour charges for fixing etc. complete to drain the backfill as per standard specification.
Refilling behind the Wing Wall with cut earth filling including cost and conveyance of sand to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc, complete.
Providing Box culvert at in new formation of bitumen Road
Earthwork excavation in all classes of soils except hard rock requiring, blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, Trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials, etc, complete as per standard specification for foundation.
Filling under the box culvert with Quarry Dust filling including cost and conveyance of sand to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc, complete for filling under the Box .
Vibrated Cement Concrete M15 Grade using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges, compacting, curing, and all incidental charges etc., complete for Foundation leveling course
Vibrated Reinforced Cement Concrete [Design Mix] M25 grade using ISS size HBG graded metal crushed stone including cost and conveyance of all materials to site but excluding cost and fabrication for steel but including cost and labour charges for formwork and centering, labour charges, compacting, finishing and curing, including all incidental charges etc., complete for BOX CULVERT.
Supply and fabrication of steel Grade Fe-500 required for all RCC items of works involved in the schedule including cost of steel cost of fabrication labour charges for cleaning the bars straightening cutting bending tying grills hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire provision of spacer bars, cover blocks and all other incidental charges etc. complete as per standard specification
Vibrated Cement Concrete M20 (Nominal Mix) Grade using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges, compacting, curing, and all incidental charges etc., complete for Wing Wall foundation
Vibrated Cement Concrete M20 (Nominal Mix) Grade using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges, compacting, curing, and all incidental charges etc., complete for Wing wall.
Vibrated Cement Concrete M15 (Nominal Mix) Grade using 40mm ISS HBG metal including cost and conveyance of all materials to site, including cost and labour charges for formwork and centering, labour charges, compacting, curing, and all incidental charges etc., complete for Parapet Wall.
Providing and fixing 110 mm dia PVC sepage pipes of required length for abutment and wing, retaining wall including cost and conveyance of all materials to worksite, cost and conveyance of all materials tto worksite, cost and labour for semisperial backfill arrangements with 110 mm size broken granite stones at the periphery and labour charges for fixing etc. complete to drain the backfill as per standard specification.
Refilling behind the Wing Wall with cut earth filling including cost and conveyance of sand to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc, complete.
Provision for Bellmouth Drain in New formation of Road
Earthwork excavation in all classes of soil except soft rock not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges etc., complete as per relevant standard specification for foundation of Drain (SS20B)
Filling with Quarry fines including cost and conveyance of material to work site including labour charges for filling, laying, compacting by manual labour under optimum moisture content to get the maximum density flooding with water as layers or built-up to the bottom level inclusive all other incidental charges etc., complete below levelling course.
Plain Cement Concrete of grade M10 (Nominal mix) using 40mm ISS hard broken granite metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges for compacting, curing and all incidental charges etc., complete as per standard specification for Levelling course below Drain base slab.
Vibrated Reinforced Cement Concrete M 25 grade (Nominal mix) using 20mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing concrete, tools and plants and incidental charges complete as per relevant standard specification for Base slab, Drain walls & cover slab
Supply and fabrication of Tor steel grade 500D steel required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc. complete
Providing and fixing of FRP Gratings of 300 x 150 mm size with M.S flats of 25x10 mm for outer frames, 25x6 mm for inner braces and PVC pipe 150 mm dia fixed with mild steel grating, including cost and conveyance of pipes and gratings and fixing them in position.
Manufacturing, Supplying and fixing of FRC Man holes slab 600 mm dia of EHD - 35 (Extra Heavy Duty) ( perforated) as per BIS: 12592 (pat 1&2) and delivery of manholes covers and frames with ISI marking anywhere in Tamil Nadu including loading and unloading and stacking at site including labour charges for fixing in position as per standard spcifications. (50 m Intervals)
Provision for Construction of R.C.C Drain in New formation of Road
Earthwork excavation in all classes of soil except soft rock not requiring blasting and hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges etc., complete as per relevant standard specification for foundation of Drain (SS20B)
Filling with Quarry fines including cost and conveyance of material to work site including labour charges for filling, laying, compacting by manual labour under optimum moisture content to get the maximum density flooding with water as layers or built-up to the bottom level inclusive all other incidental charges etc., complete below levelling course.
Plain Cement Concrete of grade M10 (Nominal mix) using 40mm ISS hard broken granite metal including cost and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges for compacting, curing and all incidental charges etc., complete as per standard specification for Levelling course below Drain base slab.
Vibrated Reinforced Cement Concrete M 25 grade (Nominal mix) using 20mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying and curing concrete, tools and plants and incidental charges complete as per relevant standard specification for Base slab, Drain walls & cover slab
Supply and fabrication of Tor steel grade 500D steel required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc. complete
Providing and fixing of FRP Gratings of 300 x 150 mm size with M.S flats of 25x10 mm for outer frames, 25x6 mm for inner braces and PVC pipe 150 mm dia fixed with mild steel grating, including cost and conveyance of pipes and gratings and fixing them in position.
Manufacturing, Supplying and fixing of FRC Man holes slab 600 mm dia of EHD - 35 (Extra Heavy Duty) ( perforated) as per BIS: 12592 (pat 1&2) and delivery of manholes covers and frames with ISI marking anywhere in Tamil Nadu including loading and unloading and stacking at site including labour charges for fixing in position as per standard spcifications. (50 m Intervals)
GST Amount for providing Service to Government Contract Works for the above works at 18%(9%+9%). {GST Amount is the Total GST Amount for overall quoted amount}
N.SUBRAMANIAN (BID ID -1471970)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_720203.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .