Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.3 LAccepted-Finance | ₹6.3 L | L1 | Accepted-Finance L1 Accepted |
| 2 | L2₹6.3 L+₹1,362.12 (0.22%)Rejected-Finance | ₹6.3 L+₹1,362.12 (0.22%) | L2 | Rejected-Finance L2 Rejected |
| 3 | L3₹6.4 L+₹3,000.73 (0.47%)Rejected-Finance | ₹6.4 L+₹3,000.73 (0.47%) | L3 | Rejected-Finance L3 Rejected |
| Sl No | Description | Qty | Unit | M. SIRANJEEVI L3 | K. ADHIVEL L2 | M. MOHAMED ANSARI RAJA L1 |
|---|---|---|---|---|---|---|
| 1.00Construction of RCC 1.50m Span Slab Culvert at Odugampatti near Communitty Hall in Odugampatti Panchayat | ||||||
| 2.00 | Earth work excavation and depositing on sides with initial lead and lift in hard graually soil as per SS 20B for foundation. | 51.51 | Cum | 270 ₹13,907.7 | 265 ₹13,650.15 | 263.5 ₹13,572.89 Lowest |
| 3.00 | Filling with M.Sand including cost and conveyance and all charges etc., complete. | 4.55 | Cum | 1,900 ₹8,645 | 1,900 ₹8,645 | 1,898.4 ₹8,637.72 Lowest |
| 4.00 | Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete. | 6.06 | Cum | 5,450 ₹33,027 | 5,435 ₹32,936.1 | 5,433.5 ₹32,927.01 Lowest |
| 5.00 | Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete. | 48.82 | Cum | 5,725 ₹2,79,494.5 | 5,710 ₹2,78,762.2 | 5,706 ₹2,78,566.92 Lowest |
| 6.00Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc., complete. | ||||||
| 7.00 | Below Sill Level | 59.4 | Sqm | 550 ₹32,670 | 550 ₹32,670 | 547 ₹32,491.8 Lowest |
| 8.00 | Above Sill Level | 78.03 | Sqm | 1,100 ₹85,833 | 1,100 ₹85,833 | 1,094 ₹85,364.82 Lowest |
| 9.00 | C.C. 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance and all labour charges etc.complete. | 3.36 | Cum | 6,750 ₹22,680 | 6,740 ₹22,646.4 | 6,700 ₹22,512 Lowest |
| 10.00 | Supplying and fabrication of steel rods including all cost and conveyance and all labour charges and all other incidental charges. | 0.35 | MT | 92,500 ₹32,375 | 92,000 ₹32,200 | 91,900 ₹32,165 Lowest |
Tender Value
Refer Docs
EMD Value
₹6,400
Closing Date
8 Jul 2026, 3:00 pmClosed
Block Development Officer (BP)
Block Development Officer (BP) Panchayat Union, Kunnandarkoil
Construction of RCC 1.50m Span Slab Culvert at Odugampatti near Community Hall in Odugampatti Panchayat
2026_RDTN_681181_1
Kkoil/SFC(D.Pts) Work - 2
Open Tender
Civil Works
Item Rate
180 days
Kunnandarkoil
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹6,400
Yes
15 Jul 2026
16 Jun 2026
8 Jul 2026
16 Jun 2026
8 Jul 2026
16 Jun 2026
16 Jun 2026 - 8 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of RCC 1.50m Span Slab Culvert at Odugampatti near Communitty Hall in Odugampatti Panchayat | - | - | - | - |
| 2 | Earth work excavation and depositing on sides with initial lead and lift in hard graually soil as per SS 20B for foundation. | 51.51 | Cum | - | - |
| 3 | Filling with M.Sand including cost and conveyance and all charges etc., complete. | 4.55 | Cum | - | - |
| 4 | Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete. | 6.06 | Cum | - | - |
| 5 | Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete. | 48.82 | Cum | - | - |
| 6 | Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc., complete. | - | - | - | - |
| 7 | Below Sill Level | 59.4 | Sqm | - | - |
| 8 | Above Sill Level | 78.03 | Sqm | - | - |
| 9 | C.C. 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance and all labour charges etc.complete. | 3.36 | Cum | - | - |
| 10 | Supplying and fabrication of steel rods including all cost and conveyance and all labour charges and all other incidental charges. | 0.35 | MT | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
Tendernotice_2.pdf
PDF • 0.12 MB
TendernoticeOdugampatticulvert.pdf
Tender Documents • 0.10 MB
BOQ_818605.xls
BOQ • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .