Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 LAdmitted-Finance JAI COTTAGE VIKAS NAGAR KASUMPTI SHIMLA 171009 | SHIMLA | SHIMLA | HIMACHAL PRADESH | 171009 | ₹5.2 L | L1 | Admitted-Finance |
| 2 | L2₹6.2 L+₹93,830.20 (17.9%)Admitted-Finance | ₹6.2 L+₹93,830.20 (17.9%) | L2 | Admitted-Finance |
| 3 | L3₹6.3 L+₹1.0 L (19.2%)Admitted-Finance | ₹6.3 L+₹1.0 L (19.2%) | L3 | Admitted-Finance |
| 4 | L4₹7.2 L+₹2.0 L (37.8%)Admitted-Finance | ₹7.2 L+₹2.0 L (37.8%) | L4 | Admitted-Finance |
| 5 | L5₹7.8 L+₹2.6 L (48.8%)Admitted-Finance BABU RAM THAKUR NIWAS BELOW UTTAM GAS AJANCY DISTT SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | ₹7.8 L+₹2.6 L (48.8%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | bharat singh L4 | Sudhir Sharma L6 | Reet Singh L1 | VIJAY SHARMA L3 | Babu Ram L5 | SUNIL SHARMA L2 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 3.14 | P.cum | 1,200 ₹3,768 | 1,400 ₹4,396 | 1,000 ₹3,140 | 3,025 ₹9,498.5 | 1,350 ₹4,239 | 800 ₹2,512 Lowest |
| 2.00 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material. Hard Roack blasting prohibited and their intermediate classification of soils including, dewatering wherever required, setting of to the required lines, levels as shown on the drawing and directed by the Engineer -in-charge at site, according to the HP.PWD. specification of 1990 (one thousand nine hundred ninety) volume-I (one) and sorting out useful and unuseful material and transportation of the unuseful material for disposing at approved dumping site Bharyal. including head load, animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour (if required).All useful material such as stones, shingles aggregate and slates shall be properly stacked at site to the maximum possible extent in all leads and lifts through all modes of transportation the usefull stones as per the direction of the Engineer-in-Charge. Any loss to the public and private propriety during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges. | 31.28 | P.Cum | 400 ₹12,512 | 500 ₹15,640 | 250 ₹7,820 | 1,725 ₹53,958 | 600 ₹18,768 | 200 ₹6,256 Lowest |
| 3.00 | Centering and shuttering including strutting, propping etc. and removal of form work for : Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 116.22 | P.sqm | 450 ₹52,299 | 520 ₹60,434.4 | 180 ₹20,919.6 Lowest | 1,650 ₹1,91,763 | 600 ₹69,732 | 400 ₹46,488 |
| 4.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size)including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 38.1 | P.Cum | 7,000 ₹2,66,700 | 7,800 ₹2,97,180 | 5,800 ₹2,20,980 | 1,580 ₹60,198 Lowest | 8,000 ₹3,04,800 | 6,000 ₹2,28,600 |
| 5.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 720 | P.Kg | 105 ₹75,600 | 120 ₹86,400 | 65 ₹46,800 Lowest | 118 ₹84,960 | 122 ₹87,840 | 80 ₹57,600 |
| 6.00 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 1,153.38 | P.Kg | 115 ₹1,32,638.7 | 125 ₹1,44,172.5 | 90 ₹1,03,804.2 | 55 ₹63,435.9 Lowest | 120 ₹1,38,405.6 | 100 ₹1,15,338 |
| 7.00 | P/F M.S. Pipe 40mm nominal bore for railing & fixed in M.S. Angle/Channels etc. including primer coat carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 450 | P.Rmt | 400 ₹1,80,000 | 425 ₹1,91,250 | 270 ₹1,21,500 Lowest | 360 ₹1,62,000 | 350 ₹1,57,500 | 360 ₹1,62,000 |
Tender Value
₹6.8 L
EMD Value
₹13,600
Closing Date
24 Jun 2026, 5:00 pmClosed
Executive Engineer RB MC Shimla
Executive Engineer RB MC Shimla
RM of MC road from MC parking to Ganga Public School in ward no 33 Khalini SH C O Drain and P F roadside railings between RD 0 150 to 0 300
2026_MC_136648_6
2166dated06062026
Open Tender
Civil Works
Item Rate
60 days
SHIMLA
Please refer to tender document
7 documents required · 7 mandatory
₹590
Executive Engineer RB MC Shimla
₹13,600
13 Jul 2026
16 Jun 2026
25 Jun 2026
16 Jun 2026
24 Jun 2026
16 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 3.14 | P.cum | 100 | ₹314 |
| 2 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material. Hard Roack blasting prohibited and their intermediate classification of soils including, dewatering wherever required, setting of to the required lines, levels as shown on the drawing and directed by the Engineer -in-charge at site, according to the HP.PWD. specification of 1990 (one thousand nine hundred ninety) volume-I (one) and sorting out useful and unuseful material and transportation of the unuseful material for disposing at approved dumping site Bharyal. including head load, animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour (if required).All useful material such as stones, shingles aggregate and slates shall be properly stacked at site to the maximum possible extent in all leads and lifts through all modes of transportation the usefull stones as per the direction of the Engineer-in-Charge. Any loss to the public and private propriety during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges. | 31.28 | P.Cum | 101 | ₹3,159.28 |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form work for : Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 116.22 | P.sqm | 102 | ₹11,854.44 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size)including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 38.1 | P.Cum | 103 | ₹3,924.3 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 720 | P.Kg | 104 | ₹74,880 |
| 6 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 1,153.38 | P.Kg | 105 | ₹1,21,104.9 |
| 7 | P/F M.S. Pipe 40mm nominal bore for railing & fixed in M.S. Angle/Channels etc. including primer coat carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 450 | P.Rmt | 106 | ₹47,700 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
Tendernotice_2.pdf
PDF • 4.32 MB
Tendernotice_3.pdf
PDF • 0.70 MB
Tendernotice_4.pdf
PDF • 0.35 MB
BOQ_202422.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .