Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAccepted-AOC H N 131 GOPLAPUR NEW SHIVPURI GOPLAPUR GORAKHPUR UTTAR PRADESH 273016 | GORAKHPUR | UTTAR PRADESH | 273016 | L1 | Accepted-AOC LOWEST/NEGOTIATED | |
| 2 | L2₹4.2 L+₹23,486.29 (6.00%)Rejected-Finance JHARIA BENIGANJ HARDOI | BENIGANJ | HARDOI | UTTAR PRADESH | L2 | Rejected-Finance 2ND LOWEST | |
| 3 | L3₹4.4 L+₹43,869.13 (11.2%)Rejected-Finance GORAKHPUR UP 273001 | GORAKHPUR | GORAKHPUR | UTTAR PRADESH | 273001 | L3 | Rejected-Finance 3RD LOWEST |
Tender Value
Refer Docs
EMD Value
₹4,000
Closing Date
11 Oct 2023, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SUPERINTENDING ENGINEER
ELECTRICITY URBAN DISTRIBUTION CIRCLE, BUNGLOW NO.-9, OLD POWER HOUSE COLONY, RAILWAY STATION ROAD, GORAKHPUR
WORK SANCTIONED UNDER BUSINESS PLAN
2023_PVVNV_844894_1
31/EUDC(G)/2023-24
Open Tender
Electrical Works
Lump-sum
30 days
AREA OF EUDC GKP
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SUPERINTENDING ENGINEER EUDC
₹4,000
22 Feb 2024
30 Sept 2023
12 Oct 2023
30 Sept 2023
11 Oct 2023
30 Sept 2023
Amount
fo|qr uxjh; forj.k [k.M&izFke] xksj[kiqj ds vUrxZr fctusl Iyku 2023&24 esa Lohd`r iSdst la[;k 27@2023&24 ¼Hkjofy;k pkSjkgk] iapk;r Hkou] :Lreiqj] xksj[kiqj esa 250 ds0oh0,0 ifjorZd dh LFkkiuk dk dk;Z½ ds dk;ksZ dks djkus gsrq dk;Z dk fooj.k %&
Loading, unloading and safe carriage of following materials from Store Centre, Gorakhpur to JE dump Store and JE dump Store to work site with proper stacking :-
250 KVA Transformer
11 KV XLPE Cable 3X70 sq mm C/J kits O/D
11 KV XLPE Cable 3X70 sq mm
ST Pole 11 mtr long
MS Top Channel (125x65x2240) mm
MS angle (Dropper) 100X50X2028 mm
MS angle 75X75X6X2028 mm with clamp & bolts & nut (T/F base)
11 KV Fuse set
Stay complete (Stay rod 16X1800 mm, stay wire 5 kg, stay clamp, bolt & nuts)
Earthing complete
LT Cable 1X240 sq mm
Supply of following material/fitting complete in all respect :-
Holding Clamp for top, dropper channel Fuse set etc with nuts & bolts
Copper Z Clamp
Nuts & bolts of different sizes
Al Lugs
The excavation of 2 No foundation pit of size 750mmX450mm and having depth of 1/6th of the full length of the pole. Fabrication & erection of double Pole with fixing of necessary clamps & accessories (Top Channel, Dropper Angle etc.) as per required. All required materials such as Holding clamp/STP clamp, Nuts & Bolts off size etc will be provided by the contractor. Grouting of Pole in cc 1:4:8 (Cement, sand & 40 mm brick ballast), Grouting will be done in the block of size 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc (Material provided by Contractor). Making plinth around Pole height 300 mm above ground level with top 100 mm is kept tapered so that no rainwater gets accumulated on the top. All work will be done as per RESPO norms & relevent IS Specification.
Painting of Pole by double coating Aluminium & Red oxide paint. Paint will be provided by contractor
Earthing of ST Pole by MS earthing Rod & 6 SWG earthing Wire as per RESPO norms.
Fabrication, errection, commissioning & Testing of 250 KVA T/F on Plinth with all accessories including make its LT and HT connection. All neessary materials will be supplied by the Contractor.
Chemical earthing of Transformer (Body+Neutral) as per IS Code 3043 - 1987 specification (Materials will be provided by contractor)
Erection and grouting of stay in CC ratio 1:4:8 of Cement, Sand and Stone Ballast including cost of grouting material with nozelling and binding of stay wire (Complete work)
Erection of 11 KV 3X70 Sq.mm. Cable Jointing Kit
Erection of 11 KV Fuse set
fo|qr uxjh; forj.k [k.M&f}rh;] xksj[kiqj ds vUrxZr fctusl Iyku 2023&24 esa Lohd`r iSdst la[;k 28@2023&24 ¼xzhuflVh xsV la0 1] xksj[kukFk] xksj[kiqj esa 250 ds0oh0,0 ifjorZd dh LFkkiuk dk dk;Z½ ds dk;ksZ dks djkus gsrq dk;Z dk fooj.k %&
Loading, unloading and safe carriage of following materials from Store Centre, Gorakhpur to JE dump Store and JE dump Store to work site with proper stacking :-
250 KVA Transformer
ST Pole 11 mtr long
3.5X400 LT PVC Cable
11 KV Top Channel
11 KV Dropper Angle
11 KV T-off channel
SS Base Angle
11 KV Pin insulator
11 KV Disc Insulator
The excavation of 2 No foundation pit of size 750mmX450mm and having depth of 1/6th of the full length of the pole. Fabrication & erection of double Pole with fixing of necessary clamps & accessories (Top Channel, Dropper Angle etc.) as per required. All required materials such as Holding clamp/STP clamp, Nuts & Bolts off size etc will be provided by the contractor. Grouting of Pole in cc 1:4:8 (Cement, sand & 40 mm brick ballast), Grouting will be done in the block of size 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc (Material provided by Contractor). Making plinth around Pole height 300 mm above ground level with top 100 mm is kept tapered so that no rainwater gets accumulated on the top. All work will be done as per RESPO norms & relevent IS Specification.
Painting of Pole by double coating Aluminium & Red oxide paint. Paint will be provided by contractor
Earthing of ST Pole by MS earthing Rod & 6 SWG earthing Wire as per RESPO norms.
Fabrication, errection, commissioning & Testing of 250 KVA T/F on Plinth with all accessories including make its LT and HT connection. All neessary materials will be supplied by the Contractor.
Chemical earthing of Transformer (Body+Neutral) as per IS Code 3043 - 1987 specification (Materials will be provided by contractor)
fo|qr uxjh; forj.k [k.M&f}rh;] xksj[kiqj ds vUrxZr fctusl Iyku 2023&24 esa Lohd`r iSdst la[;k 29@2023&24 ¼dVfg;k ekrk efUnj] jkeuxj] xksj[kiqj esa 250 ds0oh0,0 ifjorZd dh LFkkiuk dk dk;Z½ ds dk;ksZ dks djkus gsrq dk;Z dk fooj.k %&
Loading, unloading and safe carriage of following materials from Store Centre, Gorakhpur to JE dump Store and JE dump Store to work site with proper stacking :-
250 KVA Transformer
Fabrication, errection, commissioning & Testing of 250 KVA T/F on Plinth with all accessories including make its LT and HT connection. All neessary materials will be supplied by the Contractor.
Chemical earthing of Transformer (Body+Neutral) as per IS Code 3043 - 1987 specification (Materials will be provided by contractor)
Construction of T/F plinth of size 2x2x1.2 M with the help of first class brick & 9" masonary in the ratio 1:4 cement & sand coarse. Filling the structure completely and plastering outer surface as per RESPO norms. Top of the plinth covered with 4" RCC Slab of ratio 1:1.5:3 (Cement, sand & concrete) grouting with 2 No ISMC size 125X65X6 MM (confirming to IS 808:1989) of 2000 mm long for resting. All required materials will be provided by the contractor.
fo|qr uxjh; forj.k [k.M&f}rh;] xksj[kiqj ds vUrxZr fctusl Iyku 2023&24 esa Lohd`r iSdst la[;k 30@2023&24 ¼eSSuk nsoh Ldwy] usrkth lqHkk"kpUnz cksl uxj] lwjtdq.M] xksj[kiqj esa 250 ds0oh0,0 ifjorZd dh LFkkiuk dk dk;Z½ ds dk;ksZ dks djkus gsrq dk;Z dk fooj.k %&
Loading, unloading and safe carriage of following materials from Store Centre, Gorakhpur to JE dump Store and JE dump Store to work site with proper stacking :-
250 KVA Transformer
ST Pole 11 mtr long
LT Cable 1X240
11 KV Top Channel
11 KV Dropper Angle
11 KV Fuse Set
SS Base Angle
11 KV Pin insulator
Earthing Complete
ACSR weasel conductor
Supply of following material/fitting complete in all respect :-
Holding Clamp for top, dropper channel Fuse set etc with nuts & bolts
Copper Z Calmp for 250 KVA T/F
Nuts & bolts of different sizes
Al Lugs
The excavation of 2 No foundation pit of size 750mmX450mm and having depth of 1/6th of the full length of the pole. Fabrication & erection of double Pole with fixing of necessary clamps & accessories (Top Channel, Dropper Angle etc.) as per required. All required materials such as Holding clamp/STP clamp, Nuts & Bolts off size etc will be provided by the contractor. Grouting of Pole in cc 1:4:8 (Cement, sand & 40 mm brick ballast), Grouting will be done in the block of size 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc (Material provided by Contractor). Making plinth around Pole height 300 mm above ground level with top 100 mm is kept tapered so that no rainwater gets accumulated on the top. All work will be done as per RESPO norms & relevent IS Specification.
Painting of Pole by double coating Aluminium & Red oxide paint. Paint will be provided by contractor
Earthing of ST Pole by MS earthing Rod & 6 SWG earthing Wire as per RESPO norms.
Fabrication, errection, commissioning & Testing of 250 KVA T/F on Plinth with all accessories including make its LT and HT connection. All neessary materials will be supplied by the Contractor.
Chemical earthing of Transformer (Body+Neutral) as per IS Code 3043 - 1987 specification (Materials will be provided by contractor)
Erection of 11 KV Fuse set
fo|qr uxjh; forj.k [k.M&f}rh;] xksj[kiqj ds vUrxZr fctusl Iyku 2023&24 esa Lohd`r iSdst la[;k 42@2023&24 ¼33@11 ds0oh0 fo|qr midsUnz nqxkZckM+h ds 33 ds0oh0 Hkwfexr ykbu esa QkYV vkus dh fLFkfr esa oSdfYid vkiwfr iznku djus gsrq ykbu fuekZ.k dk dk;Z½ ds dk;ksZ dks djkus gsrq dk;Z dk fooj.k %&
Loading, unloading and safe carriage of following materials from Store Centre, Gorakhpur to JE dump Store and JE dump Store to work site with proper stacking :-
ST Pole 11 mtr long
ACSR Dog conductor
33 KV Pin insulator with Pin
T-off Angle
33 KV Disc insulator with fitting
G.I. Wire
Guarding angle
Earthing complete
Supply of following material/fitting complete in all respect :-
Nuts & bolts of different sizes
T-off clamp
Guarding angle clamp
PG clamp for Dog
The excavation of 1 No foundation pit of size 750mmX450mm and having depth of 1/6th of the full length of the pole. Fabrication & erection of single Pole with fixing of necessary clamps & accessories (Top Channel, Dropper Angle etc.) as per required. All required materials such as Holding clamp/STP clamp, Nuts & Bolts off size etc will be provided by the contractor. Grouting of Pole in cc 1:4:8 (Cement, sand & 40 mm brick ballast), Grouting will be done in the block of size 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc (Material provided by Contractor). Making plinth around Pole height 300 mm above ground level with top 100 mm is kept tapered so that no rainwater gets accumulated on the top. All work will be done as per RESPO norms & relevent IS Specification.
Painting of Pole by double coating Aluminium & Red oxide paint. Paint will be provided by contractor
Earthing of ST Pole by MS earthing Rod & 6 SWG earthing Wire as per RESPO norms.
Laying, stringing, sagging, binding and jumpering of ACSR Dog conductor for HT Line with fixing of PG Clamps/other clamps and nuts&bolts off size as per required.
Laying, stringing & sagging of G.I. wire including erection of Guarding angle
fo|qr uxjh; forj.k [k.M&prqFkZ] xksj[kiqj ds vUrxZr fctusl Iyku 2023&24 esa Lohd`r iSdst la[;k 31@2023&24 ¼fo".kqiqje dkyksuh esa 250 ds0oh0,0 ifjorZd dh LFkkiuk dk dk;Z½ ds dk;ksZ dks djkus gsrq dk;Z dk fooj.k %&
Loading, unloading and safe carriage of following materials from Store Centre, Gorakhpur to JE dump Store and JE dump Store to work site with proper stacking :-
250 KVA Transformer
ST Pole 11 mtr long
ACSR weasel conductor
11 KV Pin insulator with Pin
11 KV Disc insulator with fitting
11 KV Top Channel
11 KV Dropper Angle
MS angle 75X75X6X2028 mm with clamps & bolt & nut (T/F Base)
Earthing Complete
11 KV T-off channel
LT clamp for PCC
Clamp for T-off channel
LT cable Al. 1X240 Sq.mm.
Supply of following material/fitting complete in all respect :-
Copper Z Calmp
Al Lugs
LT Shackle insulator 100X115 mm
Nuts & bolts of different sizes
Holding Clamp for top, dropper channel Fuse set etc with nuts & bolts
The excavation of 2 No foundation pit of size 750mmX450mm and having depth of 1/6th of the full length of the pole. Fabrication & erection of double Pole with fixing of necessary clamps & accessories (Top Channel, Dropper Angle etc.) as per required. All required materials such as Holding clamp/STP clamp, Nuts & Bolts off size etc will be provided by the contractor. Grouting of Pole in cc 1:4:8 (Cement, sand & 40 mm brick ballast), Grouting will be done in the block of size 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc (Material provided by Contractor). Making plinth around Pole height 300 mm above ground level with top 100 mm is kept tapered so that no rainwater gets accumulated on the top. All work will be done as per RESPO norms & relevent IS Specification.
Painting of Pole by double coating Aluminium & Red oxide paint. Paint will be provided by contractor
Earthing of ST Pole by MS earthing Rod & 6 SWG earthing Wire as per RESPO norms.
Fabrication, errection, commissioning & Testing of 250 KVA T/F on Plinth with all accessories including make its LT and HT connection. All neessary materials will be supplied by the Contractor.
Chemical earthing of Transformer (Body+Neutral) as per IS Code 3043 - 1987 specification (Materials will be provided by contractor)
Laying, stringing, sagging, binding and jumpering of ACSR Weasel conductor for LT/HT Line with fixing of LT Clamps/other clamps, Shackle insulator and nuts&bolts off size as per required.
M/s Anil kumar singh
M/s Arya Construction
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .