Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.3 LAdmitted-Fee/PreQual/Technical/Finance | -1.11% | ₹7.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹7.3 L+₹5,238.82 (0.72%)Admitted-Fee/PreQual/Technical/Finance | -0.40% | ₹7.3 L+₹5,238.82 (0.72%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹7.4 L
EMD Value
₹73,800
Closing Date
19 Aug 2026, 3:00 pmClosed
Nagar Ayukta Nagar Nigam Jhnasi
Nagar Nigam Jhansi
TENDER NO.(13) WARD NO.38 KE ANTARGAT BISATYANA KABRISTAN KE ANDAR GATE SE KUA TAK FUTPATH AWAM DALAN NIRAMAN KA KARYA.
2026_DOLBU_1174345_13
1047/JANKARYA VI./V.VI./2026-27 DATED-29/07/2026
Open Tender
Civil Works
Percentage
90 days
Jhansi
Please refer Tender documents.
1 document required · 1 mandatory
₹873
Nagar Ayukta Nagar Nigam Jhansi
₹73,800
24 Aug 2026
4 Aug 2026
19 Aug 2026
4 Aug 2026
19 Aug 2026
4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil mixed with moorum,Kankar including 1.5m lift and 30m lead including all mat lab T & P etc.(S.I. NO. 251) | 1 | Cum | 145 | ₹144.86 |
| 2 | P.C.C. work 4cm gauge stone balast 1:4:8 cement conc. All mat. Lab. T&P etc.(P.W.D. Shedule Item No-281) | - | Cum | 4,175 | - |
| 3 | Earth work in cutting or in filling in ordinary soil mixed with moorum including 1.5m lift &30m lead including lab. And T&P etc all comp. (S.I.No.253). | 0.8 | Cum | 130 | ₹104 |
| 4 | M150 Brick Work in 1:4 cement coarse sand mortar in super structure including supply of all mat. Lab T&P etc. (S.I. NO.305) | - | Cum | 5,940 | - |
| 5 | P/L of C.C. work 2cm gauge stone ballast 1:2:4 cement sand and coarse aggrigate including lab. Mat. T&P etc. all complete (S.I.No.279a). | 1 | Cum | 5,815 | ₹5,814.42 |
| 6 | 12mm cement plaster 1:4 cement and fine sand in single coat on fair side of single or half brick wall for interior plastring upto floor two level including internal rounded angles chambers including supply of all mat. Lab. T&P etc. (S.I No. 17.58(2)) . | 1 | Sqm | 145 | ₹144.86 |
| 7 | R.C.C work with cement, approved coarse sand, 20mm gauge stone grit in the proportion 1:2:4 including centering & shuttering, lab. &T&P all complete but excluding supply of reinforcement and its bemding (S.I No. 283) . | - | Cum | 7,130 | - |
| 8 | Mild Steel or iron work such as reinforced concrete or reinforced brick worK (When not included in and an overall rates) brought shape as necessary include bending for proper completaion of the work with all mat. Lab. T&P etc | 0.8 | Qtl. | 5,950 | ₹4,760 |
| 9 | Providing and applying plaster of paris putty of 2mm thickness over plastered surface even and smooth comp.. | 1 | Sqm | 113.62 | ₹113.61 |
| 10 | New work (two or more coats appied @ 1.43litre/10 sqm over and incl priming coat of exterior primer applied @0.90 litre/10sqm | 1 | Sqm | 65 | ₹64.99 |
stage.html
html • 0.02 MB
finance_2206481.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 22.37 MB
BOQ_2206481.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .