| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹78.9 LAccepted-AOC | L1 | Accepted-AOC L1 Tenderer | |
| 2 | L2₹83.0 L+₹4.1 L (5.14%)Rejected-Finance | L2 | Rejected-Finance L2 Tenderer |
Tender Value
₹79.8 L
EMD Value
₹80,000
Closing Date
5 Aug 2022, 3:00 pmClosed
The Project Director DRDA Chengalpattu
O/o The Project Director DRDA Chengalpattu
Improvements to 5 No.ofTank/Ponds Kattankolathur Block in chengalpattu District Having Package no. 05
2022_RDTN_244497_1
4683.2022 A10 dt.27.07.2022
Open Tender
Civil Works
Item Rate
90 days
Kattankolathur Block
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹80,000
O/o The Project Director DRDA Chengalpattu
3 Nov 2022
29 Jul 2022
5 Aug 2022
29 Jul 2022
5 Aug 2022
29 Jul 2022
2 Aug 2022
Amount
PART I : Improvements to Kolatchi Amman Koil Kulam in Urapakkam Panchyat Estimate Amount : Rs.22.36 Lakhs
scrub jungle clearance with cost and conveyance including all other labuour charges etc complete
Earth work in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100m by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment developed and not exceeding 23cm thickness, benching of slopes prior to placement of earth fill including extra earth filling, breaking clods, watering to OMC and compaction of each layer to 95% of proctor density through deployment of appropriate compaction equipment 8 - 10 tonne power roller - vibratary power roller short width (+/- 0.90m m widht durm) power roller or vibratory roller ensuring compaction of designed bund section and also ensuring compaction of earth fill and side slopes thorugh the deployment of hydraulic excavaters with steel plate fixtures attached to their booms / heavy power roller capable of climbing 1:5 (Horizontal) :1.00 (vertical ) slope including side slopes as directed by the eninner in charge of works and as per technical specification.
Earth work deploying earth moving machinery for desilting channel and forming bund either sides and deposting the earth on banks including jungle clearance etc complete
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil etc complete.
Supplying and filling in foundation and basement with filling M. sand including water consolidating etc.,
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Centering with shuttering for all cc works using Ms sheet with cost and conveyance including all other labour charges etc complete
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Random Rubble masonry in CM 1:5 foundation and basement including simultaneously flush etc complete
Rough stone dry packing using rough stone with cost and conveyance including all other labour charges etc complete
Pointing in cm 1:3 mix with cost and conveyance including all other labour charges etc complete
PART II : Improvements to Chitheri Thangal in Urapakkam Panchayat. Estimate Amount : Rs.12.00 Lakhs
scrub jungle clearance with cost and conveyance including all other labuour charges etc complete
Earth work in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100m by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment developed and not exceeding 23cm thickness, benching of slopes prior to placement of earth fill including extra earth filling, breaking clods, watering to OMC and compaction of each layer to 95% of proctor density through deployment of appropriate compaction equipment 8 - 10 tonne power roller - vibratary power roller short width (+/- 0.90m m widht durm) power roller or vibratory roller ensuring compaction of designed bund section and also ensuring compaction of earth fill and side slopes thorugh the deployment of hydraulic excavaters with steel plate fixtures attached to their booms / heavy power roller capable of climbing 1:5 (Horizontal) :1.00 (vertical ) slope including side slopes as directed by the eninner in charge of works and as per technical specification.
Earth work deploying earth moving machinery for desilting channel and forming bund either sides and deposting the earth on banks including jungle clearance etc complete
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil etc complete.
Supplying and filling in foundation and basement with filling M. sand including water consolidating etc.,
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Centering with shuttering for all cc works using Ms sheet with cost and conveyance including all other labour charges etc complete
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum.
Rough stone dry packing using rough stone with cost and conveyance including all other labour charges etc complete
Pointing in cm 1:3 mix with cost and conveyance including all other labour charges etc complete
PART III : Improvemetns to Pillayar Koil Kulam in Vandalur Panchayat. Estimate Amount : Rs.23.55 Lakhs
scrub jungle clearance with cost and conveyance including all other labuour charges etc complete
Earth work in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100m by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment developed and not exceeding 23cm thickness, benching of slopes prior to placement of earth fill including extra earth filling, breaking clods, watering to OMC and compaction of each layer to 95% of proctor density through deployment of appropriate compaction equipment 8 - 10 tonne power roller - vibratary power roller short width (+/- 0.90m m widht durm) power roller or vibratory roller ensuring compaction of designed bund section and also ensuring compaction of earth fill and side slopes thorugh the deployment of hydraulic excavaters with steel plate fixtures attached to their booms / heavy power roller capable of climbing 1:5 (Horizontal) :1.00 (vertical ) slope including side slopes as directed by the eninner in charge of works and as per technical specification.
Earth work deploying earth moving machinery for desilting channel and forming bund either sides and deposting the earth on banks including jungle clearance etc complete
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil etc complete.
Supplying and filling in foundation and basement with filling M. sand including water consolidating etc.,
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Centering with shuttering for all cc works using Ms sheet with cost and conveyance including all other labour charges etc complete
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Random Rubble masonry in CM 1:5 foundation and basement including simultaneously flush etc complete
Rough stone dry packing using rough stone with cost and conveyance including all other labour charges etc complete
Pointing in cm 1:3 mix with cost and conveyance including all other labour charges etc complete
PART V : Improvements to Pazhaveli Eri in Pazhaveli Panchayat. Estimate Amount : Rs.10.00 Lakhs
scrub jungle clearance with cost and conveyance including all other labuour charges etc complete
Earth work in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100m by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment developed and not exceeding 23cm thickness, benching of slopes prior to placement of earth fill including extra earth filling, breaking clods, watering to OMC and compaction of each layer to 95% of proctor density through deployment of appropriate compaction equipment 8 - 10 tonne power roller - vibratary power roller short width (+/- 0.90m m widht durm) power roller or vibratory roller ensuring compaction of designed bund section and also ensuring compaction of earth fill and side slopes thorugh the deployment of hydraulic excavaters with steel plate fixtures attached to their booms / heavy power roller capable of climbing 1:5 (Horizontal) :1.00 (vertical ) slope including side slopes as directed by the eninner in charge of works and as per technical specification.
Earth work deploying earth moving machinery for desilting channel and forming bund either sides and deposting the earth on banks including jungle clearance etc complete
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil etc complete.
Supplying and filling in foundation and basement with filling M. sand including water consolidating etc.,
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Centering with shuttering for all cc works using Ms sheet with cost and conveyance including all other labour charges etc complete
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum.
Rough stone dry packing using rough stone with cost and conveyance including all other labour charges etc complete
Pointing in cm 1:3 mix with cost and conveyance including all other labour charges etc complete
PARTV : Improvements to Keel Kuttai in Unamacheri Panchayat. Estimate Amount : Rs.11.91 Lakhs
scrub jungle clearance with cost and conveyance including all other labuour charges etc complete
Earth work in all soils except hard rock requiring blasting and conveying with a lead of 0 to 100m by deploying earth moving machineries and tippers for formation of bund in layers of suitable thickness, depending upon type of compaction equipment developed and not exceeding 23cm thickness, benching of slopes prior to placement of earth fill including extra earth filling, breaking clods, watering to OMC and compaction of each layer to 95% of proctor density through deployment of appropriate compaction equipment 8 - 10 tonne power roller - vibratary power roller short width (+/- 0.90m m widht durm) power roller or vibratory roller ensuring compaction of designed bund section and also ensuring compaction of earth fill and side slopes thorugh the deployment of hydraulic excavaters with steel plate fixtures attached to their booms / heavy power roller capable of climbing 1:5 (Horizontal) :1.00 (vertical ) slope including side slopes as directed by the eninner in charge of works and as per technical specification.
Earth work deploying earth moving machinery for desilting channel and forming bund either sides and deposting the earth on banks including jungle clearance etc complete
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil etc complete.
Supplying and filling in foundation and basement with filling M. sand including water consolidating etc.,
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Centering with shuttering for all cc works using Ms sheet with cost and conveyance including all other labour charges etc complete
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Random Rubble masonry in CM 1:5 foundation and basement including simultaneously flush etc complete
Rough stone dry packing using rough stone with cost and conveyance including all other labour charges etc complete
Pointing in cm 1:3 mix with cost and conveyance including all other labour charges etc complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
BHARATHI
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .