| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹13.7 LAccepted-AOC | ₹13.7 L | 1 | Accepted-AOC final |
| 2 | 2₹14.3 LRejected-Finance | ₹14.3 L | 2 | Rejected-Finance 2 |
| 3 | 3₹14.2 LRejected-Finance | ₹14.2 L | 3 | Rejected-Finance 3 |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Not Enclosed Experience certificate and others |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Not Enclosed Experience certificate and others |
| Sl No | Description | Qty | Unit | Seerangamuthu L1 | S DHANANJEYAN CONTRACTOR L2 | MARI CONTRACT WORKS L3 |
|---|---|---|---|---|---|---|
| 1.00Improvements to Communityhall @ Kamalapuram village H/o Mallikuttai | ||||||
| 2.00 | EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc. complete.
Main Column
Toilet Column
GB Main wall alround
Cross wall
D/F Column Area
D/F Column Area
Step Infront of Building
Septic tank
Inlet Outlet Chamber
Plinth Protecion wall
Ramp wall to EWC
Ramp wall to Hall | 37.74 | cum | 230 ₹8,680.20 | 250 ₹9,435 | 263 ₹9,925.62 |
| 3.00 | Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.Flooring
Hall
Toilet
EWC | 4.28 | cum | 40 ₹171.20 | 1,450 ₹6,206 | 1,000 ₹4,280 |
| 4.00 | Filling in Basement with excavated Earth in layers of not more than 15cm. Thick well rammed, watered and consolidated complying with standard specifications etc., complete. Flooring
Hall
Toilet
EWC
D/F WC
Ramp to EWC
Ramp to Hall
Ramp to Hall
Ramp Landing at Step | 19.85 | cum | 40 ₹794 | 450 ₹8,932.50 | 45 ₹893.25 |
| 5.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Main Column
Toilet Column
Grade Beam
Main wall alround
D/F Column Area
Steptic tank
Plinth Protecion wall
Ramp wall to EWC
Ramp wall to Hall
Flooring
Hall
Toilet
D/f WC
Step
Plinth Protection
Ramp at EWC
Ramp at Hall
Ramp at Landing | 12.44 | sqm | 5,000 ₹62,200 | 4,500 ₹55,980 | 4,800 ₹59,712 |
| 6.00 | Cement concrete 1:2:4 mix using 20mm metal including cost and Conveyance of all site etc. Complete.
CC Infront of Building | 1.13 | sqm | 6,300 ₹7,119 | 5,000 ₹5,650 | 5,800 ₹6,554 |
| 7.00 | Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Basement
wall alround
wall alround upto lintel
wall alround lintel to roof
CW Bet. Toilet & EWC
Parapet alround
Parapet -WC-3 side
Septic tank wall alround
Baffle wall
Step I
Step II
Step III
Plinth Protection
Handrails
Ramp to EWC
Ramp to Hall
Ramp to Hall
Ramp to Hall
Ramp
Deductions
Door D2
Door D in Store
Door D1
Windows W
Ventilator
Jolly
Column Portion
Column Portion
Lintel
Lintel for cross wall
Lintel for cross wall
Roof level beam
Roof Level Beam Hall & Kit.
Tee Beam | 23.73 | cum | 5,450 ₹1.3 L | 5,000 ₹1.2 L | 5,500 ₹1.3 L |
| 8.00 | Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle
Column
Column up to Grade Beam
Column Bet. Grade & Base
Grade beam Inner
Alround | 30.47 | sqm | 450 ₹13,711.50 | 450 ₹13,711.50 | 500 ₹15,235 |
| 9.00 | Basement to Top of Parapet
For Columns
For Columns Toilet
Deductions | 36.75 | sqm | 800 ₹29,400 | 550 ₹20,212.50 | 1,000 ₹36,750 |
| 10.00 | Lintel
Alround
Roof Beam
Alround
Roof Slab - Ceiling
Hall
Toilet
Outsides alround
Toilet Outside alround
Roof Rear Projection
Bottom
Door D
Door D1
Windows
Ventilator
Jolly
Septic tank
Septic tank alround | 84.16 | sqm | 950 ₹79,952 | 650 ₹54,704 | 1,000 ₹84,160 |
Tender Value
₹17 L
EMD Value
₹17,000
Closing Date
12 Jan 2026, 3:00 pmClosed
BDO BP
BDO Office Karimangalam
Improvements to Communityhall at Kamalapuram village H-o Mallikuttai Karimangalam Block
2026_RDTN_638543_1
Roc.No.2669 -2025-A2
Open Tender
Civil Works
The Block Development Office, Karimangalam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹17,000
Karimangalam
10 Mar 2026
2 Jan 2026
12 Jan 2026
2 Jan 2026
12 Jan 2026
2 Jan 2026
2 Jan 2026
Improvements to Communityhall @ Kamalapuram village H/o Mallikuttai
EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc. complete. Main Column Toilet Column GB Main wall alround Cross wall D/F Column Area D/F Column Area Step Infront of Building Septic tank Inlet Outlet Chamber Plinth Protecion wall Ramp wall to EWC Ramp wall to Hall
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.Flooring Hall Toilet EWC
Filling in Basement with excavated Earth in layers of not more than 15cm. Thick well rammed, watered and consolidated complying with standard specifications etc., complete. Flooring Hall Toilet EWC D/F WC Ramp to EWC Ramp to Hall Ramp to Hall Ramp Landing at Step
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed Main Column Toilet Column Grade Beam Main wall alround D/F Column Area Steptic tank Plinth Protecion wall Ramp wall to EWC Ramp wall to Hall Flooring Hall Toilet D/f WC Step Plinth Protection Ramp at EWC Ramp at Hall Ramp at Landing
Cement concrete 1:2:4 mix using 20mm metal including cost and Conveyance of all site etc. Complete. CC Infront of Building
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications. Basement wall alround wall alround upto lintel wall alround lintel to roof CW Bet. Toilet & EWC Parapet alround Parapet -WC-3 side Septic tank wall alround Baffle wall Step I Step II Step III Plinth Protection Handrails Ramp to EWC Ramp to Hall Ramp to Hall Ramp to Hall Ramp Deductions Door D2 Door D in Store Door D1 Windows W Ventilator Jolly Column Portion Column Portion Lintel Lintel for cross wall Lintel for cross wall Roof level beam Roof Level Beam Hall & Kit. Tee Beam
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle Column Column up to Grade Beam Column Bet. Grade & Base Grade beam Inner Alround
Basement to Top of Parapet For Columns For Columns Toilet Deductions
Lintel Alround Roof Beam Alround Roof Slab - Ceiling Hall Toilet Outsides alround Toilet Outside alround Roof Rear Projection Bottom Door D Door D1 Windows Ventilator Jolly Septic tank Septic tank alround
Sunshade Front window & door Loft in store Loft in store Rear side windows
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs Column Matt Coping Column Coping Column up to Grade Beam Column up to Grade Beam Column Bet. Grade & Base Column Bet. Grade & Base Grade beam Alround For Columns For Columns Toilet Lintel Alround Roof level Beam Alround Tee beam Sill Slab Loft in store Sunshade Front Rear side windows Roof Slab Toilet Roof Slab Septic tank cover slab D/F column in lintel D/F column in Roof beam
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.
Providing Two coats of Putty of 3mm thick over RCC surface Ceiling Hall Tee Beam Sides Toilet Bottom Door D Door D1 Windows W Ventilator Jolly
Plastering 1:3 100 thick Sunshade Front Rear Sunshade Front Sunshade Side Rear Sunshade Side
Plastering with CM 1:4, 20mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2. Septic Tank Inner Cross wall Septic Tank Bottom Septic tank Top
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers. Hall Toilet EWC Outer alround Toilet 3 Sides Soffits Door D Door D1 Windows w Ventilator Jolly Ramp wall Parapet wall inner alround Parapet Top Step Sides 1 Step Sides 2 Step Sides 3 Door D Deductions Door D Door D in Store Door D1 Windows W Ventilator Jolly
Paving the Top of roof with Solar reflective ceramic tiles of size 305 x 305 x 7mm thick of approved quality and colour laid in Cement mortar 1:3 (One cement and three M.Sand) 12mm thick and pointed with tile grout (Nitotile Grout or equivalent) and cement in the ratio of 1:3 for joint, curing etc., complete complying with standard specification and as directed by the departmental officers Main Building Splash Portion Toilet Portion Splash Portion
Paving the floor with scratch proof design ceramic tiles of any colour and any size laid in CM 1:3, 20mm thick. And pointing with white cement 0.4 Kg per sqm mixed with colouring pigment to siut the colour of the tiles including finishing the joints neatly completed. Flooring Hall Side alround
Paving the flooring with special type of flooring tiles (Cement based Hydraulically pressed Anti skid tiles (20mm thick) in CM 1:3, 20mm thick including finishing the joints neatly completed. Flooring Toilet D/F WC
Dadooing walls with Colour Glazed tiles of any colour and any size laid in CM 1:2, 10mm thick. and pointing with white cement 0.4 Kg per sqm mixed with colouring pigment to siut the colour of the tiles including finishing the joints neatly complying with the standard. Toilet sides alround Toilet sides alround D/F Door D D/F Door D2
Providing the following thickness of Granolithic pattern floor finish with Plain Cement concrete 1 : 2 : 4 mix using 10-12mm ISS HBG metal and the top rubed smooth etc., complete complying with standard specification as directed. i. 20mm thick for Resid Main Building Splash Portion Toilet Portion Splash Portion Step Ramp Top Ramp Top Ramp Top Kitchen Store
Distembering two coats using best approved Interiar oil destember with one coat primer over New plastered Surface including cost and conveyance of materials and labour charges etc complete Ceiling Hall Tee Beam Sides Toilet Bottom Door D Door D1 Windows W Ventilator Jolly Sunshade Front Rear Sunshade Hall Toilet EWC Soffits Door D Door D in Store Door D1 Windows w Ventilator Jolly Ramp wall Deductions Door D Door D1 Windows W Ventilator
Painting Two Coats Approved Plastic Emultion Paint with one coat primer over New Cement Plastered surface including cost and conveyance of materials and labour charges etc complete.Schedule ItemNo.359 – B) Outer alround Toilet 3 Sides Parapet wall inner alround Parapet Top Front Sunshade Side Rear Sunshade Side Deductions Door D Windows W Ventilator
Painting two Coats over New iron Works using best quality of enamel paint including cost and conveyance of materials and labour charges etc complete. Door D Door D1 Windows W Ventilater
Supply and Cost of Steel door , Window, Ventilator Door D (1.10x 2.40m)
Door D2 (0.90 x 2.40m)
Windows (1.20 x 1.60m)
Ventilator (0.90x0.45m)
Jolly (0.60x0.45m)
Fixing Charges of Steel doors, windows and ventilators Door D (1.10x 2.40m) Door D2 (0.75 x 2.40m)
Windows (1.20 x 1.60m) Ventilator (0.90x0.45m)
Provision for Electrification arrangements Light & Fan Point SD.no.23
Supply&Fixing of Tube Light SD.no.88
CFL SD.no.80
BHF with CFL SD.no.83
Supply&Fixing of Street light SD No.94
Supply & Fixing of Fan SD.no.110
Plug Point SD.no.36
S & Fixing DP Main switch SD.no.142
S & FixingTNEB Meter board SD.no.125
Service pipe SD.no.73
Service Connection SD.no.68
Service Charge to EB
Supplying and fixing P.V.C rainwater down fall pipe of 100mm dia with necessary shoes, bends,& clamps etc., Outer
Provision for RWHS including pipes & specials etc., all complete
Provision for Water supply arrangements 1000 Ltr HDPE Tank
25mm PVC Pipe
Provision of EWC,
Provision of IWC
Provision for Wash Basin
Provsion for Name Board.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.54 MB
T.pdf
Tender Documents • 0.73 MB
P.pdf
Additional Documents • 0.56 MB
BOQ_764193.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid